Abstract: Disclosed herein is power flow controller and method for providing vehicle to grid (V2G) power flow control. The method comprises receiving battery current value (Ibat) and battery voltage value (Vbat) of the battery. Based on the (Ibat) and (Vbat), method comprises computing a battery power value (P) of the battery. Further, reference current value (Id_ref) is generated based on the battery power value (P). The reference current value (Id_ref) is provided to a decoupled d-q controller to generate voltage vector values (Vd_ref and Vq_ref). Further, inverter pulse width modulation signals are generated based on the Vd_ref and Vq_ref. On the other hand, the DC-DC pulse width modulation signals are generated and provided to DC-DC converter in such a manner that the DC-DC converter generates desired voltage (Vdc) which is fed to the active frontend inverter to further enable the active frontend inverter to facilitate the V2G power flow control
DESC:PLEASE REFER THE ATTACHMENT ,CLAIMS:PLEASE REFER THE ATTACHMENT
| # | Name | Date |
|---|---|---|
| 1 | 202141041683-STATEMENT OF UNDERTAKING (FORM 3) [15-09-2021(online)].pdf | 2021-09-15 |
| 2 | 202141041683-PROVISIONAL SPECIFICATION [15-09-2021(online)].pdf | 2021-09-15 |
| 3 | 202141041683-POWER OF AUTHORITY [15-09-2021(online)].pdf | 2021-09-15 |
| 4 | 202141041683-FORM 1 [15-09-2021(online)].pdf | 2021-09-15 |
| 5 | 202141041683-DRAWINGS [15-09-2021(online)].pdf | 2021-09-15 |
| 6 | 202141041683-DECLARATION OF INVENTORSHIP (FORM 5) [15-09-2021(online)].pdf | 2021-09-15 |
| 7 | 202141041683-Proof of Right [05-04-2022(online)].pdf | 2022-04-05 |
| 8 | 202141041683-Power of Authority [16-09-2022(online)].pdf | 2022-09-16 |
| 9 | 202141041683-PETITION u-r 6(6) [16-09-2022(online)].pdf | 2022-09-16 |
| 10 | 202141041683-DRAWING [16-09-2022(online)].pdf | 2022-09-16 |
| 11 | 202141041683-Covering Letter [16-09-2022(online)].pdf | 2022-09-16 |
| 12 | 202141041683-CORRESPONDENCE-OTHERS [16-09-2022(online)].pdf | 2022-09-16 |
| 13 | 202141041683-COMPLETE SPECIFICATION [16-09-2022(online)].pdf | 2022-09-16 |
| 14 | 202141041683-FORM 18 [28-09-2023(online)].pdf | 2023-09-28 |
| 15 | 202141041683-FER.pdf | 2024-12-18 |
| 16 | 202141041683-FORM 3 [02-01-2025(online)].pdf | 2025-01-02 |
| 17 | 202141041683-PETITION UNDER RULE 137 [18-03-2025(online)].pdf | 2025-03-18 |
| 18 | 202141041683-OTHERS [18-03-2025(online)].pdf | 2025-03-18 |
| 19 | 202141041683-FORM-26 [18-03-2025(online)].pdf | 2025-03-18 |
| 20 | 202141041683-FER_SER_REPLY [18-03-2025(online)].pdf | 2025-03-18 |
| 21 | 202141041683-COMPLETE SPECIFICATION [18-03-2025(online)].pdf | 2025-03-18 |
| 22 | 202141041683-CLAIMS [18-03-2025(online)].pdf | 2025-03-18 |
| 23 | 202141041683-US(14)-HearingNotice-(HearingDate-07-05-2025).pdf | 2025-03-28 |
| 24 | 202141041683-Correspondence to notify the Controller [02-04-2025(online)].pdf | 2025-04-02 |
| 25 | 202141041683-Written submissions and relevant documents [19-05-2025(online)].pdf | 2025-05-19 |
| 26 | 202141041683-PatentCertificate11-07-2025.pdf | 2025-07-11 |
| 27 | 202141041683-IntimationOfGrant11-07-2025.pdf | 2025-07-11 |
| 1 | 202141041683ferE_17-12-2024.pdf |