A Method For Intersystem Change Of A Wireless Terminal

Nec Corporation
Granted App No 201948005458 Patent 481077 Communication

Patent information

IP India · live record
Application number
201948005458
Filing date
12 February 2019
Status
Granted
Legal status
Inforce
Publication number
15/2019
Publication type
INA
Invention field
Communication
Patent number
481077
Grant date
12 December 2023
Next renewal due
15 March 2026Overdue

Abstract

A method is provided having the steps of receiving a mobility command from a first Radio Access Network (RAN), performing a cell change order to a second RAN; and deactivating, when a user equipment (UE) moves from the first RAN connected mode to the second RAN via the cell change order, an Idle mode Signaling Reduction (ISR) by setting a temporary identifier (TIN) to globally unique temporary identifier (GUTI) before initiating a routing area (RA) update procedure.

Applicants

1
Japan
NEC Corporation 7-1, Shiba 5-chome, Minato-ku, Tokyo 108-8001.

Inventors

3
U.K.
IANEV, Iskrenc/o NEC Technologies (UK) Ltd., The Imperium, Imperial Way, Reading, Berkshire RG2 0TD, United Kingdom.
U.K.
LAIR, Yannickc/o NEC Technologies (UK) Ltd., The Imperium, Imperial Way, Reading, Berkshire RG2 0TD, United Kingdom.
Japan
GOTOU, Kouheic/o NEC Corporation , 7-1, Shiba 5-chome, Minato-ku, Tokyo 108-8001.

Specification

Show full textCollapse

claim 1

A method comprising: receiving a mobility command from a first Radio Access Network (RAN), performing a cell change order to a second RAN; and deactivating, when a user equipment (UE) moves from the first RAN connected mode to the second RAN via the cell change order, an Idle mode Signaling Reduction (ISR) by setting a temporary identifier (TIN) to globally unique temporary identifier (GUTI) before initiating a routing area (RA) update procedure.

claim 2

The method according to claim 1, wherein the UE is configured to be registered with both a first apparatus via the first RAN and a second apparatus via the second RAN.

claim 3

The method according to claim 1, wherein the first RAN is Evolved Universal Terrestrial Radio Access Network (E-UTRAN) and the second RAN is GSM EDGE Radio Access Network (GERAN).

claim 4

The method according to claim 1, wherein the RA update procedure is initiated by an access trigger signal, the access trigger signal being a RAU (Routing Area Update) message.

claim 5

The method according to claim 2, wherein the first apparatus is Mobility Management Entity (MME), and wherein the second apparatus is Serving GPRS Support Node (SGSN).

claim 6

A user equipment (UE) comprising: a receiver configured to receive a mobility command from a first Radio Access Network (RAN), a processor configured to perform a cell change order to a second RAN, wherein the processor configured to deactivate, when the UE moves from the first RAN connected mode to the second RAN via the cell change order, an Idle mode Signaling Reduction (ISR) by setting a temporary identifier (TIN) to globally unique temporary identifier (GUTI) before initiating a routing area (RA) update procedure.

claim 7

The user equipment according to claim 6, wherein the UE is configured to be registered with both a first apparatus via the first RAN and a second apparatus via the second RAN.

claim 8

The user equipment according to claim 6, wherein the first RAN is Evolved Universal Terrestrial Radio Access Network (E-UTRAN) and the second RAN is GSM EDGE Radio Access Network (GERAN).

claim 9

The user equipment according to claim 6, wherein the RA update procedure is initiated by an access trigger signal, the access trigger signal being a RAU (Routing Area Update) message.

claim 10

The user equipment according to claim 7, wherein the first apparatus is Mobility Management Entity (MME), and wherein the second apparatus is Serving GPRS Support Node (SGSN).

Documents

Sign in to open
Application documents
1 201948005458-TRANSLATIOIN OF PRIOIRTY DOCUMENTS ETC. [12-02-2019(online)].pdf 12 Feb 2019
2 201948005458-STATEMENT OF UNDERTAKING (FORM 3) [12-02-2019(online)].pdf 12 Feb 2019
3 201948005458-REQUEST FOR EXAMINATION (FORM-18) [12-02-2019(online)].pdf 12 Feb 2019
4 201948005458-PRIORITY DOCUMENTS [12-02-2019(online)].pdf 12 Feb 2019
5 201948005458-POWER OF AUTHORITY [12-02-2019(online)].pdf 12 Feb 2019
6 201948005458-FORM 18 [12-02-2019(online)].pdf 12 Feb 2019
7 201948005458-FORM 1 [12-02-2019(online)].pdf 12 Feb 2019
8 201948005458-FIGURE OF ABSTRACT [12-02-2019(online)].jpg 12 Feb 2019
9 201948005458-DRAWINGS [12-02-2019(online)].pdf 12 Feb 2019
10 201948005458-DECLARATION OF INVENTORSHIP (FORM 5) [12-02-2019(online)].pdf 12 Feb 2019
11 201948005458-COMPLETE SPECIFICATION [12-02-2019(online)].pdf 12 Feb 2019
12 201948005458-CLAIMS UNDER RULE 1 (PROVISIO) OF RULE 20 [12-02-2019(online)].pdf 12 Feb 2019
13 abstract 201948005458.jpg 15 Feb 2019
14 201948005458-Proof of Right (MANDATORY) [16-04-2019(online)].pdf 16 Apr 2019
15 Correspondence by Agent_Form 1_22-04-2019.pdf 22 Apr 2019
16 201948005458-FORM 3 [01-08-2019(online)].pdf 01 Aug 2019
17 201948005458-Information under section 8(2) [18-05-2021(online)].pdf 18 May 2021
18 201948005458-FORM 4(ii) [18-05-2021(online)].pdf 18 May 2021
19 201948005458-OTHERS [18-08-2021(online)].pdf 18 Aug 2021
20 201948005458-Information under section 8(2) [18-08-2021(online)].pdf 18 Aug 2021
21 201948005458-FORM-26 [18-08-2021(online)].pdf 18 Aug 2021
22 201948005458-FORM 3 [18-08-2021(online)].pdf 18 Aug 2021
23 201948005458-FER_SER_REPLY [18-08-2021(online)].pdf 18 Aug 2021
24 201948005458-DRAWING [18-08-2021(online)].pdf 18 Aug 2021
25 201948005458-CLAIMS [18-08-2021(online)].pdf 18 Aug 2021
26 201948005458-FER.pdf 18 Oct 2021
27 201948005458-PatentCertificate12-12-2023.pdf 12 Dec 2023
28 201948005458-IntimationOfGrant12-12-2023.pdf 12 Dec 2023
Search strategy
12020-10-2116-55-40E_21-10-2020.pdf

ERegister / renewals

Inforce
3rd Renewed 28 Dec 2023 Period 15 Mar 2015 – 15 Mar 2016 · CBR 61398 · Certificate 124774 ₹4,000
4th Renewed 28 Dec 2023 Period 15 Mar 2016 – 15 Mar 2017 · CBR 61398 · Certificate 124775 ₹4,000
5th Renewed 28 Dec 2023 Period 15 Mar 2017 – 15 Mar 2018 · CBR 61398 · Certificate 124776 ₹4,000
6th Renewed 28 Dec 2023 Period 15 Mar 2018 – 15 Mar 2019 · CBR 61398 · Certificate 124777 ₹4,000
7th Renewed 28 Dec 2023 Period 15 Mar 2019 – 15 Mar 2020 · CBR 61398 · Certificate 124778 ₹12,000
8th Renewed 28 Dec 2023 Period 15 Mar 2020 – 15 Mar 2021 · CBR 61398 · Certificate 124779 ₹12,000
9th Renewed 28 Dec 2023 Period 15 Mar 2021 – 15 Mar 2022 · CBR 61398 · Certificate 124780 ₹12,000
10th Renewed 28 Dec 2023 Period 15 Mar 2022 – 15 Mar 2023 · CBR 61398 · Certificate 124781 ₹12,000
11th Renewed 28 Dec 2023 Period 15 Mar 2023 – 15 Mar 2024 · CBR 61398 · Certificate 124782 ₹24,000
12th Renewed 28 Dec 2023 Period 15 Mar 2024 – 15 Mar 2025 · CBR 61398 · Certificate 124783 ₹24,000
13th Renewed 12 Mar 2025 Period 15 Mar 2025 – 15 Mar 2026 · CBR 14445 · Certificate 19202 ₹24,000