Communication Apparatus Communication System Control Method

Nec Corporation
Granted App No 201717037207 Patent 461784 Communication

Patent information

IP India · live record
Application number
201717037207
Filing date
20 October 2017
Status
Granted
Legal status
Inforce
Publication number
51/2017
Publication type
INA
Invention field
Communication
Patent number
461784
Grant date
25 October 2023
Next renewal due
17 March 2027

Abstract

In an architecture in which a gateway is present between a base station and a higher level device the base station used for the gateway to appropriately transmit information regarding the position of a terminal device and another base station are connected to the same gateway. The base station includes: a receiving unit that is capable of receiving a message from the gateway; and a transmitting unit that transmits to the gateway first information regarding the position of the terminal device and second information regarding a cell change in the case where the terminal device has moved from a cell covered by the other base station.

Applicants

1
Japan
NEC CORPORATION 7 1 Shiba 5 chome Minato ku Tokyo 1088001

Inventors

1
Japan
OKADA Masaakic/o NEC CORPORATION 7 1 Shiba 5 chome Minato ku Tokyo 1088001

Claims

8
1 A base station connected with a gateway that is also connected with another base station, the base station comprising: a receiving unit that receive s a message from the gateway; 5 and a transmitting unit that transmits, to the gateway, a Path Switch Request message that includes a Request Type IE and at least either one of an ECGI and a TAI indicating a location of a terminal device when the terminal device is moved from a cell covered by the 10 another base station.
2 A base station connected with a gateway that is also connected with another base station, the base station comprising: a receiving unit that receive s a message from the gateway; 15 and a transmitting unit that transmits, to the gateway, first information on a location of a terminal device and second information on a change of a cell when the terminal device is moved from the cell covered by the another base station. 20
3 The base station according to claim 2, wherein the second information is information on a condition for the gateway to transmit the first information to a n uplink device that is connected with the gateway. 25
4 The base station according to claim 2 or 3, where in the second information is information that is included in a Request Type IE. 22
5 The base station according to any one of claims 2 to 4, wherein the first information is at least either one of an ECGI or a TAI. 5 6. The base station according to any one of claims 2 to 5, wherein the transmitting unit adds the second information to a Path Switch Request message, and transmits the Path Switch Request message to the gateway. 10 7. The base station according to any one of claims 2 to 6, wherein the gateway is an HeNB-GW.
8 The base station according to any one of claims 2 to 7, wherein the another base station is an HeNB . 15
9 A gateway that terminates a first base station and a second base station, the gateway comprising: a transmitting unit that transmit s a message to the second base station; and, 20 a receiving unit that receives, from the second base station, first information on a location of a terminal device and second information on a change of a cell when the terminal device moves from the cell covered b y the first base station to the cell covered by the second base station. 25
10 A gateway in a communication system comprising a first base station, a second base station, the gateway connected with the first base station and the second base station, and a n uplink device connected with the gateway, the gateway comprising: 23 a receiving unit that receives a Path Switch Request message from the second base station when a terminal device moves from a cell covered by the first base station to a cell covered by the second base station; and 5 a transmitting unit that transmits, to the uplink device, the terminal device’s location information that is included in the Path Switch Request message. Dated this 20th day of October 2017

Specification

Show full textCollapse

[Document Name] DESCRIPTION [Title of Invention] COMMUNICATION APPARATUS, COMMUNICATION SYSTEM, CONTROL METHOD

Technical Field

5 [0001] The present invention relates to a communication apparatus, a communication system, and a control method in a radio communication network. [Background Art] 10 [0002] There are various services to be provided to terminal devices depending on locations of the terminal devices. Therefore, a base station or the like needs to collect and notify information on a current location of a terminal device. NPL 1 discloses Information 15 Element (Request Type) that includes a condition for a base station to transmit, to an uplink device, the information on the location of the terminal device (hereinafter referred to as “the location information on the terminal device”). Specifically, an MME (Mobility Management Entity) designates a condition (Event 20 parameter on Request Type IE) for the eNB (eNodeB) to transmit, to the MME, the location information on the terminal device. The eNB transmits, to the MME, the location information on the terminal device according to the designation. [0003] 25 Hereinafter, descriptions are based on an example in which an MME designates a condition (Event parameter) that an eNB transmits a location information on a terminal to the MME, and the eNB transmits the location information to the MME at each time a serving cell is changed . The terminal device conducts a handover

3 (hereinafter referred to as “Handover” or “HO”) from the eNB (also referred to as “source eNB”) to another eNB (also referred to as “Target eNB”), so that the serving cell is changed. Conduction of the handover by the terminal device enables satisfying the condition 5 for the eNB to transmit the location information on the terminal device to the MME, and therefore, a handover-destination eNB transmits the location information on the terminal device to the MME.

C it ation Li st

10 [Patent Literature]

[0004] [PTL 1] Japanese Unexamined Patent Publication (Kokai) No.2013-051670

Non Patent Literature

15 [0005] [NPL 1] 3GPP TS36.413 v12.4.0 [NPL 2] 3GPP TS36.300 v12.4.0

Summary of Invention

Technical Problem

20 [0006] In the meantime, NPL 2 discloses an HeNB-GW (Home eNodeB GateWay) that aggregates one or more HeNBs (Home eNodeB). The HeNB-GW has a function to terminate a processing of S1 Path Switch message at the time of an X2HO between 25 subordinate HeNBs.

[0007] In an architecture which does not have any gateway between the base station and the uplink device, each device can transmit and receive the location information on the terminal device by the

4 operation disclosed in NPL 1. On the other hand, NPLs 1 and 2 do not disclose at all, in the architecture which has the gateway between the base station and the uplink device, how the gateway operates to transmit the location information on the terminal device 5 when the terminal device conducts the X2HO from the base station that is not under the gateway (hereinafter referred to as “external base station”) to the base station that is under the gateway.

[0008] Therefore, in the architecture which has the gateway between 10 the base station and the uplink device, the gateway may not determine whether to transmit, to the uplink device, the location information on the terminal device when the terminal device conducts the X2HO from an external base station to the base station that is under the gateway. In other words, in the architecture 15 which has the gateway between the base station and the uplink device, when the terminal device conducts the X2HO from the external base station to the base station under the gateway, the gateway may not appropriately tr ansmit, to the uplink device, the location information on the terminal device when terminating the 20 processing of the S1 Path Switch message that is transmitted from a destination base station at the time of the X2HO between the base stations under the gateway. [0009] Further, using an alternative expression, it can also be said 25 that the base station cannot transmit, to the gateway, information for determining whether to transmit, to the uplink device, the location information on the terminal device when th e terminal device conducts the X2HO from the external base station to the base station that is under the gateway.

5 [0010] Whereat, one of objects to be achieved through example embodiments described in the present description is to provide a gateway device, a base station, a communication system and the like 5 which enable the gateway to appropriately transmit information on a location of a terminal device, in an architecture which has a gateway between the base station and a n uplink device.

Solution to Problem

[0011] 10 A base station, according to the present example embodiment, is the base station connected with a gateway that is also connected with another base station, the base station compris es: a receiving unit that receive s a message from the gateway; and 15 a transmitting unit that transmits, to the gateway, a Path Switch Request message that includes a Request Type IE and at least either one of an ECGI and a TAI indicating a location of a terminal device when the terminal device is moved from a cell covered by the another base station. 20 [0012] A base station, according to the present example embodiment, is the base station connected with a gateway that is also connected with another base station, the base station compris es: a receiving unit that receive s a message from the gateway; 25 and a transmitting unit that transmits, to the gateway, first information on a location of a terminal device and second information on a change of a cell when the terminal device is moved from the cell covered by the another base station.

6 [0013] A gateway, according to the present example embodiment, is the gateway in a communication system comprising a first base station, a second base station, the gateway connected with the first 5 base station and the second base station, and an uplink device connected with the gateway, the gateway compris es: a receiving unit that receives a Path Switch Request message from the second base station when a terminal device moves from a cell covered by the first base station to a cell covered by the second 10 base station; and a transmitting unit that transmits, to the uplink device, the terminal device’s location information that is included in the Path Switch Request message.

Advantageous Effects of Invention

15 [0014] According to the above described example embodiments, the gateway can appropriately transmit information on the location of the terminal device, in the architecture which has the gateway between the base station and the uplink device. 20 [Brief Description of Drawings]

[0015] Fig.1 is a configuration diagram of a communication system according to first example embodiment. Fig.2 is a block diagram of a base station according to the 25 first example embodiment. Fig.3 is a block diagram of a gateway according t o the first example embodiment. Fig.4 is an example of Request Type according to the first example embodiment.

7 Fig.5 is an example of Path Switch Request message according to the first example embodiment. Fig.6 is a sequence diagram of operations of the communication system according to the first example embodiment. 5 Fig.7 is the configuration diagram of the communication system according to the first example embodiment. Fig.8 is a block diagram of a gateway according to a second example embodiment. Fig.9 is a sequence diagram of operations of a communication 10 system according to the second example embodiment. Fig.10 is a block diagram of a gateway. [Description of Embodiments] [0016] Hereinafter, specific example embodiments are described in 15 details with reference to the drawings. In each drawing, an identical or corresponding component is denoted by an identical reference numeral, and duplicated description is omitted as needed to cl ar if y th e des criptio n.

[0017] 20 A plurality of example embodiments described below may be carried out independently or appropriately combined to be carried out. The plurality of example embodiments have new features which are different from one another. Therefore, the plurality of example embodiments are used for achieving objects or solving 25 problems which are different from one another, and are used for yielding advantageous effects which are different from one another. [0018] Fig.1 illustrates a configuration example of the

8 communication system according to the present example embodiment. The communication system provides a communication service, for example, sound communication or packet data communication, or both thereof. Referring to Fig.1, 5 the communication system includes a fir st base station 100, a second base station 200, a gateway 300, a terminal device (also referred to as UE or User Equipment) 400 and an uplink device 500.

[0019] Note that the gateway 300 has a function to terminate the first 10 base station 100 and the second base station 200. Further, the uplink device 500 is connected with the gateway 300. [0020] Fig.2 illustrates an example configuration of the second base station 200 according to the present example embodiment. 15 [0021] The second base station 200 has at least a receiving unit 20 and a transmitting unit 21. [0022] The receiving unit 20 is connected to external devices in a 20 wired or wireless manner and receives various pieces of information from the external devices. In the present example embodiment, the receiving unit 20 can receive various messages at least from the gateway 300. [0023] 25 The transmitting unit 21 transmits, to the gateway 300, information on the condition (Event parameter of Request Type IE) for the gateway 300 to transmit, to the uplink device 500, information on the location of the terminal device 400 (hereinafter referred to as “the location information on the terminal device 400”)

9 (hereinafter referred to as “condition information”). Note that, when the terminal device 400 moves from the first base station 100 to the second base station 200, the transmitting unit 21 transmits the condition information to the gateway 300. Specifically, for example, 5 after the second base station 200 receives Handover Requset message from the first base station 100 and then transmits Handover Requset ACK message to the first base station 100, the transmitting unit 21 may transmit the condition information to the gateway 300.

[0024] 10 Fig.3 illustrates a configuration example of the gateway 300 according to the present example embodiment. [0025] The gateway 300 at least includes a transmitting unit 30 and a receiving unit 31. 15 [0026] The transmitting unit 30 can transmit various messages to the second base station 200. [0027] The receiving unit 31 receives the condition information from 20 the second base station 200.

[0028] Note that the condition information may be information that is included in Request Type IE. Fig.4 illustrates an example of the condition information included in Request Type IE. Here, the 25 condition information corresponds to Event information illustrated in Fig.4. The Event represents a condition that a device receiving information illustrated in Fig.4 transmit s the location information on the terminal device 400 to another device. The Event is information indicating any one of “Direct”, “Change of serving cell”

10 and “Stop Change of serving cell.”

[0029] Further, when the Event is information indicating “Direct”, the base station that has received the information transmits the 5 location information on the terminal device 400 to the uplink device 500 or the gateway 300. [0030] When the Event is information indicating “Change of serving cell”, the base station that has received the information transmits 10 the location information on the terminal device 400 to the uplink device 500 or the gateway 300 if the serving cell is changed. [0031] When the Event is information indicating “Stop Change of serving cell,” the base station that has received the information 15 stops transmitting the location information on the terminal device 400 to the uplink device 500 or the gateway 300. [0032] Note that the location information on the terminal device 400 may be at least either an ECGI (E-UTRAN Cell Global ID) or a TAI 20 (Tracking Area ID).

[0033] Further, the condition information may be included in a Path Switch Request message. As an example, Fig.5 illus trates an example of the condition information that is included in a Request 25 Type IE and the Request Type IE that is included in the Path Switch Request message. [0034] Note that the gateway 300 may be an HeNB-GW, the first base station 100 and the second base station 200 may be HeNBs, and the

11 uplink device 500 may be an MME.

[0035] Next, operations of the communication system according to the present example embodiment will be described with reference to 5 Fig.6. As an example, Fig.6 illustrates a case of the condition information that is included in the Request Type IE and the Request Type IE that is included in the Path Switch Request message.

[0036] When the terminal device 400 conducts the X2HO from the 10 external base station to the first base station 100 and further conducts X2-handover from the first base station 100 to the second base station 200, at step S10, the first base station 100 transmits, to the second base station 200, the Handover Request message. The Handover Request message includes the Request Type IE. Note 15 that the Request Type IE includes the condition information.

[0037] At step S20, the second base station 200 transmits, to the first base station 100, the Handover Request Ack message. [0038] 20 At step S30, the second base station 200 transmits the Path Switch Request message to the gateway 300. The Path Switch Request message includes the Request Type IE. Note that the Request Type IE includes the condition information. [0039] 25 Note that the gateway 300 which receives the Path Switch Request message from the second base station 200 conducts a process of a path switching from the first base station 100 to the second base station 200, and further, based on the condition information include d in the Path Switch Request message,

12 determines whether to transmit the location information on the terminal device 400 to the uplink device 500. Specifically, when the condition information in the Path Switch Request message that is received from the second base station 200 indicates that the serving 5 cell is changed under a condition for the gateway 300 to transmit the location information on the terminal device 400 to the uplink device 500, the gateway 300 conducts operations of step S40. On the other hand, when the condition information in the Path Switch Request message that is received from the second base station 200 10 indicates that the serving cell is not changed under the condition for the gateway 300 to transmit the location information on the terminal device 400 to the uplink device 500, the gateway 300 conducts operations of step S50 and steps thereafter instead of conducting operation of step S40. 15 [0040] At step S40, the gateway 300 transmits the location information on the terminal device 400 to the uplink device 500. Note that the location information on the terminal device 400 ma y be included in the Location Report message. 20 [0041] At step S50, the gateway 300 transmits the Path Switch Request Ack message to the second base station 200. [0042] At step S60, the second base station 200 transmits an UE 25 Context Release message to the first base station 100.

[0043] According to the present example embodiment, for example, following problems can be solved. Fig.7 illustrates an example communication system. The communication system illustrated in

13 Fig.7 includes an MME1, an HeNB-GW2, an eNB3, an HeNB4, an HeNB5 and a UE6.

[0044] The HeNB4 and the HeNB5 are terminated by the HeNB -GW2. 5 On the other hand, the eNB3 is not terminated by the HeNB -GW2. The MME1 is connected with the eNB3 and the HeNB-GW2. First, when the UE6 is connected with the eNB3, the MME1 transmits, to the eNB3, information on condition (Event parameter of Request Type IE) for reporting, to the MME1, the location information on the 10 UE6 (hereinafter referred to as “condition information”). Note that the condition information may be included in the Location Reporting Control message. [0045] Hereinafter, as an example, description is based on an 15 example where the condition information is equivalent to a change of the serving cell (Event=Change of serving cell). [0046] When the UE6 conducts a handover from the eNB3 to the HeNB4, the HeNB4 transmits the Path Switch Request message to 20 the HeNB-GW2. The Path Switch Request message includes the location information (ECGI and TAI) on the UE6. The HeNB-GW2 that receives the Path Switch Request message then transmits the Path Switch Request message to the MME1 for switching a path established between the eNB3 and the MME1 to a path between the 25 HeNB-GW2 and the MME1. The Path Switch Request message transmitted from the HeNB-GW2 also includes the location information (ECGI and TAI) on the UE6. Accordingly, the HeNB-GW2 can transmit the location information on the UE6 to the MME1.

14 [0047] Alternatively, when the UE6 conducts a handover from the HeNB4 to the HeNB5, the HeNB5 transmits the Path Switch Request message to the HeNB-GW2. Here, the handover from the HeNB4 to 5 the HeNB5 is terminated at the HeNB-GW2 because the HeNB4 and the HeNB5 pertain to the same HeNB-GW2. In other words, when the UE6 conducts the handover from the HeNB4 to the HeNB5, a device at a level higher than that of the HeNB-GW2 does not need to switch the path. Therefore, the HeNB-GW2 does not transmit the 10 Path Switch Request message to the MME1. Accordingly, in this case, the MME1 does not receive the location information on the UE6. [0048] Further, as a trigger for the base st ation (for example, eNB 15 and HeNB) to transmit the location information on the UE to the uplink device (for example, MME), the Location Report message may be transmitted in response to receiving the Location Reporting Control message from the uplink device. However, at the time of the X2HO, the Location Report message is not transmitted because 20 when an S1AP message such as the Path Switch Request message is transmitted, such message includes an ECGI (E -UTRAN Cell Global ID) or a TAI (Tracking Area ID). Therefore, in the case that the UE6 conducts the handover from the HeNB4 to the HeNB5, when the HeNB-GW2 receives the Path Switch Request message, not only 25 switching of paths in the HeNB-GW2 but also determining whether to transmit the location information on the UE6 to the MME1 is needed. However, according to the current standard 3GPP (3rd Generation Partnership Project), the HeNB -GW2 does not have information needed for the determination. Therefore, the

15 HeNB-GW2 may not determine whether the location information on the UE6 needs to be transmitted to the MME1.

[0049] As a solution to the above described problem, according to 5 the present example embodiment, the second base station 200 transmits the condition information to the gateway 300, so that the gateway 300 can determine whether to transmit the location information on the terminal device 400 to the uplink device 500. Accordingly, the gateway 300 can appropriately transmit the 10 location information on the terminal device 40 0 to the uplink device 500. [0050] In the first example embodiment, the base station transmits, 15 to the gateway, information on the condition for the gateway to transmit the location information on the terminal device to the uplink device, thereby the gateway can appropriately transmit the location information on the terminal device to the uplink device. [0051] 20 Subsequently, according to the second example embodiment, when the gateway receives the Path Switch Request message fro m the subordinate base stations, the gateway, by necessity, transmits, to the uplink device, the location information on the terminal device to enable the gateway to certainly transmit, to the uplink device, the 25 location information on the terminal device.

[0052] Note that the configuration example of the communication system according to the present example embodiment is the same as that of the first example embodiment. Further, a first base station

16 110, a second base station 210, a gateway 310, a terminal device 410 and an uplink device 510 of the present example embodiment respectively correspond to the f irst base station 100, the second base station 200, the gateway 300, the terminal device 400 and the 5 uplink device 500 of the first example embodiment.

[0053] Fig.8 illustrates a configuration example of the gateway 310 according to the second example embodiment.

[0054] 10 The gateway 310 at least includes the transmitting unit 32 and the receiving unit 33. [0055] The transmitting unit 32 transmits, to the uplink device 510, information on a location of the terminal device 410 (hereinafter 15 referred to as “the location information on the terminal device 410”) which information is included in the Path Switch Request message . [0056] The receiving unit 33 receives, from the second base station 210, information on a condition (Event parameter of Request Type 20 IE) for transmitting the location information on the terminal device 410 (hereinafter referred to as “condition information”) to the uplink device 510. [0057] Next, operations of the communication system according to 25 the present example embodiment are described with reference to Fig.9 [0058] Steps S10, S20, S50, and S60 are the same as the steps in the first example embodiment.

17 [0059] At step S31, the second base station 210 transmits, to the gateway 310, the Path Switch Request message. Note that the present example embodiment is different from the first example 5 embodiment in that in the former, the Path Switch Request message does not need to include the condition information. [0060] At step S41, the gateway 310 transmits the location information on the terminal device 410 to the uplink device 510. 10 Note that the location information on the terminal device 410 ma y be included in the Location Report message. [0061] In the communication system according to the present example embodiment, the gateway 310 can transmit, to the uplink 15 device 510, the location information on the terminal device 410 without changing the Path Switch Request message that is transmitted from the second base station 210 to the gateway 310. [0062] Note that the gateway 300 or 310 according to each of the 20 above described example embodiments may have a configuration other than the configuration illustrated in Fig.3 or Fig.8. Fig.10 illustrates a configuration of a gateway 320 that is a variation of the gateway according to each of the above described example embodiments. 25 [0063] The gateway 320 at least includes a transmitting unit 34, a receiving unit 35, a determination unit 36 and a control unit 37. [0064] The transmitting unit 34 is the same as the transmitting unit

18 30 or the transmitting unit 32.

[0065] The receiving unit 35 is the same as the receiving unit 31 or the receiving unit 33. 5 [0066] The determination unit 36 determines whether to transmit, to the uplink device, the location information on the terminal device based on information received by the receiving unit 35. For example, when the Path Switch Request message received by the 10 receiving unit 35 includes the Request Type IE, and the Request Type IE indicates “Event=Change of serving cell,” the determination unit of the gateway according to the first example embodiment determines to transmit, to the uplink device, the terminal device ’s location information which is included in the Path Switch Request 15 message.

[0067] The control unit 37 controls components included in the gateway 320. [0068] 20 Each processing according to the above described example embodiments may be conducted by software. More specifically, a CPU of an information processing device may read and execute a computer program for conducting each processing. It is possible to conduct processing having the same content as that of the 25 processing of the above described example embodiments even when each processing is conducted using the program. Further, the above described program may be stored in a non -transitory medium such as an ROM (Read Only Memory), an RAM (Random Access Memory), a semiconductor storage such as a flash memory, an

19 optical disc, a magnetic disc, and a magnet optical disc.

[0069] The whole or part of the example embodiments disclosed above can be described as, but not limited to, the following 5 supplementary notes.

[0070] (supplementary note 1) A gateway in a communication system comprising a first base station, a second base station, the gateway connected with the first 10 base station and the second base station, and a n uplink device connected with the gateway, the gateway comprising: a receiving unit that receives a P ath Switch Request message from the second base station when a terminal device moves from a cell covered by the first base station to a cell covered by the second 15 base station; and a transmitting unit that transmits, to the uplink device, the terminal device’s location information that is included in the Path Switch Request message. (supplementary note 2) 20 The gateway according to supplementary note 1, wherein the gateway is an HeNB-GW. (supplementary note 3) The gateway according to supplementary note 1 or 2, wherein each of the first base station and the second base station is an HeNB. 25 [0071] This application is based upon and claims the benefit of priority from Japanese patent application No. 20 15-061848, filed on March 25, 2015, the disclosure of which is incorporated herein in its entirety by reference.[Reference signs List]

20 [0072] 1 MME 2 HeNB-GW 3 eNB 5 4, 5 HeNB 20, 31, 33, 35 Receiving unit 21, 30, 32, 34 Transmitting unit

36 Determination unit 37 Control unit 10 100, 110 First base station 200, 210 Second base station 300, 310, 320 Gateway 6, 400 UE 500, 510 Uplink device

21 WE CLAIM: 1. A base station connected with a gateway that is also connected with another base station, the base station comprising: a receiving unit that receive s a message from the gateway; 5 and a transmitting unit that transmits, to the gateway, a Path Switch Request message that includes a Request Type IE and at least either one of an ECGI and a TAI indicating a location of a terminal device when the terminal device is moved from a cell covered by the 10 another base station. 2. A base station connected with a gateway that is also connected with another base station, the base station comprising: a receiving unit that receive s a message from the gateway; 15 and a transmitting unit that transmits, to the gateway, first information on a location of a terminal device and second information on a change of a cell when the terminal device is moved from the cell covered by the another base station. 20 3. The base station according to claim 2, wherein the second information is information on a condition for the gateway to transmit the first information to a n uplink device that is connected with the gateway. 25 4. The base station according to claim 2 or 3, where in the second information is information that is included in a Request Type IE.

22 5. The base station according to any one of claims 2 to 4, wherein the first information is at least either one of an ECGI or a TAI. 5 6. The base station according to any one of claims 2 to 5, wherein the transmitting unit adds the second information to a Path Switch Request message, and transmits the Path Switch Request message to the gateway. 10 7. The base station according to any one of claims 2 to 6, wherein the gateway is an HeNB-GW. 8. The base station according to any one of claims 2 to 7, wherein the another base station is an HeNB . 15 9. A gateway that terminates a first base station and a second base station, the gateway comprising: a transmitting unit that transmit s a message to the second base station; and, 20 a receiving unit that receives, from the second base station, first information on a location of a terminal device and second information on a change of a cell when the terminal device moves from the cell covered b y the first base station to the cell covered by the second base station. 25 10. A gateway in a communication system comprising a first base station, a second base station, the gateway connected with the first base station and the second base station, and a n uplink device connected with the gateway, the gateway comprising:

23 a receiving unit that receives a Path Switch Request message from the second base station when a terminal device moves from a cell covered by the first base station to a cell covered by the second base station; and 5 a transmitting unit that transmits, to the uplink device, the terminal device’s location information that is included in the Path Switch Request message. Dated this 20th day of October 2017

Documents

Sign in to open
Application documents
1 201717037207-TRANSLATIOIN OF PRIOIRTY DOCUMENTS ETC. [20-10-2017(online)].pdf 20 Oct 2017
2 201717037207-STATEMENT OF UNDERTAKING (FORM 3) [20-10-2017(online)].pdf 20 Oct 2017
3 201717037207-REQUEST FOR EXAMINATION (FORM-18) [20-10-2017(online)].pdf 20 Oct 2017
4 201717037207-PRIORITY DOCUMENTS [20-10-2017(online)].pdf 20 Oct 2017
5 201717037207-POWER OF AUTHORITY [20-10-2017(online)].pdf 20 Oct 2017
6 201717037207-FORM 18 [20-10-2017(online)].pdf 20 Oct 2017
7 201717037207-FORM 1 [20-10-2017(online)].pdf 20 Oct 2017
8 201717037207-DRAWINGS [20-10-2017(online)].pdf 20 Oct 2017
9 201717037207-DECLARATION OF INVENTORSHIP (FORM 5) [20-10-2017(online)].pdf 20 Oct 2017
10 201717037207-COMPLETE SPECIFICATION [20-10-2017(online)].pdf 20 Oct 2017
11 201717037207.pdf 25 Oct 2017
12 201717037207-Power of Attorney-241017.pdf 30 Oct 2017
13 201717037207-OTHERS-241017.pdf 30 Oct 2017
14 201717037207-Correspondence-241017.pdf 30 Oct 2017
15 201717037207-OTHERS-241017..pdf 17 Nov 2017
16 201717037207-RELEVANT DOCUMENTS [29-11-2017(online)].pdf 29 Nov 2017
17 201717037207-MARKED COPIES OF AMENDEMENTS [29-11-2017(online)].pdf 29 Nov 2017
18 201717037207-AMMENDED DOCUMENTS [29-11-2017(online)].pdf 29 Nov 2017
19 201717037207-Amendment Of Application Before Grant - Form 13 [29-11-2017(online)].pdf 29 Nov 2017
20 201717037207-Proof of Right (MANDATORY) [01-01-2018(online)].pdf 01 Jan 2018
21 201717037207-OTHERS-050118.pdf 11 Jan 2018
22 201717037207-Correspondence-050118.pdf 11 Jan 2018
23 abstract.jpg 30 Jan 2018
24 201717037207-FORM 3 [19-04-2018(online)].pdf 19 Apr 2018
25 201717037207-FORM 3 [19-04-2018(online)]-1.pdf 19 Apr 2018
26 201717037207-FER.pdf 19 Mar 2020
27 201717037207-Information under section 8(2) [18-09-2020(online)].pdf 18 Sep 2020
28 201717037207-FORM-26 [18-09-2020(online)].pdf 18 Sep 2020
29 201717037207-FORM 3 [18-09-2020(online)].pdf 18 Sep 2020
30 201717037207-OTHERS [19-09-2020(online)].pdf 19 Sep 2020
31 201717037207-FER_SER_REPLY [19-09-2020(online)].pdf 19 Sep 2020
32 201717037207-DRAWING [19-09-2020(online)].pdf 19 Sep 2020
33 201717037207-COMPLETE SPECIFICATION [19-09-2020(online)].pdf 19 Sep 2020
34 201717037207-CLAIMS [19-09-2020(online)].pdf 19 Sep 2020
35 201717037207-ABSTRACT [19-09-2020(online)].pdf 19 Sep 2020
36 201717037207-Information under section 8(2) [30-09-2020(online)].pdf 30 Sep 2020
37 201717037207-PatentCertificate25-10-2023.pdf 25 Oct 2023
38 201717037207-IntimationOfGrant25-10-2023.pdf 25 Oct 2023
Search strategy
1SearchPattern201717037207E_13-03-2020.pdf

ERegister / renewals

Inforce
3rd Renewed 18 Jan 2024 Period 17 Mar 2018 – 17 Mar 2019 · CBR 4064 · Certificate 14042 ₹4,000
4th Renewed 18 Jan 2024 Period 17 Mar 2019 – 17 Mar 2020 · CBR 4064 · Certificate 14043 ₹4,000
5th Renewed 18 Jan 2024 Period 17 Mar 2020 – 17 Mar 2021 · CBR 4064 · Certificate 14044 ₹4,000
6th Renewed 18 Jan 2024 Period 17 Mar 2021 – 17 Mar 2022 · CBR 4064 · Certificate 14045 ₹4,000
7th Renewed 18 Jan 2024 Period 17 Mar 2022 – 17 Mar 2023 · CBR 4064 · Certificate 14046 ₹12,000
8th Renewed 18 Jan 2024 Period 17 Mar 2023 – 17 Mar 2024 · CBR 4064 · Certificate 14047 ₹12,000
9th Renewed 18 Jan 2024 Period 17 Mar 2024 – 17 Mar 2025 · CBR 4064 · Certificate 14048 ₹12,000
10th Renewed 12 Mar 2025 Period 17 Mar 2025 – 17 Mar 2026 · CBR 13007 · Certificate 20831 ₹12,000
11th Renewed 06 Mar 2026 Period 17 Mar 2026 – 17 Mar 2027 · CBR 13910 · Certificate 19919 ₹24,000