Abstract: A cyclone is provided which combines a classi fier inlet, which provides at least partial separation of particles according to size, with a by-pass arrangement which diverts selected particles to a cyclone discharge duct. The invention has particular utility in the collection of particles from blast furnace waste gasses.
Cyclone with classifier inlet and small particle by-pass
Introduction
Traditionally, the first stage of dust collection from blast furnace waste gas is a dustcatcher. This is no more than a large vessel with low gas velocities in which coarse dust particles are allowed to settle out. The second stage is a wet scrubber where small particles are removed. Because of its composition, the dust captured in the dustcatcher can be recycled back to the blast furnace. Dust captured in the wet system must be disposed of in other ways because it contains materials such as zinc that cannot be recycled.
Dustcatchcrs invariably do not achieve an ideal split and much recyclable material is passed to the wet system along with the contaminants. A higher efficiency dust removal system is required that maximises the recycle of good material whilst passing on the contaminants to the wet system.
A traditional dry dust collector is the cyclone. Unfortunately, the efficiency of a cyclone tends to be high enough to collect too much of the zinc bearing material.
Cyclone Description
Designing a cyclone to achieve a reduced efficiency is not straightforward. Often the dirty gas inlet conditions are not known accurately or are likely to vary during operation. The necessary efficiency might be unknown and is likely to vary depending upon
changes in dust particle size distribution. During test work it has been found that varying the geometry of the cyclone does not always produce expected changes in dust collection efficiency. The efficiency of a cyclone may be changed at the design stage by reducing the inlet velocity. The effect of this would be to increase the size of the cyclone which consequently increases costs. The result would be a cyclone whose performance remained subject to the vagaries of inlet gas conditions and dust loading and size analysis.
The dirty gas from a blast furnace is traditionally delivered to the first stage cleaning plant via a duct known as a downcomer that slopes steeply, often at an angle between 40 and 55 degrees depending upon site layout. The entry to the cyclone is in the horizontal plane and is rectangular in section. To turn the gas flow into the horizontal plane the designer might consider the use of internal guide vanes, typically in the rectangular section, to improve the flow distribution entering the cyclone. This option is not taken in the current invention.
GB2136326 describes a cyclone separator developed for use in solid fuel combustion systems. A dirty gas enters the cyclone body via a tangential inlet and treated gas exits the cyclone via an axial outlet. A portion of exiting gas that has been treated by the cyclone is drawn from the outlet by suction, for filtering of particles that remain entrained therein.
According to the invention, a cyclone comprises the features set out in claim 1 attached hereto. The current invention is a cyclone with a classifier inlet and a small particle bypass arrangement that allows the efficiency of the cyclone to be adjusted during furnace shut downs or during operation to optimise capture of recyclable material whilst passing on contaminants to the wet cleaning system.
The term 'classifier inlet' means an inlet across which particles are distributed according to their size. Typically, larger particles will be more heavily concentrated in the lower regions of the inlet.
A first embodiment of the invention employs an inlet bend without vanes that enters the cyclone tangentially and acts as a crude classifier, encouraging larger dust particles to accumulate in the lower part of the entry duct.
In another embodiment of the invention, the downcomcr enters the cyclone directly, typically at right angles to a radius of the cylindrical region of the body and without a bend. The classifying effect is transferred to the top part of the cyclone body from where the smaller dust particles are removed via the bypass ducts.
A third embodiment takes advantage of the classifying effect of a dirty gas flow in a horizontal duct. This effect is not as strong as that shown by a bend or an angled entry, but it may still be used in a similar manner, having bypass ducts installed in the lop of the cyclone body as described above.
In all embodiments the cyclone has a long outlet duct which extends into the interior of the cyclone body. The stability of this structure is assured by an extension of the bottom plate of the inlet duct.
Blast furnace top pressures currently tend to be up to 3 barg. The blast furnace design top pressure is the design pressure for the cyclone. It is better to contain these pressures
within a conical or dished end structure rather than by a flat plate. The traditional top of a cyclone is a flat plate. Tests indicate that the top of the cyclone may be conical if desired, or another shape suitable for a pressure vessel, and this is another embodiment of the current invention. If desired the flat top may be retained, but it is economical to construct this flat plate inside the pressure envelope. In this embodiment provision is made for pressure equalisation vents between the enclosed volume and the cyclone outlet duct.
In the event of access being necessary for maintenance, the cyclone in any of the above embodiments is provided with purge lines and purge vents so that blast furnace gas may be removed from the cyclone. In the embodiment with an enclosed volume between the flat plate and the pressure envelope, a purge line or lines arc provided and the pressure equalising vents act as purge vents.
The invention will now be described with reference to figures 1, 2 and 3 attached, each of which illustrates an embodiment of the invention.
Referring to figure 1, a cyclone according to a first embodiment of the invention has a substantially cylindrical body 10 and further comprises an inlet duct 2 having a sloping region 3 and a region 4 which enters the body tangentially by virtue of bend 5.
The bend tends to slow particles down so that larger particles tend to move towards the bottom 6 of the inlet duct but smaller particles are less affected by the bend and remain largely evenly distributed. The larger dust particles are collected by the cyclone in the normal way. A proportion of the smaller particles near the top 7 of the inlet duct, which
contain a high proportion of contaminant, are diverted from the upper end of the cyclone body 10, via a number of bypass ducts 8, and into the cyclone discharge duct 9. The number and size of the bypass ducts 8 depends upon how much of the gas stream is required to be diverted.
Referring to figure 2, in a second embodiment, the inlet duct 2 is sloped and enters the cyclone 1 substantially at right angles to a radius of the cyclone. Again, a particle classifying effect means that smaller particles are preferentially diverted via bypass ducts 8 (only one labelled for clarity).
in the embodiment shown in figure 3, the inlet duct 2 is horizontal. Even in this simple arrangement, a classifying effect means that smaller particles are preferentially diverted via bypass ducts 8 to the discharge duct 9.
In each of the embodiments shown, the bypass ducts are provided with means for individual isolation (not shown), positioned so as to be accessible. This isolation means may be a valve, such as a sliding plate valve, or a blanking plate. A suitable valve may be operated when required. A blanking plate may be inserted or removed during a furnace shutdown. The decision whether to open or close a bypass pipe is made on the evidence derived from measurements of zinc composition of collected cyclone dust.
The cyclone structure and the upper part of the cyclone are designed to support the lower end of the inlet duct 2 so that additional supports are unnecessary.
Claims
1. A cyclone comprising:
a body having a cylindrical region 10;
a classifier inlet duct 2 providing at least partial separation of particles according to size;
a discharge duct 9 and
characterised by at least one bypass duct 8 arranged to divert smaller particles separated
by the classifier inlet duct to the discharge duct.
2. A cyclone according to claim 1, where the inlet duct 2 comprises a sloping region 3, a bend 5 and a region 3 which enters the body tangentially to the cylindrical region.
3. A cyclone according to claim 1, where the inlet duct is sloped and enters the cyclone substantially at right angles to a radius of the cylindrical region.
4. A cyclone according to claim 1, where the inlet duct enters the body horizontally.
5. A cyclone according to any preceding claim, further comprising means for isolating each of the bypass ducts.
6. A cyclone according to any preceding claim, arranged to receive waste gas from a blast furnace via the classifier inlet duct.
7. A method for treating waste gas from a blast furnace, the waste gas containing
particles having a variety of sizes, the method characterised by the steps of:
directing the gas to a cyclone inlet via a duct 2, the duct providing at least partial
separation of particles into regions of the inlet according to particle size;
diverting gas from a region of the inlet having a preponderance of smaller particles to a
discharge duct 9 of the cyclone and
directing particles separated from the gas by the cyclone back, to the blast furnace.
8. A method according to claim 7, wherein directing the gas to a cyclone inlet is effected
via a duct having a bend 5, the bend providing enhanced separation of particles into
regions of the inlet according to particle size.
A cyclone is provided which combines a classi fier inlet, which provides at least partial separation of particles according to size, with a by-pass arrangement which diverts selected particles to a cyclone discharge duct. The invention has particular utility in the collection of particles from blast furnace waste gasses.
| # | Name | Date |
|---|---|---|
| 1 | 2662-KOLNP-2009-RELEVANT DOCUMENTS [18-08-2023(online)].pdf | 2023-08-18 |
| 1 | abstract-2662-kolnp-2009.jpg | 2011-10-07 |
| 2 | 2662-KOLNP-2009-RELEVANT DOCUMENTS [17-09-2022(online)].pdf | 2022-09-17 |
| 2 | 2662-kolnp-2009-specification.pdf | 2011-10-07 |
| 3 | 2662-KOLNP-2009-SCHEDUAL-FORM 3.pdf | 2011-10-07 |
| 3 | 2662-KOLNP-2009-RELEVANT DOCUMENTS [07-09-2021(online)].pdf | 2021-09-07 |
| 4 | 2662-KOLNP-2009-RELEVANT DOCUMENTS [10-02-2020(online)].pdf | 2020-02-10 |
| 4 | 2662-kolnp-2009-pct request form.pdf | 2011-10-07 |
| 5 | 2662-KOLNP-2009-RELEVANT DOCUMENTS [25-01-2019(online)].pdf | 2019-01-25 |
| 5 | 2662-kolnp-2009-international search report.pdf | 2011-10-07 |
| 6 | 2662-KOLNP-2009-Response to office action (Mandatory) [04-01-2019(online)].pdf | 2019-01-04 |
| 6 | 2662-kolnp-2009-international publication.pdf | 2011-10-07 |
| 7 | 2662-kolnp-2009-international preliminary examination report.pdf | 2011-10-07 |
| 7 | 2662-KOLNP-2009-ASSIGNMENT WITH VERIFIED COPY [21-03-2018(online)].pdf | 2018-03-21 |
| 8 | 2662-kolnp-2009-gpa.pdf | 2011-10-07 |
| 8 | 2662-KOLNP-2009-FORM-16 [21-03-2018(online)].pdf | 2018-03-21 |
| 9 | 2662-kolnp-2009-form 5.pdf | 2011-10-07 |
| 9 | 2662-KOLNP-2009-POWER OF AUTHORITY [21-03-2018(online)].pdf | 2018-03-21 |
| 10 | 2662-kolnp-2009-form 3.pdf | 2011-10-07 |
| 10 | 2662-KOLNP-2009-RELEVANT DOCUMENTS [03-02-2018(online)].pdf | 2018-02-03 |
| 11 | 2662-KOLNP-2009-FORM 3.1.1.pdf | 2011-10-07 |
| 11 | 2662-KOLNP-2009-PatentCertificateCoverLetter.pdf | 2017-06-22 |
| 12 | 2662-kolnp-2009-form 2.pdf | 2011-10-07 |
| 12 | Abstract [09-05-2017(online)].pdf | 2017-05-09 |
| 13 | 2662-kolnp-2009-form 18.pdf | 2011-10-07 |
| 13 | Claims [09-05-2017(online)].pdf | 2017-05-09 |
| 14 | 2662-kolnp-2009-form 1.pdf | 2011-10-07 |
| 14 | Description(Complete) [09-05-2017(online)].pdf | 2017-05-09 |
| 15 | 2662-kolnp-2009-drawings.pdf | 2011-10-07 |
| 15 | Description(Complete) [09-05-2017(online)].pdf_492.pdf | 2017-05-09 |
| 16 | 2662-kolnp-2009-description (complete).pdf | 2011-10-07 |
| 16 | Examination Report Reply Recieved [09-05-2017(online)].pdf | 2017-05-09 |
| 17 | Other Document [09-05-2017(online)].pdf | 2017-05-09 |
| 17 | 2662-kolnp-2009-correspondence.pdf | 2011-10-07 |
| 18 | 2662-KOLNP-2009-CORRESPONDENCE 1.2.pdf | 2011-10-07 |
| 18 | Other Document [09-05-2017(online)].pdf_434.pdf | 2017-05-09 |
| 19 | 2662-KOLNP-2009-CORRESPONDENCE 1.1.pdf | 2011-10-07 |
| 19 | Petition Under Rule 137 [09-05-2017(online)].pdf | 2017-05-09 |
| 20 | 2662-kolnp-2009-claims.pdf | 2011-10-07 |
| 20 | Petition Under Rule 137 [09-05-2017(online)].pdf_435.pdf | 2017-05-09 |
| 21 | 2662-kolnp-2009-abstract.pdf | 2011-10-07 |
| 21 | Other Patent Document [11-04-2017(online)].pdf | 2017-04-11 |
| 22 | 2662-KOLNP-2009-(04-09-2013)-PA.pdf | 2013-09-04 |
| 22 | 2662-KOLNP-2009-FER.pdf | 2016-11-17 |
| 23 | 2662-KOLNP-2009-(04-09-2013)-ASSIGNMENT.pdf | 2013-09-04 |
| 23 | 2662-KOLNP-2009-(04-09-2013)-FORM-6.pdf | 2013-09-04 |
| 24 | 2662-KOLNP-2009-(04-09-2013)-FORM-13.pdf | 2013-09-04 |
| 24 | 2662-KOLNP-2009-(04-09-2013)-CORRESPONDENCE.pdf | 2013-09-04 |
| 25 | 2662-KOLNP-2009-(04-09-2013)-CORRESPONDENCE.pdf | 2013-09-04 |
| 25 | 2662-KOLNP-2009-(04-09-2013)-FORM-13.pdf | 2013-09-04 |
| 26 | 2662-KOLNP-2009-(04-09-2013)-ASSIGNMENT.pdf | 2013-09-04 |
| 26 | 2662-KOLNP-2009-(04-09-2013)-FORM-6.pdf | 2013-09-04 |
| 27 | 2662-KOLNP-2009-(04-09-2013)-PA.pdf | 2013-09-04 |
| 27 | 2662-KOLNP-2009-FER.pdf | 2016-11-17 |
| 28 | 2662-kolnp-2009-abstract.pdf | 2011-10-07 |
| 28 | Other Patent Document [11-04-2017(online)].pdf | 2017-04-11 |
| 29 | 2662-kolnp-2009-claims.pdf | 2011-10-07 |
| 29 | Petition Under Rule 137 [09-05-2017(online)].pdf_435.pdf | 2017-05-09 |
| 30 | 2662-KOLNP-2009-CORRESPONDENCE 1.1.pdf | 2011-10-07 |
| 30 | Petition Under Rule 137 [09-05-2017(online)].pdf | 2017-05-09 |
| 31 | 2662-KOLNP-2009-CORRESPONDENCE 1.2.pdf | 2011-10-07 |
| 31 | Other Document [09-05-2017(online)].pdf_434.pdf | 2017-05-09 |
| 32 | 2662-kolnp-2009-correspondence.pdf | 2011-10-07 |
| 32 | Other Document [09-05-2017(online)].pdf | 2017-05-09 |
| 33 | 2662-kolnp-2009-description (complete).pdf | 2011-10-07 |
| 33 | Examination Report Reply Recieved [09-05-2017(online)].pdf | 2017-05-09 |
| 34 | 2662-kolnp-2009-drawings.pdf | 2011-10-07 |
| 34 | Description(Complete) [09-05-2017(online)].pdf_492.pdf | 2017-05-09 |
| 35 | 2662-kolnp-2009-form 1.pdf | 2011-10-07 |
| 35 | Description(Complete) [09-05-2017(online)].pdf | 2017-05-09 |
| 36 | Claims [09-05-2017(online)].pdf | 2017-05-09 |
| 36 | 2662-kolnp-2009-form 18.pdf | 2011-10-07 |
| 37 | 2662-kolnp-2009-form 2.pdf | 2011-10-07 |
| 37 | Abstract [09-05-2017(online)].pdf | 2017-05-09 |
| 38 | 2662-KOLNP-2009-FORM 3.1.1.pdf | 2011-10-07 |
| 38 | 2662-KOLNP-2009-PatentCertificateCoverLetter.pdf | 2017-06-22 |
| 39 | 2662-kolnp-2009-form 3.pdf | 2011-10-07 |
| 39 | 2662-KOLNP-2009-RELEVANT DOCUMENTS [03-02-2018(online)].pdf | 2018-02-03 |
| 40 | 2662-kolnp-2009-form 5.pdf | 2011-10-07 |
| 40 | 2662-KOLNP-2009-POWER OF AUTHORITY [21-03-2018(online)].pdf | 2018-03-21 |
| 41 | 2662-KOLNP-2009-FORM-16 [21-03-2018(online)].pdf | 2018-03-21 |
| 41 | 2662-kolnp-2009-gpa.pdf | 2011-10-07 |
| 42 | 2662-kolnp-2009-international preliminary examination report.pdf | 2011-10-07 |
| 42 | 2662-KOLNP-2009-ASSIGNMENT WITH VERIFIED COPY [21-03-2018(online)].pdf | 2018-03-21 |
| 43 | 2662-KOLNP-2009-Response to office action (Mandatory) [04-01-2019(online)].pdf | 2019-01-04 |
| 43 | 2662-kolnp-2009-international publication.pdf | 2011-10-07 |
| 44 | 2662-KOLNP-2009-RELEVANT DOCUMENTS [25-01-2019(online)].pdf | 2019-01-25 |
| 44 | 2662-kolnp-2009-international search report.pdf | 2011-10-07 |
| 45 | 2662-KOLNP-2009-RELEVANT DOCUMENTS [10-02-2020(online)].pdf | 2020-02-10 |
| 45 | 2662-kolnp-2009-pct request form.pdf | 2011-10-07 |
| 46 | 2662-KOLNP-2009-SCHEDUAL-FORM 3.pdf | 2011-10-07 |
| 46 | 2662-KOLNP-2009-RELEVANT DOCUMENTS [07-09-2021(online)].pdf | 2021-09-07 |
| 47 | 2662-KOLNP-2009-RELEVANT DOCUMENTS [17-09-2022(online)].pdf | 2022-09-17 |
| 47 | 2662-kolnp-2009-specification.pdf | 2011-10-07 |
| 48 | 2662-KOLNP-2009-RELEVANT DOCUMENTS [18-08-2023(online)].pdf | 2023-08-18 |
| 48 | abstract-2662-kolnp-2009.jpg | 2011-10-07 |
| 1 | Search_Strategy_2662_KOLNP_2009_16-11-2016.pdf |