Inventors
5
India
Chenniee PalanisamyBHEL/Trichy
India
Sugali Vishlavat SivaramuluBHEL/Trichy
India
Hameed Mohammed Farooq BashaBHEL/Trichy
India
Ganesan SaravanakumarBHEL/Trichy
India
Ramanandham JagannathanBHEL/Trichy
Claims
3
1
A fuel pipe flexible joint for accommodating and absorbing the effects of downward movement of furnace walls due to thermal expansion of boiler, comprising:- a top sleeve (01) having a pipe collar fixed at one end for connection with the vertical coal piping at its downstream side near the burner assembly; a middle jacket (02) having a flange at one end for connecting said top sleeve (01) using a coupling assembly (03) and a rubber gasket, a bottom seat having a flange at one end for connecting the middle jacket (02), coupling assembly (03) and rubber gasket and the other end having a pipe collar for connection with the vertical coal piping at its upstream side near the burner assembly; two coupling assemblies (03) comprising of six segments of coupling parts each, for coupling said top sleeve (01) with said middle jacket (02) and said bottom seat with said middle jacket (02); two rubber gaskets one for each coupling assembly (03) being used with said coupling assembly (03) for coupling said top sleeve (01) with said middle jacket (02) and said bottom seat (07) with said middle jacket (02); four sets of guiding rods (04) and holders (05) for holding said top sleeve (01) and middle jacket (02) and also for guiding said top sleeve (01) into said middle jacket (02) and to permit lateral deflection; four sets of holding rods (06) and holders for holding said middle jacket (02) and bottom seat (07) in position and to permit any lateral deflection.
2
Fuel pipe flexible joint as claimed in claim 1, forms the assembly, which is mounted in the vertical run of coal piping near the burner assembly. Fuel pipe flexible joint as claimed in claim 2, wherein the vertical ran of coal piping is used for absorbing the effects of downward movement of furnace walls on the coal piping. Fuel pipe flexible joint as claim.ed in claim 2, wherein linear movement of the coal pipes during the boiler operation is accommodated. Fuel pipe flexible joint as claimed in claim 1 or claim 2, slides into the middle jacket (02) and accommodates the linear movement of the coal pipes when the furnace walls move downwards due to thermal expansion during the boiler operation. Fuel pipe flexible joint as claimed in claim 2, wherein relief from excessive loading allows smooth and free tilting of nozzle tips without any overloading in tilting type tangentially fired boilers. Fuel pipe flexible joint as claimed in claim 2, wherein said bottom seat (07) is made to rest on a structural arrangement in the floor.
8
Fuel pipe flexible joint as claimed in claim 2, wherein said coupling assembly (03) is used with the gasket for connecting said top sleeve (01) with the middle jacket (02) and the middle jacket (02) with the bottom seat (07) to reduce the compressive strain in the gasket, the housing in the coupling segment for the gasket.
Specification
Show full textCollapse
WE CLAIM: 1. A fuel pipe flexible joint for accommodating and absorbing the effects of downward movement of furnace walls due to thermal expansion of boiler, comprising:-a top sleeve (01) having a pipe collar fixed at one end for connection with the vertical coal piping at its downstream side near the burner assembly; a middle jacket (02) having a flange at one end for connecting said top sleeve (01) using a coupling assembly (03) and a rubber gasket, a bottom seat having a flange at one end for connecting the middle jacket (02), coupling assembly (03) and rubber gasket and the other end having a pipe collar for connection with the vertical coal piping at its upstream side near the burner assembly; two coupling assemblies (03) comprising of six segments of coupling parts each, for coupling said top sleeve (01) with said middle jacket (02) and said bottom seat with said middle jacket (02); two rubber gaskets one for each coupling assembly (03) being used with said coupling assembly (03) for coupling said top sleeve (01) with said middle jacket (02) and said bottom seat (07) with said middle jacket (02); four sets of guiding rods (04) and holders (05) for holding said top sleeve (01) and middle jacket (02) and also for guiding said top sleeve (01) into said middle jacket (02) and to permit lateral deflection; four sets of holding rods (06) and holders for holding said middle jacket (02) and bottom seat (07) in position and to permit any lateral deflection. 2. Fuel pipe flexible joint as claimed in claim 1, forms the assembly, which is mounted in the vertical run of coal piping near the burner assembly. Fuel pipe flexible joint as claimed in claim 2, wherein the vertical ran of coal piping is used for absorbing the effects of downward movement of furnace walls on the coal piping. Fuel pipe flexible joint as claim.ed in claim 2, wherein linear movement of the coal pipes during the boiler operation is accommodated. Fuel pipe flexible joint as claimed in claim 1 or claim 2, slides into the middle jacket (02) and accommodates the linear movement of the coal pipes when the furnace walls move downwards due to thermal expansion during the boiler operation. Fuel pipe flexible joint as claimed in claim 2, wherein relief from excessive loading allows smooth and free tilting of nozzle tips without any overloading in tilting type tangentially fired boilers. Fuel pipe flexible joint as claimed in claim 2, wherein said bottom seat (07) is made to rest on a structural arrangement in the floor. 8. Fuel pipe flexible joint as claimed in claim 2, wherein said coupling assembly (03) is used with the gasket for connecting said top sleeve (01) with the middle jacket (02) and the middle jacket (02) with the bottom seat (07) to reduce the compressive strain in the gasket, the housing in the coupling segment for the gasket.
Application documents
1
1203-del-2004-gpa.pdf
21 Aug 2011
2
1203-del-2004-form-5.pdf
21 Aug 2011
3
1203-del-2004-form-3.pdf
21 Aug 2011
4
1203-del-2004-form-2.pdf
21 Aug 2011
5
1203-del-2004-form-18.pdf
21 Aug 2011
6
1203-del-2004-form-1.pdf
21 Aug 2011
7
1203-del-2004-drawings.pdf
21 Aug 2011
8
1203-del-2004-description (provisional).pdf
21 Aug 2011
9
1203-del-2004-correspondence-others.pdf
21 Aug 2011
10
1203-DEL-2004-GPA-(10-01-2012).pdf
10 Jan 2012
11
1203-DEL-2004-Form-5-(10-01-2012).pdf
10 Jan 2012
12
1203-DEL-2004-form-2-(10-01-2012).pdf
10 Jan 2012
13
1203-DEL-2004-Drawings-(10-01-2012).pdf
10 Jan 2012
14
1203-DEL-2004-Correspondence Others-(10-01-2012).pdf
10 Jan 2012
15
1203-DEL-2004-Claims-(10-01-2012).pdf
10 Jan 2012
16
1203-del-2004-Correspondence Others-(26-12-2012).pdf
26 Dec 2012
17
1203-del-2004-Form-5-(24-06-2013).pdf
24 Jun 2013
18
1203-del-2004-Correspondence-Others-(24-06-2013).pdf
24 Jun 2013
19
1203-del-2004-Claims-(24-06-2013).pdf
24 Jun 2013
20
1203-del-2004-Correspondence-Others-(25-09-2014).pdf
25 Sep 2014
21
1203-del-2004-Form-1-(10-09-2015).pdf
10 Sep 2015
22
1203-del-2004-Correspondence Others-(10-09-2015).pdf
10 Sep 2015
23
1203-DEL-2004_EXAMREPORT.pdf
30 Jun 2016
24
Other Patent Document [22-03-2017(online)].pdf
22 Mar 2017
25
Form 27 [29-03-2017(online)].pdf
29 Mar 2017
26
1203-DEL-2004-RELEVANT DOCUMENTS [14-03-2018(online)].pdf
14 Mar 2018
27
1203-DEL-2004-RELEVANT DOCUMENTS [25-03-2019(online)].pdf
25 Mar 2019
ERegister / renewals
Ceased
3rd
Renewed 26 Nov 2015
Period 29 Jun 2006 – 29 Jun 2007 · CBR 25576 · Certificate 22562
₹4,000
4th
Renewed 26 Nov 2015
Period 29 Jun 2007 – 29 Jun 2008 · CBR 25576 · Certificate 22563
₹4,000
5th
Renewed 26 Nov 2015
Period 29 Jun 2008 – 29 Jun 2009 · CBR 25576 · Certificate 22564
₹4,000
6th
Renewed 26 Nov 2015
Period 29 Jun 2009 – 29 Jun 2010 · CBR 25576 · Certificate 22565
₹4,000
7th
Renewed 26 Nov 2015
Period 29 Jun 2010 – 29 Jun 2011 · CBR 25576 · Certificate 22566
₹12,000
8th
Renewed 26 Nov 2015
Period 29 Jun 2011 – 29 Jun 2012 · CBR 25576 · Certificate 22567
₹12,000
9th
Renewed 26 Nov 2015
Period 29 Jun 2012 – 29 Jun 2013 · CBR 25576 · Certificate 22568
₹12,000
10th
Renewed 26 Nov 2015
Period 29 Jun 2013 – 29 Jun 2014 · CBR 25576 · Certificate 22569
₹12,000
11th
Renewed 26 Nov 2015
Period 29 Jun 2014 – 29 Jun 2015 · CBR 25576 · Certificate 22570
₹24,000
12th
Renewed 26 Nov 2015
Period 29 Jun 2015 – 29 Jun 2016 · CBR 25576 · Certificate 22571
₹24,000
13th
Renewed 23 May 2016
Period 29 Jun 2016 – 29 Jun 2017 · CBR 11468 · Certificate 10627
₹24,000
14th
Renewed 24 May 2017
Period 29 Jun 2017 – 29 Jun 2018 · CBR 19309 · Certificate 20727
₹24,000
15th
Renewed 31 May 2018
Period 29 Jun 2018 – 29 Jun 2019 · CBR 13941 · Certificate 23650
₹24,000