Abstract: In order to provide a communication system capable of charging control in accordance with a bearer used by a UE even when the UE 5 performs dual connectivity, a communication system according to the present disclosu re includes a communication terminal (11) configured to communicate with a communication device (12) and a communication device (13) by using a different radio bearer for each of the communication device (12) and the communication device (13), and a 1 0 contro l device (14) configured to determine whether to cause the communication device (12) to measure the traffic of each radio bearer.
1. A Mobility Management Entity (MME) comprising: means for receiving an Attach Request message from a communication terminal during Attach procedure, the Attach Request message including first information indicating that the communication terminal supports Dual Connectivity with a Master base station providing Evolved Universal Terrestrial Radio Access (E-UTRA) and a Secondary base station providing radio communication scheme in 5G; means for storing the first information; and means for determining whether or not to restrict use of the Dual Connectivity with the radio communication scheme in 5G for the communication terminal, based on the first information and second information indicating whether or not use of Dual Connectivity with the radio communication scheme in 5G is restricted.
2. The MME according to Claim 1 further comprising: means for transmitting an Attach Accept message to the communication terminal during the Attach procedure, the Attach Accept message including the second information.
3. The MME according to Claim 1 or 2, wherein the MME is configured to perform Secondary Node Addition procedure for providing radio resources from the Secondary base station to the communication terminal after the Attach procedure.
4. The MME according to any one of Claims 1 to 3 further comprising: means for selecting a Serving GW (SGW) during the Attach procedure if the MME has the first information and the second information indicating that the use of Dual Connectivity with the radio communication scheme in 5G is not restricted.
5. The MME according to any one of Claims 1 to 4, wherein the Dual Connectivity is E-UTRA-NR Dual Connectivity (EN-DC).
6. The MME according to any one of Claims 1 to 3, wherein the second information indicates whether or not the use of Dual Connectivity with the radio communication scheme in 5G is restricted by Evolved Packet System (EPS) network.
The present disclosure relates to a communication system, a control device, a communication terminal, a communication device and a communication method and, particularly, relates to a communication
10 system, a control device, a communication terminal, a communication
device and a communication method that perform communications using a plurality of radio bearers. Background Art [0002]
15 3GPP (3rd Generation Partnership Project), a standard
specification for mobile communication systems, introduces dual connectivity as a technique for a communication terminal UE (User Equipment) to carry out wideband and low-delay communications. The dual connectivity is a technique that allows a UE to have dual connections
20 to a first base station MeNB (Master evolved NodeB) and a second base station SeNB (Secondary eNB) that perform LTE (Long Term Evolution) communications, for example, so that the UE communicates not only with the MeNB but also with the SeNB. This improves the throughput of communications.
25 [0003]
Non Patent Literature 1 describes, as a dual connectivity procedure, a process flow or the like where a UE newly adds an SeNB as an eNB to communicate with the UE when the UE is being connected with an MeNB.
30 [0004]
On the other hand, areas where wireless LAN (Local Area Network) communications, which enable high-speed communications while the coverage area is smaller than mobile communication systems, are available have been expanded recently. Thus, a technique where a
3 UE connects to both of an eNB that performs mobile communications and
an access point AP that performs wireless LAN communications by
applying the dual connectivity technology, and the UE communicates not
only with the eNB but also with the AP has been also studied. To be
5 more specific, the background, objective and the like of this study are
described in Non Patent Literature 2.
[0005]
Note that a charging rate to be applied to a UE is determined on the basis of a radio access technology (RAT) being used by the UE. For 10 example, when a UE is performing LTE communications with an MeNB
and an SeNB in dual connectivity, a charging rate determined at the time of LTE communications is applied to the UE. Non Patent Literature 3 describes a PCC (Policy and Charging Control) architecture for carrying out policy control and charging control. 15 [0006]
Non Patent Literature 4 (TS23.401) describes that a gateway device PGW (Packet Date Network Gateway) manages RAT types on a UE-by-UE basis as parameters related to charging. The RAT type is a parameter indicating a RAT that is currently used by a UE. 20 Citation List
Non Patent Literature [0007]
NPL1: 3GPP TS 36.300 V13.3.0 (2016-03) Section 5.7, Section
10.1.2.8
25 NPL2: 3GPP TSG RAN Meeting #67 (2015-03) RP-150510
NPL3: 3GPP TS 23.203 V13.7.0 (2016-03) Section 5, Section A.4.2
NPL4: 3GPP TS 23.401 V13.6.1 (2016-03) Section 5.7.4
Summary of Invention
30 Technical Problem
[0008]
In the case of executing the dual connectivity described in Section 10.1.2.8 of Non Patent Literature 1, a UE performs communications by using one RAT which is common to the MeNB and the SeNB. In this
4 case, a PGW manages RAT types as charging parameters on a UE-by-UE
basis as described in Non Patent Literature 4. Thus, because the PGW
uses the common RAT for communications between the UE and the MeNB
and communications between the UE and the SeNB, it is not possible to
5 distinguish between them. This causes a problem that it is not possible
to apply different charging rates to communications between the UE and
the MeNB and communications between the UE and the SeNB. In an
example, as described in Section 5.7 of Non Patent Literature 1, there is a
case where dual connectivity (Licensed-Assisted Access (LAA)) is made
10 between communications using a spectrum licensed to a mobile operator and communications using a spectrum not licensed to a mobile operator. In such a case, different charging rates can be applied to those communications. However, when those communications are Dual Connectivity using the same RAT type, it is not possible to distinguish
15 between those communications, and it is thereby not possible to apply different charging rates to them. [0009]
Further, as described in Non Patent Literature 2, there is a case where when a UE executes dual connectivity, the UE communicates with
20 an eNB that performs mobile communications and an access point AP that performs wireless LAN communications. In this case, the UE performs communications using two types of RATs at the same time. Therefore, if a PGW manages RAT types on a UE-by-UE basis as described in Non Patent Literature 4, there is a possibility that a RAT type that is managed
25 by the PGW and a RAT that is actually used by the UE are different.
This causes a problem that, when a UE performs communications using two or more types of RATs, it is not possible to conduct adequate charging control (apply a charging rate) in accordance with actual communications.
30 [0010]
An exemplary object of the present disclosure is to provide a communication system, a control device, a communication terminal, a communication device and a communication method capable of performing various processing related to a radio bearer to be used for
5 communications by a communication terminal.
Solution to Problem
[0011]
A communication system according to a first exemplary aspect of 5 the present disclosure includes a communication terminal configured to communicate with a plurality of communication devices by using a different radio bearer for each of the plurality of communication devices, and a control device configured to determine whether to cause the communication device to measure traffic of each radio bearer.
10 [0012]
A control device according to a second exemplary aspect of the present disclosure includes a control unit configured to determine, when a communication terminal communicates with a plurality of communication devices by using a different radio bearer for each of the plurality of
15 communication devices, whether to cause at least one communication device of the plurality of communication devices to measure traffic of each radio bearer. [0013]
A communication terminal according to a third exemplary aspect
20 of the present disclosure includes a transmitting unit configured to
transmit, to a control device, support information indicating whether to be able to perform a plurality of communications by using a different radio bearer for each of a plurality of communication devices, a receiving unit configured to receive, from the control device, a determination result
25 of determining whether the communication terminal communicates with a plurality of communication devices by using a plurality of radio bearers based on the support information and communication permission information indicating whether the communication terminal is allowed to communicate with a plurality of communication devices by using a
30 plurality of radio bearers, and a control unit configured to perform
processing of setting up a plurality of radio bearers with a plurality of communication devices when the determination result contains information instructing to communicate with a plurality of communication devices by using a plurality of radio bearers.
6 [0014]
A communication method according to a fourth exemplary aspect of the present disclosure includes determining, when a communication terminal communicates with a plurality of communication devices by 5 using a different radio bearer for each of the plurality of communication devices, whether to cause at least one communication device of the plurality of communication devices to measure traffic of each radio bearer, and transmitting a determination result to the communication device. 10 Advantageous Effects of Invention [0015]
According to the present disclosure, it is possible to provide a communication system, a control device, a communication terminal, a communication device and a communication method capable of 15 performing various processing related to a radio bearer to be used for communications of a communication terminal. Brief Description of Drawings [0016]
Fig. 1 is a schematic diagram of a communication system 20 according to a first embodiment.
Fig. 2 is a schematic diagram of a communication system according to a second embodiment.
Fig. 3 is a schematic diagram of a UE according to the second
embodiment.
25 Fig. 4 is a schematic diagram of an MME according to the second
embodiment.
Fig. 5 is a schematic diagram of an MeNB according to the second embodiment.
Fig. 6 is a view showing protocol stacks in the MeNB and an SeNB 30 according to the second embodiment.
Fig. 7 is a view showing the flow of an SI setup process according to the second embodiment.
Fig. 8 is a view showing the flow of an X2 setup process according to the second embodiment.
7 Fig. 9 is a view showing the flow of an Attach process according
to the second embodiment.
Fig. 10 is a view showing the flow of the Attach process according
to the second embodiment.
5 Fig. 11 is a view showing Access Restriction Data according to the
second embodiment.
Fig. 12 is a view showing the flow of a process for the MeNB to
report the amount of packets counted for each radio bearer related to the
UE according to the second embodiment.
10 Fig. 13 is a view showing the flow of a multiple PDN connectivity
establishment process according to a third embodiment.
Fig. 14 is a view showing the flow of the multiple PDN connectivity establishment process according to the third embodiment.
Fig. 15 is a view showing an E-UTRAN initiated E-RAB 15 modification procedure according to a fourth embodiment.
Fig. 16 is a view showing an SI release procedure according to a fifth embodiment.
Fig. 17 is a view showing a PDN GW initiated bearer deactivation
procedure according to the fifth embodiment.
20 Fig. 18 is a view showing an MME initiated bearer deactivation
procedure according to the fifth embodiment.
Fig. 19 is a view showing an X2 HO procedure according to a sixth embodiment.
Fig. 20 is a view showing the X2 HO procedure according to the 25 sixth embodiment.
Fig. 21 is a view showing the X2 HO procedure according to the sixth embodiment.
Fig. 22 is a view showing the SI HO procedure according to the
sixth embodiment.
30 Fig. 23 is a view showing the SI HO procedure according to the
sixth embodiment.
Fig. 24 is a view showing the SI HO procedure according to the sixth embodiment.
Fig. 25 is a view showing the SI HO procedure according to the
8 sixth embodiment.
Fig. 26 is a view showing the SI HO procedure according to the sixth embodiment.
Fig. 27 is a schematic diagram of an MeNB according to each 5 embodiment.
Fig. 28 is a schematic diagram of a UE according to each embodiment.
Fig. 29 is a schematic diagram of an MME according to each embodiment. 10 Description of Embodiments [0017] First Embodiment
Embodiments of the present disclosure are described hereinafter with reference to the drawings. A configuration example of a 15 communication system according to a first embodiment of the present disclosure is described with reference to Fig. 1. The communication system in Fig. 1 includes a communication terminal 11, a communication device 12, a communication device 13, and a control device 14. The communication terminal 11, the communication device 12, the 20 communication device 13, and the control device 14 may be a computer device that operates by running, on a processor, a program stored in a memory. [0018]
The communication terminal 11 is configured to communicate with 25 a plurality of communication devices by using a different radio bearer for each of the plurality of communication devices. The communication terminal 11 may be a mobile phone terminal, a smartphone, a tablet terminal or the like. Further, the communication terminal 11 may be an M2M (Machine to Machine) terminal, an MTC (Machine Type 30 Communication) terminal or the like. The radio bearer is a data
communication path between, for example, the communication terminal 11 and the communication device 12 and between the communication terminal 11 and the communication device 13. The communication terminal 11 may set up a radio bearer between, for example, the
9 communication device 12 and the communication device 13 as shown in
Fig. 1. The dashed lines in Fig. 1 indicate radio bearers 121 and 131
that are set up between the communication terminal 11 and the
communication device 12 and between the communication terminal 11 and
5 the communication device 13, respectively.
[0019]
The communication device 12 and the communication device 13
may be, for example, base stations used in mobile communications.
Alternatively, the communication device 12 and the communication
10 device 13 may be AP (Access Point) or WT (Wireless LAN Termination) used in wireless LAN communications. Further, the communication device 12 may be a base station, and the communication device 13 may be AP or WT (hereinafter referred to as WT as a representative one ). [0020]
15 The communication terminal 11 may set up a plurality of radio
bearers by using one RAT. For example, the communication terminal 11 may set up a plurality of radio bearers by using LTE as RAT. Alternatively, the communication terminal 11 may set up a plurality of radio bearers by using a plurality of RATs. For example, the
20 communication terminal 11 may set up a plurality of radio bearers by
using LTE and RAT that is defined as so-called 3G in 3GPP. Further, for example, the communication terminal 11 may set up a plurality of radio bearers by using a wireless communication scheme defined in 3GPP and wireless LAN.
25 [0021]
The control device 14 is configured to determine whether or not to cause the communication device 12 to measure the traffic of each radio bearer. The control device 14 transmits an instruction signal that instructs measurement of the traffic of each radio bearer to, for example,
30 the communication device 12. When the communication terminal 11 communicates with two or more communication devices, the control device 14 may transmit the instruction signal to the two or more communication devices which the communication terminal 11 communicates with. Alternatively, the control device 14 may transmit
10 the instruction signal to the communication device 12, which serves as a
representative of the two or more communication devices. The
representative communication device 12 measures the traffic of the radio
bearer 121 between the communication terminal 11 and the
5 communication device 12, and may itself further measure the traffic of
the radio bearer 131 between the communication terminal 11 and the
communication device 13 or acquire it from the other communication
device 13. To be specific, when the communications between the
communication terminal 11 and the other communication device 13 are
10 aggregated at the communication device 12 (in the case of aggregation), the communication device 12 measures, in addition to measuring the traffic of the radio bearer 121, the traffic of the radio bearer 131. Note that, even in this case, the communication device 12 may acquire the traffic of the radio bearer 131 measured in the communication device 13
15 from the communication device 13. On the other hand, when the communications between the communication terminal 11 and the communication device 13 are not aggregated at the communication device 12, the communication device 12 acquires the traffic of the radio bearer 131 measured in the communication device 13 from the communication
20 device 13. [0022]
As described above, in the communication system of Fig. 1, the control device 14 determines whether or not to cause the communication device 12 to measure the traffic of each radio bearer. Further, the
25 communication device 12 measures or acquires the traffic of each radio bearer according to a result of a determination in the control device 14. Therefore, when a telecommunications carrier carries out charging in accordance with the traffic of, for example, the communication terminal 11, it is possible to carry out charging in accordance with the traffic of
30 each radio bearer. [0023]
For example, the communication device 12 measures the traffic of each radio bearer, and a telecommunications carrier can thereby set a different packet unit price for each radio bearer and carry out charging
11 for each radio bearer.
[0024]
Second Embodiment
A configuration example of a communication system according to
5 a second embodiment of the present disclosure is described with reference
to Fig. 2. The communication system in Fig.2 indicates a
communication system defined in 3GPP. The communication system in
Fig. 2 includes a UE 20, an MeNB 21, an SeNB 22, an MME (Mobility
Management Entity) 23, an HSS (Home Subscriber Server) 24, an SGW
10 (Serving Gateway) 25, a PGW 26, a PCRF (Policy and Charging Rule
Function) entity 27 (which is referred to hereinafter as PCRF 27), an AF (Application Function) entity 28, (which is referred to hereinafter as AF 28), an OFCS (Offline Charging System) 29, and an OCS (Online Charging System) 30.
15 [0025]
The UE 20 corresponds to the communication terminal 11 in Fig. 1. The UE 20 is used as a general term for communication terminals in 3GPP. The MeNB 21 corresponds to the communication device 12 in Fig. 1. The SeNB 22 corresponds to the communication device 13 in Fig. 1.
20 The MeNB 21 and the SeNB 22 are base stations that are used when the UE 20 performs dual connectivity. The MME 23 corresponds to the control device 14 in Fig. 1. The MME 23 is a device that mainly makes mobility management of the UE 20, bearer setup request, bearer setup instruction, bearer deletion request or bearer deletion instruction.
25 [0026]
The SGW 25 is a device that is connected to a radio access system and transfers user data between the radio access system and the PGW 26. The PGW 26 makes a connection to an external network (PDN:Packet Data Network etc.). The PCRF 27 determines policies (charging system)
30 regarding QoS control, charging control or the like in the MeNB 21, the SeNB 22 and the PGW 26. [0027]
The AF 28 is a device that provides applications, and performs control related to application services to be provided to the UE 20. The
12 OCS 30 and the OFCS 29 perform charging control or the like in
accordance with a charging contract of the UE 20. For example, in the
case of a charging contract such as a prepaid service, the OCS 30 having
the ability to monitor the traffic at all times performs charging
5 processing. On the other hand, in the case of a monthly charging
contract or the like, the OFCS 2 performs charging processing.
[0028]
A configuration example of the UE 20 according to the second
embodiment of the present disclosure is described with reference to Fig.
10 3. The UE 20 includes a transmitting and receiving unit 41, a
transmitting and receiving unit 42, and a controller 43. The components of the UE 20, such as the transmitting and receiving unit 41, the transmitting and receiving unit 42 and the controller 43, may be a module or software whose processing is executed by running, on a processor, a
15 program stored in a memory. Alternatively, the components of the UE 20 may be hardware such as a chip or a circuit. The transmitting and receiving unit 41 and the transmitting and receiving unit 42 may be a transmitter and a receiver. [0029]
20 The transmitting and receiving unit 41 communicates with the
MeNB 21. The transmitting and receiving unit 41 may perform radio communications with the MeNB 21 by using LTE specified as a radio communication scheme in 3GPP, for example. The transmitting and receiving unit 42 communicates with the SeNB 22. The transmitting and
25 receiving unit 42 may also perform radio communications with the SeNB 22 by using LTE. Further, the transmitting and receiving unit 42 may communicate with a different communication device from the SeNB 22 by using a different radio communication scheme from LTE. For example, the transmitting and receiving unit 42 may communicate with a WT by
30 using wireless LAN communications. In this case, the WT is a
communication device that can communicate with the MeNB 21. In other words, the transmitting and receiving unit 42 communicates with the MeNB 21 through the SeNB 22 or the WT. [0030]
13 The controller 43 performs control to allocate transmission data to
the transmitting and receiving unit 41 and the transmitting and receiving
unit 42 when using dual connectivity. The controller 43 may further
perform modulation of transmission data or the like. Further, the
5 controller 43 may perform decoding of received data output from the
transmitting and receiving unit 41 and the transmitting and receiving unit
42.
[0031]
A configuration example of the MME 23 according to the second
10 embodiment of the present disclosure is described with reference to Fig. 4. The MME 23 includes a base station communication unit 51, an SGW communication unit 52, an HSS communication unit 53, and a controller 54. The components of the MME 23 may be a module or software whose processing is executed by running, on a processor, a program stored in a
15 memory. Alternatively, the components of the MME 23 may be hardware such as a chip or a circuit. Note that the communication unit may be a transmitter and a receiver. [0032]
The base station communication unit 51 transmits and receives a
20 control signal to and from the MeNB 21. A reference point between the base station communication unit 51 and the MeNB 21 is defined as Sl-MME. Further, the base station communication unit 51 transmits and receives an NAS (Non Access Stratum) message with the UE 20 through the MeNB 21. The NAS message is transmitted between the base station
25 communication unit 51 and the UE 20 through the MeNB 21. [0033]
The SGW communication unit 52 transmits and receives a control signal to and from the SGW 25. A reference point between the SGW communication unit 52 and the SGW 25 is defined as S 1 1. The SGW
30 communication unit 52 receives information about charging or the like transmitted from the PGW 26 through the SGW 25. [0034]
The HSS communication unit 53 transmits and receives a control signal to and from the HSS 24. A reference point between the HSS
14 communication unit 53 and the HSS 24 is defined as S6a. The HSS
communication unit 53 receives subscriber information regarding the UE
20 from the HSS 24. The subscriber information contains information as
to whether or not to allow the UE 20 to perform or configure dual
5 connectivity, for example.
[0035]
The controller 54 determines whether or not to cause the MeNB 21
to perform dual connectivity by using the information transmitted from
the MeNB 21 and the HSS 24. Further, when it is determined to cause
10 the MeNB 21 to perform dual connectivity, the controller 54 determines whether or not to cause the MeNB 21 to measure the traffic of each radio bearer. The controller 54 transmits an instruction message indicating a determination result to the MeNB 21 through the base station communication unit 51. The instruction message may be a message that
15 instructs the MeNB 21 to perform dual connectivity, for example.
Further, the instruction message may be a message that instructs the MeNB 21 to measure the traffic of each radio bearer when performing dual connectivity. Furthermore, the controller 54 may transmit an instruction message to the PGW 26 through the SGW communication unit
20 52 and the SGW 25. By this instruction message, the PGW 26 is
informed that dual connectivity is to be performed, and the traffic of each radio bearer is to be measured or acquired by the MeNB 21, and charging information regarding the traffic is to be received. The PGW 26 can thereby recognize that it does not need to measure the traffic after that.
25 Further, the PGW 26 can make preparations for charging processing based on the received charging information. [0036]
A configuration example of the MeNB 21 according to the second embodiment of the present disclosure is described with reference to Fig.
30 5. The MeNB 21 includes a UE communication unit 61, a base station communication unit 62, a C-Plane communication unit 63, a U-Plane communication unit 64, a controller 65, and a data measurement unit 66. The components of the MeNB 21, such as the UE communication unit 61, the base station communication unit 62, the C-Plane communication unit
15 63, the U-Plane communication unit 64, the controller 65 and the data
measurement unit 66 may be a module or software whose processing is
executed by running, on a processor, a program stored in a memory.
Alternatively, the components of the MeNB 21 may be hardware such as a
5 chip or a circuit. Note that the communication unit may be a transmitter
and a receiver.
[0037]
The UE communication unit 61 transmits and receives data to and
from the UE 20. A reference point between the UE communication unit
10 61 and the UE 20 is defined as LTE-Uu. The base station communication unit 62 transmits and receives data to and from the SeNB 22. A reference point between the base station communication unit 62 and the SeNB 22 is defined as X2. [0038]
15 The C-Plane communication unit 63 transmits and receives
C(Control)-Plane data to and from the MME 23. The C-Plane data may be referred to also as a control signal. The U-Plane communication unit 64 transmits and receives U(User)-Plane data to and from the SGW 25. The U-Plane data may be referred to also as user data.
20 [0039]
The controller 65 transmits information regarding dual connectivity to the MME 23 through the C-Plane communication unit 63. The information regarding dual connectivity may be information indicating whether or not the MeNB 21 can perform dual connectivity, for
25 example. Further, the information regarding dual connectivity may be information about the SeNB that performs dual connectivity with the MeNB 21. [0040]
Further, when an instruction to perform dual connectivity is given
30 from the MME 23, the controller 65 performs control to add the SeNB 22 through the base station communication unit 62. Furthermore, when an instruction to measure the traffic of each radio bearer is given from the MME 23, the controller 65 outputs a message to instruct measurement of the traffic of each radio bearer to the data measurement unit 66. The
16 controller 65 further transmits a measurement result in the data
measurement unit 66 to the MME 23 through the C-Plane communication
unit 63.
[0041]
5 When an instruction to measure the traffic of each radio bearer is
given, the data measurement unit 66 measures the traffic between the UE
20 and the MeNB 21. When a plurality of radio bearers are set up with
the UE 20, the data measurement unit 66 measures the traffic for each of
the radio bearers. Further, the data measurement unit 66 acquires
10 information about the traffic of each radio bearer between the UE 20 and the SeNB 22 from the SeNB 22 through the base station communication unit 62. [0042]
Protocol stacks in the MeNB 21 and the SeNB 22 are described
15 hereinafter with reference to Fig. 6. The MeNB 21 and the SeNB 22 are composed of a MAC (Medium Access Control) layer, an RLC (Radio Link Control) layer, and a PDCP (Packet Data Convergence Protocol) layer. A radio bearer is set up between the PDCP layer of the UE 20 and the PDCP layer of the MeNB 21 or the SeNB 22.
20 [0043]
The configuration of dual connectivity that is implemented in the MeNB 21 and the SeNB 22 is described hereinafter. There are two configurations for dual connectivity that is performed in the MeNB 21 and the SeNB 22: a configuration using an MCG (Master Cell Group)
25 bearer and an SCG (Secondary Cell Group) bearer, and a configuration using a split bearer. [0044]
The MCG bearer is a communication bearer that is set up between the MeNB 21 and the SGW 25. The MCG bearer corresponds one-to-one
30 to a radio bearer that is set up between the UE 20 and the MeNB 21. The SCG bearer is a communication bearer that is set up between the SeNB 22 and the SGW 25 or between the SeNB 22 and another SGW. Another SGW is a different SGW from the SGW 25. When implementing dual connectivity by using the MCG bearer and the SCG bearer, the SCG bearer
17 corresponds one-to-one to a radio bearer that is set up between the UE 20
and the SeNB 22.
[0045]
The split bearer is a communication bearer that is set up between
5 the MeNB 21 and the SGW 25. The split bearer is associated with a
radio bearer that is set up directly between the UE 20 and the MeNB 21.
Further, the split bearer is associated with a radio bearer that is set up
between the UE 20 and the MeNB 21 through the SeNB 22. In other
words, the MeNB 21 transmits data transmitted through a radio bearer
10 that is directly set up between the UE 20 and the MeNB 21 and data
transmitted through a radio bearer that is set up between the UE 20 and the MeNB 21 through the SeNB 22 to the SGW 25 through the split bearer. The MeNB 21 receives data transmitted from the UE 20 to the SeNB 22 through the X2, which is a reference point between the MeNB 21 and the
15 SeNB 22. The communications using the split bearer may be referred to as aggregation communications. [0046]
The flow of an SI setup process between the MeNB 21 and the MME 23 is described hereinafter with reference to Fig. 7. First, the
20 MeNB 21 is activated (Sll). The MeNB 2 1 is activated by turning on the power, for example. [0047]
Next, the MeNB 21 transmits an SI Setup Request message to the MME 23 (S12). The SI Setup Request message contains DC Support, DC
25 combination and DC Traffic Count Support Indication as parameters. [0048]
The DC Support is information indicating whether or not the MeNB 21 is able to configure dual connectivity. The DC combination is information indicating which device or which RAT the MeNB 21
30 configures dual connectivity with. For example, the MeNB 21 may
configure dual connectivity with the SeNB 22. Alternatively, the MeNB 21 may configure dual connectivity with the WT that performs wireless LAN communications. Alternatively, the MeNB 21 may configure dual connectivity with a base station that performs communications using a
18 radio communication scheme defined as 3G in 3GPP. Alternatively, the
MeNB 21 may configure dual connectivity with a base station that
performs communications using a radio communication scheme possibly
defined as 5G in 3GPP in the future. The radio communication scheme
5 defined as 5G may be a scheme that achieves high-speed communications
using a wider bandwidth than LTE and shorter communication delay than
LTE and the like.
[0049]
The DC Traffic Count Support Indication is information indicating
10 whether or not the MeNB 21 supports the function of measuring the traffic of each radio bearer. The traffic may be the amount of packets (which includes the number of packets, the data volume etc.; which are hereinafter referred to as the amount of packets as a representative). To measure the traffic of each radio bearer means, when the MeNB 21
15 configures dual connectivity by using the split bearer, to measure the data traffic transmitted and received directly between the MeNB 21 and the UE 20 and the data traffic transmitted and received between the MeNB 21 and the UE 20 through the SeNB 22 separately from each other. On the other hand, when the MeNB 21 configures dual connectivity by using the MCG
20 bearer and the SCG bearer, to measure the traffic of each radio bearer means to measure the data traffic transmitted and received between the MeNB 21 and the UE 20 and the data traffic transmitted and received between the SeNB 22 and the UE 20 separately from each other. [0050]
25 Then, the MME 23 transmits an SI Setup Response message to the
MeNB 21 (S13). The SI Setup Response message contains DC Traffic Count Support Indication as a parameter. The DC Traffic Count Support Indication contained in the SI Setup Response message is information indicating whether or not the MME 23 can deal with counting the amount
30 of packets for each radio bearer in the MeNB 21. For example, the DC Traffic Count Support Indication may be information indicating whether or not the MME 23 can transmit information about the amount of packets for each radio bearer received from the MeNB 21 as charging information to the PGW 26 through the SGW 25.
19 [0051]
By performing the processing in Steps S12 and S13, the MeNB 21
and the MME 23 can exchange information about dual connectivity. In
other words, by performing the processing in Steps S12 and S13, the 5 MeNB 21 and the MME 23 can negotiate information about dual
connectivity.
[0052]
The flow of an X2 setup process between the MeNB 21 and the
SeNB 22 is described hereinafter with reference to Fig. 8. The X2 setup 10 process is a process performed after the MeNB 21 is activated. First, the
MeNB 21 transmits an X2 Setup Request message to the SeNB 22 (S21).
The X2 Setup Request message contains the same parameters as those
contained in the SI Setup Request message in Fig. 7.
[0053]
15 Next, the SeNB 22 transmits an X2 Setup Response message to the
MeNB 21 (S22). The X2 Setup Response message contains DC Support,
DC combination, and DC Traffic Count Support Indication as parameters.
The DC Traffic Count Support Indication contained in the X2 Setup
Response message is information indicating whether the SeNB 22 20 supports the function of counting the amount of packets for each radio
bearer.
[0054]
For example, the case where the MeNB 21 and the SeNB 22
configure dual connectivity and further the SeNB 22 supports the function 25 of counting the amount of packets for each radio bearer is described
below. In this case, the SeNB 22 transmits the amount of packets
transmitted and received through the radio bearer associated with the
SCG bearer to the MeNB 21.
[0055]
30 By performing the processing in Steps S21 and S22, the MeNB 21
and the SeNB 22 can exchange information about dual connectivity. In
other words, by performing the processing in Steps S21 and S22, the
MeNB 21 and the SeNB 22 can negotiate information about dual
connectivity.
20 [0056]
Further, although an example in which the MeNB 21 transmits the X2 Setup Request message to the SeNB 22 is described in Fig. 8, the SeNB 22 may transmit the X2 Setup Request message to the MeNB 21. 5 [0057]
The flow of an Attach process related to the UE 20 is described hereinafter with reference to Figs. 9 and 10. The Attach process is a process performed for the UE 20 to transmit and receive data through a core network. 10 [0058]
First, the UE 20 transmits an Attach request message to the MME
23 through the MeNB 21 (S31). The Attach request message contains DC
Support and DC combination as parameters. The DC Support contained
in the Attach request message is information indicating whether or not the
15 UE 20 is able to configure dual connectivity. Thus, the DC Support contained in the Attach request message is information indicating whether or not the UE 20 can perform communications using a plurality of radio bearers at the same time. Further, the DC combination contained in the Attach request message is information indicating a combination of
20 RATs which the UE 20 uses to configure dual connectivity. The UE 20 may configure dual connectivity by combining the same RATs or may configure dual connectivity by combining different RATs. [0059]
Then, the MME 23 transmits an Update Location request message
25 to the HSS 24 (S32). The HS S 24 then transmits an Update Location Ack message to the MME 23 (S33). The Update Location Ack message contains Access Restriction Data and DC not allowed as parameters. The Access Restriction Data and DC not allowd are managed in the HSS
24 as subscriber information of the UE 20.
30 [0060]
The DC Not Allowed is information indicating whether the UE 20 is allowed to configure dual connectivity. For example, the DC Not Allowed information may be used as flag information. To be specific, when "1" is set to the DC Not Allowed, it indicates that the UE 20 is
21 allowed to configure dual connectivity, and when "0" is set to the DC Not
Allowed, it indicates that the UE 20 is not allowed to configure dual
connectivity.
[0061]
5 The Access Restriction Data is information indicating RAT which
the UE 20 cannot use. The Access Restriction Data is described
hereinafter with reference to Fig. 11. Fig. 11 shows that a bit position
that is set to the Access Restriction Data and a RAT whose usage is
restricted are associated with each other. For example, when 1 is set to
10 the 0th bit of the Access Restriction Data, the UE cannot use UTRAN. Further, when 1 is set to the 7th bit of the Access Restriction Data, the UE cannot use the radio communication scheme defined as 5G. [0062]
Referring back to Fig. 9, the MME 23 then determines whether or
15 not to cause the MeNB 21 to count the amount of packets for each radio bearer based on DC Support transmitted from the MeNB 21 and the UE 20 and DC Traffic Count Support Indication transmitted from the MeNB 21 (S34). For example, when the MeNB 21 and the UE 20 are able to configure dual connectivity and the MeNB 21 supports the function of
20 counting the amount of packets for each radio bearer, the MME 23
determines to cause the MeNB 21 to count the amount of packets for each radio bearer. For example, when any one of the MeNB 21 and the UE 20 is not able to configure dual connectivity or when the MeNB 21 does not support the function of counting the amount of packets for each radio
25 bearer, the MME 23 determines not to cause the MeNB 21 to count the amount of packets for each radio bearer. [0063]
Further, in Step S34, when the DC Not Allowed transmitted from the HSS 24 indicates that the UE 20 is not allowed to configure dual
30 connectivity, the MME 23 may determine not to cause the MeNB 21 to
count the amount of packets for each radio bearer. Further, in Step S34, when the Access Restriction Data transmitted from the HSS 24 indicates that usage of the RAT indicated by the DC combination transmitted from the UE 20 and the MeNB 21 is restricted, the MME 23 may determine not
22 to cause the MeNB 21 to count the amount of packets for each radio
bearer.
[0064]
Then, the MME 23 transmits a Create Session Request message to
5 the SGW 25 (S35). The MME 23 sets DC Traffic Count Support
Indication indicating a determination result in Step S34 to the Create
Session Request message. Alternatively, when the MME 23 determines
not to cause the MeNB 21 to count the amount of packets for each radio
bearer in Step S34, the MME 23 may refrain from setting DC Traffic
10 Count Support Indication to the Create Session Request message. [0065]
Then, the SGW 25 transmits the Create Session Request message received in Step S35 to the PGW 26 (S36). The PGW 26 then performs QoS negotiation regarding the communication quality of the UE 20 with
15 the PCRF 27 (S37). [0066]
Then, the PGW 26 transmits a Create Session Response message to the SGW 25 (S38). The Create Session Response message contains DC Traffic Count Support Indication, Count Rule, and DC Not Allowed as
20 parameters. The DC Traffic Count Support Indication contained in the Create Session Response message is information indicating whether or not the PGW 26 can output information about the amount of packets for each radio bearer transmitted from the MeNB 21 as charging information to the OFCS 29 and the OCS 30.
25 [0067]
The DC Not Allowed contained in the Create Session Response message is information indicating whether or not to allow the UE 20 to configure dual connectivity. For example, the PGW 26 may set whether or not to allow the UE 20 to configure dual connectivity in accordance
30 with APN (Access Point Name) to which the UE 20 connects. In other words, whether or not to allow configuration of dual connectivity may be predetermined for each APN to which the UE 20 connects. The Count Rule contained in the Create Session Response message is information indicating detailed conditions when the MeNB 21 counts the amount of
23 packets for each radio bearer. For example, the Count Rule may contain
at least one of RAT type of the RAT to be counted, Traffic type of the
traffic to be counted, and Report period indicating the period of counting.
[0068]
5 The case where LTE is designated as the RAT type, for example, is
described hereinafter. In this case, when configuring dual connectivity
by using LTE and wireless LAN communications, the MeNB 21 counts
only the number of packets transmitted and received in LTE. On the
other hand, when configuring dual connectivity with the SeNB 22 that
10 performs LTE communications, the MeNB 21 counts the total amount of packets transmitted and received for each radio bearer. [0069]
The Traffic type indicates counting downlink user data only, counting uplink user data only, counting both of downlink user data and
15 uplink user data or the like. For the Report period, a time interval such as hourly may be designated, or the start time and end time of counting the amount of packets may be indicated, for example. [0070]
After that, the SGW 25 transmits the Create Session Response
20 message received in Step S38 to the MME 23 (S39). The MME 23
determines whether or not to activate dual connectivity, that is, whether or not to configure dual connectivity, in the UE 20, the MeNB 21 and the SeNB 22 by using the Access Restriction Data and the DC Not Allowed transmitted from the HSS 24 and the DC Not Allowed received from the
25 PGW 26 (S40). For example, when any one of the Access Restriction Data and the DC Not Allowed transmitted from the HSS 24 and the DC Not Allowed transmitted from the PGW 26 indicates not to allow the UE 20 to configure dual connectivity, the MME 23 may determine to inactivate dual connectivity in the UE 20, the MeNB 21 and the SeNB 22.
30 [0071]
Referring to Fig. 10, the MME 23 transmits an Initial Context Setup message containing an ATTACH Accept message to the MeNB 21 (S41). The ATTACH Accept message is transmitted to the UE 20 through the MeNB 21.
24 [0072]
The ATTACH Accept message contains DC Not Allowed as a
parameter. The DC Not Allowed contained in the ATTACH Accept
message is information indicating whether or not to allow the UE 20 to
5 configure dual connectivity. The Initial Context Setup message contains
DC Traffic Count Support Indication, Count Rule and DC Not Allowed as
parameters, in addition to the ATTACH Accept message. The DC Not
Allowed contained in the Initial Context Setup message is information
indicating whether or not to allow the MeNB 21 to configure dual
10 connectivity. When the DC Not Allowed indicates to allow the MeNB 21 to configure dual connectivity, the MME 23 instructs the MeNB 21 whether or not to count the amount of packets for each radio bearer by DC Traffic Count Support Indication. [0073]
15 When it is indicated to allow configuration of dual connectivity
and instructed to count the amount of packets for each radio bearer by the Initial Context Setup message received in Step S41, the MeNB 21 starts counting the amount of packets in accordance with the Count Rule (S42). Further, the MeNB 21 may receive the amount of packets counted in the
20 SeNB 22 from the SeNB 22. [0074]
Then, the MeNB 21 transmits an RRC Connection Reconfiguration message containing an ATTACH Accept message to the UE 20 (S43). The ATTACH Accept message contained in the RRC Connection
25 Reconfiguration message is the same as the ATTACH Accept message contained in the Initial Context Setup message. The RRC Connection Reconfiguration message contains DC Not Allowed as a parameter, in addition to the ATTACH Accept message. [0075]
30 After that, the UE 20 transmits an RRC Connection
Reconfiguration Complete message to the MeNB 21 (S44). The MeNB 21 then transmits an Initial Context Setup Response message to the MME 23 (S45). The Initial Context Setup Response message contains DC Charging Activated as a parameter. The DC Charging Activated is used
25 to notify that the operation of counting the amount of packets for each
radio bearer is started in the MeNB 21.
[0076]
The MME 23 then transmits a Modify Bearer Request message to
5 the SGW 25 (S46). The Modify Bearer Request message contains the DC
Charging Activated acquired in Step S45. Then, the SGW 25 transmits
the Modify Bearer Request message to the PGW 26 (S47). The Modify
Bearer Request message contains the DC Charging Activated acquired in
Step S46.
10 [0077]
Before acquiring the DC Charging Activated, the PGW 26 counts the amount of packets transmitted and received for each UE. After acquiring the DC Charging Activated, the PGW 26 may stop counting the amount of packets transmitted and received for each UE in order to
15 recognize that the amount of packets for each radio bearer is counted in the MeNB 21. Alternatively, the PGW 26 may continue to count the amount of packets transmitted and received for each UE even after acquiring the DC Charging Activated. [0078]
20 After that, the PGW 26 transmits a Modify Bearer Response
message to the SGW 25 (S48). The SGW 25 then transmits a Modify
Bearer Response message to the MME 23 (S49).
[0079]
The flow of a process where the MeNB 21 reports the amount of
25 packets counted for each radio bearer related to the UE 20 is described hereinafter with reference to Fig. 12. First, the MeNB 21 transmits a Traffic Count Report Request message to the SeNB 22 in order to acquire information about the amount of packets counted in the SeNB 22 in accordance with the Count Rule (S51). For example, the MeNB 21 may
30 transmit the Traffic Count Report Request message to the SeNB 22 when the count period specified in the Count Rule expires. Alternatively, the MeNB 21 may transmit the Traffic Count Report Request message to the SeNB 22 at arbitrary timing. [0080]
26 Then, the SeNB 22 transmits a Traffic Count Report message to
the MeNB 21 (S52). The Traffic Count Report message contains Traffic
Data as a parameter. The Traffic Data is information about the amount
of packets counted for each radio bearer in the SeNB 22. To be specific,
5 the Traffic Data may contain RAT type indicating the counted RAT,
Measured Traffic indicating the counted amount of packets, and Measured
Period indicating the counted period.
[0081]
The Measured Traffic may indicate the amount of packets in
10 downlink user data and the amount of packets in uplink user data
separately from each other. Further, the Measured Period may indicate the time when counting is started and the time when counting is ended, for example. [0082]
15 Then, the MeNB 21 transmits an E-RAB Modification Indication
message to the MME 23 (S53). The E-RAB Modification Indication message contains Traffic Data acquired by the MeNB 21 from the SeNB 22, and Traffic Data which is information about the amount of packets counted in the MeNB 21.
20 [0083]
The MME 23 then transmits a Modify Bearer Request message to the SGW 25 (S54). The Modify Bearer Request message contains the same Traffic Data as the Traffic Data contained in the E-RAB Modification Indication. The SGW 25 then transmits a Modify Bearer
25 Request message to the PGW 26 (S55). The Traffic Data contained in
the Modify Bearer Request message in Step S55 is the same as the Traffic Data contained in the Modify Bearer Request message in Step S54. [0084]
Then, the PGW 26 transmits a Modify Bearer Response message to
30 the SGW 25 (S56). The SGW 25 then transmits a Modify Bearer
Response message to the MME 23 (S57). The MME 23 then transmits an
E-RAB Modification Confirm message to the MeNB 21 (S58).
[0085]
The PGW 26 receives information about the amount of packets
27 counted for each radio bearer in the MeNB 21 and the SeNB 22 that
configure dual connectivity in Step S55. The PGW 26 thereby generates
a counting ticket (CDR) in accordance with the amount of packets counted
for each radio bearer and transmits the generated counting ticket to the
5 OFCS 29 or the OCS 30. The OFCS 29 or the OCS 30 may calculate the
charge by multiplying the amount of packets counted for each radio
bearer by the charging rate set for each radio bearer, for example. For
example, the rate may be set higher for the RAT using LTE or mobile
communications such as 5G than for the RAT using wireless LAN
10 communications. [0086]
Fig. 12 shows a process where the MeNB 21 transmits a Traffic Count Report Request message to the SeNB 22 in order to request transmission of Traffic Data in Step S51. On the other hand, the SeNB
15 22 may autonomously transmit a Traffic Count Report message to the
MeNB 21 in accordance with the Count Rule without receiving a Traffic Count Report Request message. For example, the SeNB 22 may transmit a Traffic Count Report message to the MeNB 21 at the timing when the Report period indicated by the Count Rule expires.
20 [0087]
Further, a message used for transmitting Traffic Data is not limited to the message shown in Fig. 12. The messages after Step S53 shown in Fig. 12 are the messages defined in 3GPP. For example, a new message that is not currently defined in 3GPP may be used as a message
25 after Step S53. For example, a new message of a Traffic Report
Indication message may be used instead of the E-RAB Modification Indication message. Further, a new message of a Traffic Report Confirm Message may be used instead of the E-RAB Modification Confirm message. Furthermore, a new message of a Traffic Report Request
30 message may be used instead of the Modify Bearer Request message. A new message of a Traffic Report Response message may be used instead of the Modify Bearer Response message. [0088]
As described above, by using the communication system according
28 to the second embodiment of the present disclosure, the MeNB 21 can
count the amount of packets transmitted and received for each radio
bearer. Further, the PGW 26 can generate charging information by using
information about the amount of packets counted in the MeNB 21. The 5 PGW 26 can thereby carry out charging for each radio bearer even when
dual connectivity is formed in the MeNB 21 and the SeNB 22.
[0089]
Further, the HSS 24 holds, as subscriber information of the UE 20,
information about whether or not to allow configuration of dual 10 connectivity and information about RAT whose usage is restricted in dual
connectivity. This prevents the UE 20 from configuring dual
connectivity by using the RAT not allowed by the subscriber information.
For example, the case where the UE 20 has an inexpensive contract where
the available RAT is restricted to 2G and 3G is described. In such a 15 case, it is possible to prevent the UE 20 from using the RAT such as 5G,
which is available by making an expensive contract, when configuring
dual connectivity.
[0090]
Third Embodiment
20 The flow of a multiple PDN connectivity establishment process
according to a third embodiment of the present disclosure is described
with reference to Figs. 13 and 14. Figs. 13 and 14 show the flow of a
process when the UE 20 connects to a plurality of PDNs. It is assumed
that, before the process of Fig. 13 is performed, the process of Figs. 9 and 25 10 has been performed and the UE 20 has established PDN connectivity
with the PGW 26.
[0091]
First, the UE 20 transmits a PDN Connectivity Request message to
the MME 23 through the MeNB 21 (S61). The PDN Connectivity 30 Request message contains APN, which is information that identifies PDN
which the UE 20 connects to.
[0092]
Next, the MME 23 determines whether or not to cause the MeNB
21 to count the amount of packets for each radio bearer regarding data
29 through newly established PDN connectivity by using the information
acquired in the SI Setup process in Fig. 7, the X2 Setup process in Fig. 8,
and the Attach process in Fig. 10 (S62). The information acquired in the
Attach process contains Access Restriction Data related to the UE 20 and
5 DC Not Allowed related to the UE 20 acquired from the HSS 24, for
example. Further, the information acquired in the SI Setup process, the
X2 Setup process and the Attach process contains DC Support transmitted
from the MeNB 21 and the UE 20 and DC Traffic Count Support
Indication transmitted from the MeNB 21.
10 [0093]
Step S63 in Fig. 13 to Step S68 in Fig. 14 are the same as Steps S35 to S40 in Fig. 9 and the detailed description thereof is omitted. Note that, however, the SGW 25 transmits and receives a Create Session Request message and a Create Session Response message with a PGW
15 261, which is different from the PGW 26, in Figs. 13 and 14. [0094]
Next, the MME 23 transmits a Bearer Setup Request message containing a PDN Connectivity Accept message to the MeNB 21 (S69). The PDN Connectivity Accept message is transmitted to the UE 20
20 through the MeNB 21. [0095]
The PDN Connectivity Accept message contains DC Not Allowed as a parameter. The DC Not Allowed contained in the PDN Connectivity Accept message is information indicating whether or not to allow the UE
25 20 to configure dual connectivity. The Bearer Setup Request message contains DC Traffic Count Support Indication, Count Rule and DC Not Allowed as parameters, in addition to the PDN Connectivity Accept message. The DC Not Allowed contained in the Bearer Setup Request message is information indicating whether or not to allow the MeNB 21 to
30 configure dual connectivity. When the DC Not Allowed indicates to
allow the MeNB 21 to configure dual connectivity, the MME 23 instructs the MeNB 21 to count the amount of packets for each radio bearer by DC Traffic Count Support Indication. [0096]
30 Steps S70 to S77 are the same as Steps S42 to S49 in Fig. 10 and
the detailed description thereof is omitted. Note that, however, the RRC
Connection Reconfiguration message in Step S71 contains a PDN
Connectivity Accept message, instead of the ATTACH Accept message.
5 Further, in Step S73, a Bearer Setup Response message is transmitted
instead of the Initial Context Setup Response message in Step S45 in Fig.
10.
[0097]
As described above, by performing the PDN connectivity
10 establishment process in Figs. 13 and 14, it is possible to determine, for each PDN connectivity, whether or not to cause an eNB to count the amount of packets for each radio bearer. [0098] Fourth Embodiment
15 An E-UTRAN initiated E-RAB modification procedure is
described with reference to Fig. 15. Fig. 15 refers to the E-UTRAN initiated E-RAB modification procedure described in 3GPP TS 23.401 V13.6.1 (2016-03), Section 5.4.7. Fig. 15 shows the flow of a process of adding the SeNB 22 when the MeNB 21 executes dual connectivity.
20 [0099]
First, the MeNB 21 transmits an SeNB Addition Request message to the SeNB 22 (S81). The SeNB Addition Request message contains Count Rule as a parameter. [0100]
25 Next, the SeNB 22 transmits an SeNB Addition Request
Acknowledge message to the MeNB 21 (S82). The MeNB 21 then transmits an RRC Connection Reconfiguration message to the UE 20 (S83). The UE 20 then transmits an RRC Connection Reconfiguration Complete message to the MeNB 21 (S84). Then, the SeNB 22 transmits
30 an SeNB Addition Request Complete message to the MeNB 21 (S85). As a result that the processing in Steps S81 to S85 is performed, the SeNB 22 is added as an eNB that forms dual connectivity. [0101]
After that, the MeNB 21 transmits an E-RAB Modification
31 Indication message to the MME 23 (S86). The E-RAB Modification
Indication message contains DC Charging Activated as a parameter.
Steps S87 to S90 are the same as Steps S46 to S49 in Fig. 10 and the
detailed description thereof is omitted.
5 [0102]
Then, the MME 23 transmits an E-RAB Modification Confirm
message to the MeNB 21 (S91).
[0103]
As described above, as a result of performing the E-UTRAN
10 initiated E-RAB modification procedure in Fig. 15, the MeNB 21 can
transmit DC Charging Activated to the MME 23 when the SeNB 22 is
added as an eNB that forms dual connectivity.
[0104]
On the other hand, in Fig. 10, the MeNB 21 transmits DC Charging
15 Activated to the MME 23 in the Attach process of the UE 20. Thus, Fig.
15 shows that the MeNB 21 counts the amount of packets for each radio
bearer after dual connectivity is actually configured in a radio network.
Therefore, by performing the E-UTRAN initiated E-RAB modification
procedure in Fig. 15, the PGW counts the amount of packets and can
20 thereby carry out charging until dual connectivity is configured.
[0105]
Note that, when performing the E-UTRAN initiated E-RAB
modification procedure in Fig. 15, the MeNB 21 does not contain DC
Charging Activated in a message to be transmitted in Step S45 in Fig. 10
25 and Step S73 in Fig. 14.
[0106]
Fifth Embodiment
An SI release procedure according to a fifth embodiment is
described with reference to Fig. 16. Fig. 16 shows a process to be
30 performed when the UE 20 transitions to the Idle state. To be specific,
Fig. 16 shows the process of releasing a communication bearer related to
the UE 20 between the MeNB 21 and the core network.
[0107]
First, the MeNB 21 determines to activate an SI release procedure
32 upon transition of the UE 20 to the Idle state (SlOl). Next, the MeNB 21
transmits a Traffic Count Report Request message to the SeNB 22 (S102).
The MeNB 21 transmits the Traffic Count Report Request message to the
SeNB 22 in order to cause the SeNB 22 to transmit data about the amount 5 of packets for each radio bearer counted in the SeNB 22.
[0108]
Then, the SeNB 22 transmits a Traffic Count Report message to
the MeNB 21 (S103). The Traffic Count Report message contains
Traffic Data indicating data about the amount of packets for each radio 10 bearer counted in the SeNB 22.
[0109]
Then, the MeNB 21 transmits an SI UE Context Release Request
message to the MME 23 (S104). The SI UE Context Release Request
message contains Traffic Data acquired by the MeNB 21 from the SeNB 15 22 and Traffic Data which is information about the amount of packets
counted in the MeNB 21.
[0110]
Then, the MME 23 transmits a Release Access Bearers Request
message to the SGW 25 (S105). The Release Access Bearers Request 20 message contains the same Traffic Data as the Traffic Data contained in
the SI UE Context Release Request message. The SGW 25 then
transmits a Modify Bearer Request message to the PGW 26 (S106). The
Traffic Data contained in the Modify Bearer Request message in Step
S106 is the same as the Traffic Data contained in the Modify Bearer 25 Request message in Step S105.
[0111]
Then, the PGW 26 transmits a Modify Bearer Response message to
the SGW 25 (S107). The SGW 25 then transmits a Release Access
Bearers Response message to the MME 23 (S108). The MME 23 then 30 transmits an SI UE Context Release Command message to the MeNB 21
(S109).
[0112]
Further, a message used for transmitting Traffic Data is not
limited to the message shown in Fig. 16. The messages after Step S104
33 shown in Fig. 16 are the messages defined in 3GPP. For example, a new
message that is not currently defined in 3GPP may be used as a message
after Step S104. For example, a new message of a Traffic Report
Request message may be used instead of the Modify Bearer Request
5 message. Further, a new message of a Traffic Report Response message
may be used instead of the Modify Bearer Response message.
[0113]
A PDN GW initiated bearer deactivation procedure according to
the fifth embodiment is described hereinafter with reference to Fig. 17.
10 Fig. 17 shows a process to be performed when the PGW 26 determines to delete the communication bearer related to the UE 20. This process may be performed with the UE 20 being in the active state. [0114]
First, the PGW 26 transmits a Delete Bearer Request message to
15 the SGW 25 (Sill). The Delete Bearer Request message contains
identification information of the UE 20. Next, the SGW 25 transmits the Delete Bearer Request message transmitted from the PGW 26 to the MME 23 (S 1 12). The MME 23 then transmits the Delete Bearer Request message transmitted from the SGW 25 to the MeNB 21 (SI 13). The
20 MeNB 21 then transmits an RRC Connection Reconfiguration message to the UE 20 (S 114). The UE 20 then transmits an RRC Connection Reconfiguration Complete message to the MeNB 21 (SI 15). [0115]
Then, the MeNB 21 transmits a Traffic Count Report Request
25 message to the SeNB 22 (S 1 16). The MeNB 21 transmits the Traffic
Count Report Request message to the SeNB 22 in order to cause the SeNB 22 to transmit data about the amount of packets for each radio bearer counted in the SeNB 22. [0116]
30 Then, the SeNB 22 transmits a Traffic Count Report message to
the MeNB 21 (SI 17. The Traffic Count Report message contains Traffic Data indicating data about the amount of packets for each radio bearer counted in the SeNB 22. [0117]
34 Then, the MeNB 21 transmits a Deactive Bearer Response message
to the MME 23 (SI 18). The Deactive Bearer Response message contains
Traffic Data acquired by the MeNB 21 from the SeNB 22 and Traffic Data
which is information about the amount of packets counted in the MeNB
5 21.
[0118]
The MME 23 then transmits the Deactive Bearer Response message
transmitted from the MeNB 21 to the SGW 25 (SI 19). Further, the SGW
25 transmits the Deactive Bearer Response message transmitted from the
10 MME 23 to the PGW 26 (S120).
[0119]
An MME initiated bearer deactivation procedure according to the
fifth embodiment is described hereinafter with reference to Fig. 18. Fig.
18 shows a process to be performed when the MME 23 determines to
15 delete the communication bearer related to the UE 20. This process may
be performed with the UE 20 being in the active state.
[0120]
First, the MME 23 transmits a Delete Bearer Command message to
the SGW 25 (S131). The Delete Bearer Command message contains
20 identification information of the UE 20. Next, the SGW 25 transmits the
Delete Bearer Command message transmitted from the MME 23 to the
PGW 26 (S132).
[0121]
Steps S133 to S142 are the same as Steps Sill to S120 in Fig. 17
25 and the detailed description thereof is omitted.
[0122]
As described above, by performing the processing in Steps S16
and S18, the MeNB 21 can acquire data about the amount of packets for
each radio bearer counted in the SeNB 22 when releasing the
30 communication bearer related to the UE 20.
[0123]
Sixth Embodiment
An X2 HO (Hand Over) procedure is described hereinafter with
reference to Fig. 19. Fig. 19 shows the flow of a handover process
35 without a change in the MME 23. Further, Fig. 19 shows the flow of a
handover process when an eNB, to which handover is made, can count the
amount of packets for each radio bearer.
[0124]
5 A source eNB, from which handover is made, determines to carry
out handover of the UE 20 (S 1 5 1). For example, the MeNB 21 may be
the source eNB. In this case, the MeNB 21 first performs the procedure
shown in Step S51 and Step S52 in Fig. 12 with the SeNB 22 and thereby
acquires Traffic Data measured in the SeNB 22. Next, the source eNB
10 transmits a Handover Request message to a target eNB (S152). The
target eNB is an eNB that forms the communication area to which the UE 20 moves. The Handover Request message contains Count Rule, Traffic Data, and DC Not Allowed. The Count Rule is the Count Rule that is applied when the source eNB counts the amount of packets for each radio
15 bearer. The Traffic Data is information about the amount of packets
counted for each radio bearer in the source eNB. The DC Not Allowed is information indicating whether or not the UE 20 is allowed to configure dual connectivity. [0125]
20 Then, the target eNB transmits a Handover Request Ack message
to the source eNB (S153). The Handover Request Ack message contains DC Traffic Count Support Indication as a parameter. The DC Traffic Count Support Indication is information indicating that the target eNB can count the amount of packets for each radio bearer.
25 [0126]
Next, the source eNB transmits an RRC Connection Reconfiguration message to the UE 20 (S154). The UE 20 transmits an RRC Connection Reconfiguration Complete message to the target eNB (S155).
30 [0127]
Then, the target eNB transmits a Path Switch Request message to the MME 23 in order to switch an eNB which the UE 20 connects to (S156). The MME 23 then transmits a Modify Bearer Request message to the SGW 25 (S157). The SGW 25 then transmits a Modify Bearer
36 Response message to the MME 23 (S158). Then, the MME 23 transmits a
Path Swithc Request Ack message to the target eNB (S159). The target
eNB then transmits a UE Context Release message to the source eNB
(S160).
5 [0128]
By performing the process in Fig 19, a handover process ends
between the source eNB and the target eNB. Further, by performing the
process in Fig 19, processing of counting the amount of packets for each
radio bearer is handed over from the source eNB to the target eNB
10 [0129]
An X2 HO (Hand Over) procedure is described hereinafter with reference to Figs. 20 and 21. Figs. 20 and 21 show the flow of a handover process without a change in the MME 23. Further, Figs. 20 and 21 show the flow of a handover process when an eNB, to which handover
15 is made, cannot count the amount of packets for each radio bearer. [0130]
Steps S171 and S172 are the same as Steps S151 and S152 in Fig. 19 and the detailed description thereof is omitted. Next, the target eNB transmits a Handover Request Ack message to the source eNB (S173).
20 The Handover Request Ack message does not contain DC Traffic Count
Support Indication, or contains DC Traffic Count Not Support Indication. With the Handover Request Ack message not containing DC Traffic Count Support Indication or containing DC Traffic Count Not Support Indication, the target eNB notifies the source eNB that it is not possible
25 to count the amount of packets for each radio bearer. [0131]
Then, the source eNB transmits an E-RAB Modification Indication message to the MME 23 (S174). The E-RAB Modification Indication message contains Traffic Data and DC Traffic Count Stop. The DC
30 Traffic Count Stop is information indicating that counting of the amount of packets for each radio bearer in the source eNB is to stop. Alternatively, the DC Traffic Count Stop may be information indicating that counting of the amount of packets for each radio bearer in the source eNB has stopped.
37 [0132]
The MME 23 transmits a Modify Bearer Request message to the
SGW 25 (S175). The Modify Bearer Request message contains the
Traffic Data and the DC Traffic Count Stop contained in the E-RAB 5 Modification Indication message received in Step S174. The SGW 25
then transmits the Modify Bearer Request message received from MME 23
to the PGW 26 (S176).
[0133]
Then, the PGW 26 transmits a Modify Bearer Response message to 10 the SGW 25 (S177). The SGW 25 then transmits the Modify Bearer
Response message received from the PGW 26 to the MME 23 (S178).
The MME 23 then transmits an E-RAB Modification Confirm message to
the source eNB (S179).
[0134]
15 Steps S180 to S186 in Fig. 21 are the same as Steps S154 to S160
in Fig. 19 and the detailed description thereof is omitted.
[0135]
By performing the process in Figs. 20 and 21, when the target eNB
cannot count the amount of packets for each radio bearer, the source eNB 20 can notify the PGW 26, through the MME 23 and the SGW 25, that
counting of the amount of packets for each radio bearer is to stop. The
PGW 26 can thereby start processing of counting the amount of packets
related to the UE 20. In other words, the PGW 26 can hand over
processing of counting the amount of packets related to the UE 20 from 25 the source eNB.
[0136]
An SI HO procedure is described hereinafter with reference to
Figs 22 and 23. Figs. 22 and 23 show the flow of a handover process
with a change in the MME 23. Further, Figs. 22 and 23 show the flow of 30 a handover process when an eNB, to which handover is made, can count
the amount of packets for each radio bearer.
[0137]
First, a source eNB, from which handover is made, determines to
carry out handover of the UE 20 (S191). For example, the MeNB 21 may
38 be the source eNB. In this case, the MeNB 21 first performs the
procedure shown in Step S51 and Step S52 in Fig. 12 with the SeNB 22
and thereby acquires Traffic Data measured in the SeNB 22. Next, the
source eNB transmits a Handover Required message to a source MME
5 (S192). The source MME may be the MME 23. The Handover Required
message contains Source to Target Transparent Container. The Source
to Target Transparent Container is information containing Count Rule and
Traffic Data.
[0138]
10 Then, the source MME transmits a Forward Relocation Request
message to a target MME (S193). The Forward Relocation Request message contains Source to Target Transparent Container. The source MME adds DC Not Allowed to the Source to Target Transparent Container transmitted from the source eNB. The source MME transmits a Forward
15 Relocation Request message that contains the Source to Target
Transparent Container to which the DC Not Allowed is added. The DC Not Allowed added by the source MME is information indicating whether or not the UE 20 is able to configure dual connectivity. The DC Not Allowed added by the source MME is subscriber information acquired by
20 the source MME from the HSS 24. [0139]
Then, the target MME transmits a Handover Request message to a target eNB (S194). The Handover Request message contains the Source to Target Transparent Container transmitted from the source MME. The
25 target eNB then transmits a Handover Request Acknowledge message to the target MME (S195). The Handover Request Acknowledge contains Target to Source Transparent Container. The Target to Source Transparent Container contains DC Traffic Count Support Indication. The DC Traffic Count Support Indication is information indicating that
30 the target eNB can count the amount of packets for each radio bearer. [0140]
Then, the target MME transmits a Forward Relocation Response message to the source MME (S196). The Forward Relocation Response message contains DC Traffic Count Support Indication and Target to
39 Source Transparent Container. The DC Traffic Count Support Indication
is information indicating whether or not the target MME can deal with
counting the amount of packets for each radio bearer in the target eNB.
The Target to Source Transparent Container is the same as the Target to
5 Source Transparent Container transmitted from the target eNB.
[0141]
Then, the source MME transmits a Handover Command message to
the source eNB (S197). The Handover Command message contains DC
Traffic Count Support Indication and Target to Source Transparent
10 Container. The Target to Source Transparent Container is the same as the Target to Source Transparent Container transmitted from the target MME. Then, the source eNB transmits a Handover Command message to the UE 20 (S198). [0142]
15 Referring to Fig. 23, the UE 20 then transmits a Handover Confirm
message to the target eNB (S199). The target eNB then transmits a Handover Notify message to the target MME (S200). The target MME then transmits a Forward Relocation Complete Notification message to the source MME (S201). The source MME then transmits a Forward
20 Relocation Complete Acknowledge message to the target MME (S202). [0143]
Then, the target MME transmits a Modify Bearer Request message to the SGW 25 (S203). The SGW 25 then transmits a Modify Bearer Response message to the target MME (S204). After that, a TAU
25 (Tracking Area Update) Procedure is performed in the UE 20, the target eNB and the target MME (S205). [0144]
The source MME then transmits a UE Context Release Command message to the source eNB (S206). The source eNB then transmits a UE
30 Context Release Complete message to the source MME (S207). [0145]
An SI HO procedure is described hereinafter with reference to Figs 24 and 26. Figs. 24 and 26 show the flow of a handover process with a change in the MME 23. Further, Figs. 24 and 26 show the flow of
40 a handover process when an eNB, to which handover is made, cannot
count the amount of packets for each radio bearer.
[0146]
Steps S211 and S214 are the same as Steps S191 and S194 in Fig.
5 22 and the detailed description thereof is omitted. Next, the target eNB
transmits a Handover Request Acknowledge message to the target MME
(S215). The Handover Request Acknowledge contains Target to Source
Transparent Container. Further, the Target to Source Transparent
Container does not contain DC Traffic Count Support Indication, or
10 contains DC Traffic Count Not Support Indication. Thus, the target eNB notifies the target MME that it is not possible to count the amount of packets for each radio bearer. [0147]
Then, the target MME transmits a Forward Relocation Response
15 message to the source MME (S216). The Forward Relocation Response message does not contain DC Traffic Count Support Indication, or contains DC Traffic Count Not Support Indication. Further, the Forward Relocation Response message contains Target to Source Transparent Container. Not containing DC Traffic Count Support Indication or
20 containing DC Traffic Count Not Support Indication is information
indicating that the target MME cannot deal with counting the amount of packets for each radio bearer in the target eNB. The Target to Source Transparent Container is the same as the Target to Source Transparent Container transmitted from the target eNB.
25 [0148]
Then, the source MME transmits a Handover Command message to the source eNB (S217). The Handover Command message does not contain DC Traffic Count Support Indication, or contains DC Traffic Count Not Support Indication. Further, the Handover Command message
30 contains Target to Source Transparent Container. The information contained in the Handover Command message is the same as the information contained in the Forward Relocation Response message received in Step S216. [0149]
41 Steps S218 to S225 are substantially the same as Steps S174 and
S179 in Fig. 20. Note that, however, Fig. 25 shows the flow of a
handover process with a change in the MME. Thus, Fig. 25 shows that a
Modify Bearer Request message and a Modify Bearer Response message
5 are transmitted and received between the source MME and the target
MME.
[0150]
Step S226 in Fig. 25 and Steps S227 to S235 in Fig. 26 are the
same as Step S198 in Fig. 22 and Steps S199 to S207 in Fig. 23, and the
10 detailed description thereof is omitted. [0151]
As described above, by performing the process according to the sixth embodiment, it is possible to hand over the amount of packets for each radio bearer counted in the source eNB to the target eNB when
15 handover related to the UE 20 is carried out. Further, when the target eNB cannot count the amount of packets for each radio bearer, the PGW 26 can hand over the counting of the amount of packets related to the UE 20. [0152]
20 Configuration examples of the UE 20, and the MeNB 21 and the
MME 23 described in the plurality of embodiments above are described hereinafter. Fig. 27 is a block diagram showing a configuration example of the eNB 60. Referring to Fig. 27, the MeNB 21 includes an RF transceiver 1001, a network interface 1003, a processor 1004, and a
25 memory 1005. The RF transceiver 1001 performs analog RF signal
processing for communication with the UEs. The RF transceiver 1001 may include a plurality of transceivers. The RF transceiver 1001 is connected to an antenna 1002 and a processor 1004. The RF transceiver 1001 receives modulated symbol data (or OFDM symbol data) from the
30 processor 1004, generates a transmission RF signal and supplies the
transmission RF signal to the antenna 1002. Further, the RF transceiver 1001 generates a baseband received signal based on a received RF signal received by the antenna 1002 and supplies it to the processor 1004. [0153]
42 The network interface 1003 is used for communications with a
network node (e.g., other eNBs, Mobility Management Entity (MME),
Serving Gateway (S-GW), and TSS or ITS server). The network
interface 1003 may include a network interface card (NIC) compliant to
5 IEEE 802.3 series, for example.
[0154]
The processor 1004 performs data plane processing including
digital baseband signal processing and control plane processing for radio
communications. For example, in the case of LTE and LTE-Advanced,
10 the digital baseband signal processing by the processor 1004 may include signal processing of PDCP layer, RLC layer, MAC layer and PHY layer. Further, the signal processing by the processor 1004 may include signal processing of GTP-U-UDP/IP layer in the X2-U interface and the Sl-U interface. Furthermore, the control plane processing by the processor
15 1004 may include processing of X2AP protocol, Sl-MME protocol and RRC protocol. [0155]
The processor 1004 may include a plurality of processors. For example, the processor 1004 may include a modem processor (e.g., DSP)
20 that performs digital baseband signal processing, a processor (e.g., DSP) that performs signal processing of GTP-U-UDP/IP layer in the X2-U interface and the Sl-U interface, and a protocol stack processor (e.g., CPU or MPU) that performs control plane processing. [0156]
25 The memory 1005 is a combination of a volatile memory and a
nonvolatile memory. The memory 1005 may include a plurality of memory devices that are physically independent of one another. The volatile memory is a Static Random Access Memory (SRAM), a Dynamic RAM (DRAM), or a combination of them, for example. The nonvolatile
30 memory is a mask Read Only Memory (MROM), an Electrically Erasable Programmable ROM (EEPROM), a flash memory, a hard disk drive, or a combination of them, for example. The memory 1005 may include a storage that is placed apart from the processor 1004. In this case, the processor 1004 may access the memory 1005 through the network
43 interface 1003 or an I/O interface, which is not shown.
[0157]
The memory 1005 may store a software module (computer
program) containing a group of instructions and data for performing the
5 processing by the MeNB 21 described in the above plurality of
embodiments. In several implementations, the processor 1004 may be
configured to perform the processing of the eNB 60 described in the
above embodiments by reading the software module from the memory
1005 and executing it.
10 [0158]
Fig. 28 is a block diagram showing a configuration example of the UE 20. A Radio Frequency (RF) transceiver 1101 performs analog RF signal processing for communication with the MeNB 21 and the SeNB 22. The analog RF signal processing performed by the RF transceiver 1101
15 includes frequency up-conversion, frequency down-conversion, and
amplification. The RF transceiver 1101 is connected to an antenna 1102 and a baseband processor 1103. Specifically, the RF transceiver 1101 receives modulated symbol data (or OFDM symbol data) from the baseband processor 1103, generates a transmission RF signal and supplies
20 the transmission RF signal to the antenna 1102. Further, the RF
transceiver 1101 generates a baseband received signal based on a received RF signal received by the antenna 1102 and supplies it to the baseband processor 1103. [0159]
25 The baseband processor 1103 performs digital baseband signal
processing (data plane processing) and control plane processing for radio communications. The digital baseband signal processing includes (a) data compression/decompression, (b) data segmentation/concatenation, (c) transmission format (transmission frame) composition/decomposition,
30 (d) transmission path encoding/decoding, (e) modulation(symbol
mapping)/demodulation, and (f) OFDM symbol data (baseband OFDM signal) generation by Inverse Fast Fourier Transform (IFFT) and the like. On the other hand, the control plane processing includes communication management of Layer 1 (e.g., transmission power control), Layer 2 (e.g.,
44 radio resource management and hybrid automatic repeat request (HARQ)
processing), and Layer 3 (e.g., attach, mobility, and signaling related to
call management).
[0160]
5 For example, in the case of LTE and LTE-Advanced, the digital
baseband signal processing by the baseband processor 1103 may include
signal processing of Packet Data Convergence Protocol (PDCP) layer,
Radio Link Control (RLC) layer, MAC layer, and PHY layer. Further,
the control plane processing by the baseband processor 1103 may include
10 processing of Non-Access Stratum (NAS) protocol, RRC protocol, and MAC CE. [0161]
The baseband processor 1103 may include a modem processor (e.g., Digital Signal Processor (DSP)) that performs digital baseband
15 signal processing and a protocol stack processor (e.g., Central Processing Unit (CPU) or Micro Processing Unit (MPU)) that performs control plane processing. In this case, the protocol stack processor that performs control plane processing may be made common to an application processor 1104, which is described below.
20 [0162]
The application processor 1104 is also called a CPU, an MPU, a microprocessor or a processor core. The application processor 1104 may include a plurality of processors (a plurality of processor cores). The application processor 1104 implements each function of the UE 20 by
25 running a system software program (Operating System (OS)) and various application programs (e.g., call application, web browser, mailer, camera control application, music playback application etc.) read from a memory 1106 or a memory, which is not shown. [0163]
30 In several implementations, as shown in the dotted line (1105) in
Fig. 29, the baseband processor 1103 and the application processor 1104 may be integrated into one chip. In other words, the baseband processor 1103 and the application processor 1104 may be implemented as one System on Chip (SoC) device 1105. The SoC device is also called a
45 system Large Scale Integration (LSI) or a chip set in some cases.
[0164]
The memory 1106 is a volatile memory, a nonvolatile memory, or a
combination of them. The memory 1106 may include a plurality of
5 memory devices that are physically independent of one another. The
volatile memory is a Static Random Access Memory (SRAM), a Dynamic
RAM (DRAM), or a combination of them, for example. The nonvolatile
memory is a mask Read Only Memory (MROM), an Electrically Erasable
Programmable ROM (EEPROM), a flash memory, a hard disk drive, or a
10 combination of them, for example. For example, the memory 1106 may include an external memory device that is accessible from the baseband processor 1103, the application processor 1104 and the SoC 1105. The memory 1106 may include an internal memory device that is integrated into the baseband processor 1103, the application processor 1104 or the
15 SoC 1105. Further, the memory 1106 may include a memory in a Universal Integrated Circuit Card (UICC). [0165]
The memory 1106 may store a software module (computer program) containing a group of instructions and data for performing the
20 processing by the UE 20 described in the above plurality of embodiments. In several implementations, the baseband processor 1103 or the application processor 1104 may be configured to perform the processing of the UE 20 described in the above embodiments by reading the software module from the memory 1106 and executing it.
25 [0166]
Fig. 29 is a block diagram showing a configuration example of the MME 23. Referring to Fig. 29, the MME 23 includes a network interface 1201, a processor 1202, and a memory 1203. The network interface 1201 is used to communicate with network nodes (e.g., the eNodeB 130, MME,
30 P-GW). The network interface 1201 may include a network interface card (NIC) that complies with the IEEE 802.3 series, for example. [0167]
The processor 1202 reads and runs software (computer program) from the memory 1203 and thereby executes processing of the MME 23
46 that is described with reference to the sequence charts and the flowcharts
in the embodiments described above. The processor 1202 may be a
microprocessor, an MPU or a CPU, for example. The processor 1202
may include a plurality of processors.
5 [0168]
The memory 1203 is a combination of a volatile memory and a
nonvolatile memory. The memory 1203 may include a storage that is
placed apart from the processor 1202. In this case, the processor 1202
may access the memory 1203 through an I/O interface, which is not
10 shown. [0169]
In the example of Fig. 29, the memory 1203 is used to store a group of software modules. The processor 1202 reads and runs the group of software modules from the memory 1203 and can thereby perform the
15 processing of the MME 23 described in the above embodiments. [0170]
As described with reference to Figs. 27 and 29, each of processors included in the UE 20, the MeNB 21 and the MME 23 in the above embodiments runs one or a plurality of programs including a group of
20 instructions for causing a computer to perform the algorithms described using the drawings. [0171]
In the above example, the program can be stored and provided to the computer using any type of non-transitory computer readable medium.
25 The non-transitory computer readable medium includes any type of tangible storage medium. Examples of the non-transitory computer readable medium include magnetic storage media (such as floppy disks, magnetic tapes, hard disk drives, etc.), optical magnetic storage media (e.g. magneto-optical disks), CD-ROM (Read Only Memory), CD-R ,
30 CD-R/W, DVD-ROM (Digital Versatile Disc Read Only Memory), DVD-R (DVD Recordable)), DVD-R DL (DVD-R Dual Layer)), DVD-RW (DVD Rewritable)), DVD-RAM), DVD + R), DVR+R DL), DVD + RW), BD-R (Blu-ray (registered trademark) Disc Recordable)), BD-RE (Blu-ray (registered trademark) Disc Rewritable)), BD-ROM), and semiconductor
47 memories (such as mask ROM, PROM (Programmable ROM), EPROM
(Erasable PROM), flash ROM, RAM (Random Access Memory), etc.). The
program may be provided to a computer using any type of transitory
computer readable medium. Examples of the transitory computer readable
5 medium include electric signals, optical signals, and electromagnetic
waves. The transitory computer readable medium can provide the program
to a computer via a wired communication line such as an electric wire or
optical fiber or a wireless communication line.
[0172]
10 It should be noted that the present invention is not limited to the
above-described embodiments and may be varied in many ways within the scope of the present invention. Further, in this disclosure, embodiments can be combined as appropriate. [0173]
15 While the invention has been particularly shown and described
with reference to embodiments thereof, the invention is not limited to these embodiments. It will be understood by those of ordinary skill in the art that various changes in form and details may be made therein without departing from the spirit and scope of the present invention as
20 defined by the claims. [0174]
This application is based upon and claims the benefit of priority from Japanese patent application No. 2016-105254 filed on May 26, 2016, the disclosure of which is incorporated herein in its entirety by reference.
25 [0175]
Further, the whole or part of the embodiments disclosed above can be described as, but not limited to, the following supplementary notes. Supplementary Note 1
A communication system comprising:
30 a communication terminal configured to communicate with a
plurality of communication devices by using a different radio bearer for each of the plurality of communication devices; and
a control device configured to determine whether to cause the communication device to measure traffic of each radio bearer.
48 Supplementary Note 2
The communication system according to Supplementary Note 1,
wherein the control device receives, from the communication device,
count support information as to whether the communication device is able
5 to measure traffic of each radio bearer.
Supplementary Note 3
The communication system according to Supplementary Note 2,
wherein the control device determines whether to cause the
communication device to measure traffic of each radio bearer by using the
10 count support information and communication permission information indicating whether the communication terminal is allowed to communicate with a plurality of communication devices by using a plurality of radio bearers. Supplementary Note 4
15 The communication system according to Supplementary Note 3,
wherein the control device receives the communication permission information from a gateway device connected to a charging system and a subscriber information management device. Supplementary Note 5
20 The communication system according to Supplementary Note 4,
wherein the control device receives initiation information indicating initiation of processing of measuring traffic of each radio bearer from the communication device, and transmits the initiation information to the gateway device.
25 Supplementary Note 6
The communication system according to any one of Supplementary Notes 2 to 5, wherein the control device transmits the count support information and count rule information to the communication device. Supplementary Note 7
30 The communication system according to any one of Supplementary
Notes 1 to 6, wherein the communication device receives instruction information instructing to measure traffic of each radio bearer from the control device, and transmits traffic information containing traffic measured for each radio bearer to the control device.
49 Supplementary Note 8
The communication system according to Supplementary Note 7, wherein the control device receives the traffic information, and transmits the traffic information to a gateway device connected to a charging 5 system.
Supplementary Note 9
A control device comprising:
a control unit configured to determine, when a communication terminal communicates with a plurality of communication devices by 10 using a different radio bearer for each of the plurality of communication devices, whether to cause at least one communication device of the plurality of communication devices to measure traffic of each radio bearer.
Supplementary Note 10
15 A communication terminal comprising:
a transmitting unit configured to transmit, to a control device,
support information indicating whether to be able to perform a plurality
of communications by using a different radio bearer for each of a
plurality of communication devices;
20 a receiving unit configured to receive, from the control device, a
determination result of determining whether the communication terminal communicates with a plurality of communication devices by using a plurality of radio bearers based on the support information and communication permission information indicating whether the 25 communication terminal is allowed to communicate with a plurality of communication devices by using a plurality of radio bearers; and
a control unit configured to perform processing of setting up a plurality of radio bearers with a plurality of communication devices when the determination result contains information instructing to communicate 30 with a plurality of communication devices by using a plurality of radio bearers. Supplementary Note 11
A communication method comprising:
determining, when a communication terminal communicates with a
50 plurality of communication devices by using a different radio bearer for
each of the plurality of communication devices, whether to cause at least
one communication device of the plurality of communication devices to
measure traffic of each radio bearer; and
5 transmitting a determination result to the communication device.
Supplementary Note 12
A communication method in a communication system, comprising:
transmitting, from a communication device that wirelessly
communicates with a communication terminal to a control device,
10 information regarding a radio bearer to be used for communications of the
communication terminal.
Supplementary Note 13
The communication method according to Supplementary Note 12,
wherein the information regarding a radio bearer is information
15 indicating whether to support measurement of traffic of each radio bearer.
Supplementary Note 14
The communication method according to Supplementary Note 12
or 13, wherein the control device determines whether to cause the
communication device to measure traffic of each radio bearer based on
20 the information regarding a radio bearer.
Supplementary Note 15
The communication method according to any one of Supplementary
Notes 12 to 14, wherein the control device transmits the information
regarding a radio bearer to a gateway device that transfers
25 communications related to the communication terminal.
Supplementary Note 16
A communication system comprising:
a communication device configured to wirelessly communicate
with a communication terminal; and
30 a control device,
wherein information regarding a radio bearer to be used for
communications of the communication terminal is transmitted from the
communication device to the control device.
Supplementary Note 17
51 The communication system according to Supplementary Note 16,
wherein the information regarding a radio bearer is information
indicating whether to support measurement of traffic of each radio bearer.
Supplementary Note 18
5 The communication system according to Supplementary Note 16 or
17, wherein the control device determines whether to cause the
communication device to measure traffic of each radio bearer based on
the information regarding a radio bearer.
Supplementary Note 19
10 The communication system according to any one of
Supplementary Notes 16 to 18, wherein the control device transmits the
information regarding a radio bearer to a gateway device that transfers
communications related to the communication terminal.
Supplementary Note 20
15 A communication device comprising:
a means for wirelessly communicating with a communication
terminal; and
a means for transmitting information regarding a radio bearer to
be used for communications of the communication terminal to a control 20 device.
Supplementary Note 21
The communication device according to Supplementary Note 20,
wherein the information regarding a radio bearer is information
indicating whether to support measurement of traffic of each radio bearer. 25 Reference Signs List
[0176]
11 COMMUNICATION TERMINAL
12 COMMUNICATION DEVICE
13 COMMUNICATION DEVICE 30 14 CONTROL DEVICE
20 UE
21 MeNB
22 SeNB
23 MME
52
24 HSS
25 SGW
26 PGW
27 PCRF
28 AF
29 OFCS
30 OCS
41 TRANSMITTING AND RECEIVING UNIT
42 TRANSMITTING AND RECEIVING UNIT
43 CONTROLLER
51 BASE STATION COMMUNICATION UNIT
52 SGW COMMUNICATION UNIT
53 HSS COMMUNICATION UNIT
54 CONTROLLER
61 UE COMMUNICATION UNIT
62 BASE STATION COMMUNICATION UNIT
63 C-PLANE COMMUNICATION UNIT
64 U-PLANE COMMUNICATION UNIT
65 CONTROLLER
66 DATA MEASUREMENT UNIT
We Claim:
1. A Mobility Management Entity (MME) comprising:
means for receiving an Attach Request message from a communication terminal during Attach procedure, the Attach Request message including first information indicating that the communication terminal supports Dual Connectivity with a Master base station providing Evolved Universal Terrestrial Radio Access (E-UTRA) and a Secondary base station providing radio communication scheme in 5G;
means for storing the first information; and
means for determining whether or not to restrict use of the Dual Connectivity with the radio communication scheme in 5G for the communication terminal, based on the first information and second information indicating whether or not use of Dual Connectivity with the radio communication scheme in 5G is restricted.
2. The MME according to Claim 1 further comprising:
means for transmitting an Attach Accept message to the communication terminal during the Attach procedure, the Attach Accept message including the second information.
3. The MME according to Claim 1 or 2, wherein the MME is configured to perform Secondary Node Addition procedure for providing radio resources from the Secondary base station to the communication terminal after the Attach procedure.
4. The MME according to any one of Claims 1 to 3 further comprising:
means for selecting a Serving GW (SGW) during the Attach procedure if the MME has the first information and the second information indicating that
the use of Dual Connectivity with the radio communication scheme in 5G is not restricted.
5. The MME according to any one of Claims 1 to 4, wherein the Dual Connectivity is E-UTRA-NR Dual Connectivity (EN-DC).
6. The MME according to any one of Claims 1 to 3, wherein the second information indicates whether or not the use of Dual Connectivity with the radio communication scheme in 5G is restricted by Evolved Packet System (EPS) network.
| # | Name | Date |
|---|---|---|
| 1 | 202118006143-TRANSLATIOIN OF PRIOIRTY DOCUMENTS ETC. [13-02-2021(online)].pdf | 2021-02-13 |
| 2 | 202118006143-STATEMENT OF UNDERTAKING (FORM 3) [13-02-2021(online)].pdf | 2021-02-13 |
| 3 | 202118006143-PROOF OF RIGHT [13-02-2021(online)].pdf | 2021-02-13 |
| 4 | 202118006143-PRIORITY DOCUMENTS [13-02-2021(online)].pdf | 2021-02-13 |
| 5 | 202118006143-POWER OF AUTHORITY [13-02-2021(online)].pdf | 2021-02-13 |
| 6 | 202118006143-NOTIFICATION OF INT. APPLN. NO. & FILING DATE (PCT-RO-105) [13-02-2021(online)].pdf | 2021-02-13 |
| 7 | 202118006143-FORM 1 [13-02-2021(online)].pdf | 2021-02-13 |
| 8 | 202118006143-DRAWINGS [13-02-2021(online)].pdf | 2021-02-13 |
| 9 | 202118006143-DECLARATION OF INVENTORSHIP (FORM 5) [13-02-2021(online)].pdf | 2021-02-13 |
| 10 | 202118006143-COMPLETE SPECIFICATION [13-02-2021(online)].pdf | 2021-02-13 |
| 11 | 202118006143-FORM-9 [03-03-2021(online)].pdf | 2021-03-03 |
| 12 | 202118006143-FORM 18A [08-03-2021(online)].pdf | 2021-03-08 |
| 13 | 202118006143-EVIDENCE OF ELIGIBILTY RULE 24C1j [08-03-2021(online)].pdf | 2021-03-08 |
| 14 | 202118006143-FORM 3 [29-07-2021(online)].pdf | 2021-07-29 |
| 15 | 202118006143-FER.pdf | 2021-10-19 |
| 16 | 202118006143-FORM 3 [14-12-2021(online)].pdf | 2021-12-14 |
| 17 | 202118006143-OTHERS [16-12-2021(online)].pdf | 2021-12-16 |
| 18 | 202118006143-FER_SER_REPLY [16-12-2021(online)].pdf | 2021-12-16 |
| 19 | 202118006143-DRAWING [16-12-2021(online)].pdf | 2021-12-16 |
| 20 | 202118006143-COMPLETE SPECIFICATION [16-12-2021(online)].pdf | 2021-12-16 |
| 21 | 202118006143-CLAIMS [16-12-2021(online)].pdf | 2021-12-16 |
| 22 | 202118006143-ABSTRACT [16-12-2021(online)].pdf | 2021-12-16 |
| 23 | 202118006143-US(14)-HearingNotice-(HearingDate-05-09-2023).pdf | 2023-08-22 |
| 24 | 202118006143-FORM-26 [01-09-2023(online)].pdf | 2023-09-01 |
| 25 | 202118006143-FORM 3 [01-09-2023(online)].pdf | 2023-09-01 |
| 26 | 202118006143-Correspondence to notify the Controller [01-09-2023(online)].pdf | 2023-09-01 |
| 27 | 202118006143-Written submissions and relevant documents [14-09-2023(online)].pdf | 2023-09-14 |
| 28 | 202118006143-PETITION UNDER RULE 137 [14-09-2023(online)].pdf | 2023-09-14 |
| 29 | 202118006143-PatentCertificate18-10-2023.pdf | 2023-10-18 |
| 30 | 202118006143-IntimationOfGrant18-10-2023.pdf | 2023-10-18 |
| 1 | searchstrategyE_13-08-2020E_10-06-2021.pdf |