Sign In to Follow Application
View All Documents & Correspondence

Hybrid Energy Storage Device For Quick Charging

Abstract: The present invention discloses a hybrid energy storage device (100). The hybrid energy storage device (100) comprises a battery pack (102) connected in parallel with a supercapacitor pack (104). The battery pack (102) and the supercapacitor pack (104) are capable of being charged simultaneously by an external power source (106). The battery pack (102) is charged at a high current up to a constant charge phase to store charge upto a predefined level of State of Charge (SoC) of the battery pack (102). The supercapacitor pack (104) is charged to store charge upto a remaining level of SoC of the battery pack (102), enabling fast charging of the hybrid energy storage device (100). A charge controller (106) may regulate charging of the battery pack (102) and the supercapacitor pack (104).

Get Free WhatsApp Updates!
Notices, Deadlines & Correspondence

Patent Information

Application #
Filing Date
07 October 2022
Publication Number
52/2022
Publication Type
INA
Invention Field
ELECTRICAL
Status
Email
patents@remfry.com
Parent Application
Patent Number
Legal Status
Grant Date
2025-01-30
Renewal Date

Applicants

GODI INDIA PVT. LTD.
12(p), 13, 14(p), Road No:2, Hardware Park, Near International Airport, Hyderabad – 500005, India

Inventors

1. Majumder, Mandira
12(p), 13, 14(p), Road No:2, Hardware Park, Near International Airport, Hyderabad – 500005, India
2. Thakur, Anukul
12(p), 13, 14(p), Road No:2, Hardware Park, Near International Airport, Hyderabad – 500005, India
3. Venkateswarlu, Manohar Chinnareddy
12(p), 13, 14(p), Road No:2, Hardware Park, Near International Airport, Hyderabad – 500005, India
4. Jana, Milan
12(p), 13, 14(p), Road No:2, Hardware Park, Near International Airport, Hyderabad – 500005, India
5. Bellie, Hariprakash
12(p), 13, 14(p), Road No:2, Hardware Park, Near International Airport, Hyderabad – 500005, India
6. Godi, Mahesh
12(p), 13, 14(p), Road No:2, Hardware Park, Near International Airport, Hyderabad – 500005, India

Specification

1. A hybrid energy storage device (100), comprising:
a battery pack (102) connected in parallel with a supercapacitor pack (104),
capable of being charged simultaneously by an external power source (106),
wherein the battery pack (102) is charged at a high current up to a constant
charge phase to store charge up to a predefined level of State of Charge (SoC) of the
battery pack (102), and the supercapacitor pack (104) is charged to store charge up to a
remaining level of SoC of the battery pack (102), enabling fast charging of the hybrid
energy storage device (100).
2. The hybrid energy storage device (100) as claimed in claim 1, comprising a charge
controller (108) is connected with the battery pack (102) and the supercapacitor pack
(104) for regulating input current for charging the battery pack (102) till the predefined
level of SoC and for charging the supercapacitor pack (104) till the remaining level of SoC.
3. The hybrid energy storage device (100) as claimed in claim 1, wherein the hybrid
energy storage device (100) is utilized as a power source in a first electric aircraft.
4. The hybrid energy storage device (100) as claimed in claim 3, wherein the external
power source (106) is a DC source disposed in a second electric aircraft for charging
the hybrid energy storage device (100) of the first electric aircraft during a flight.
5. The hybrid energy storage device (100) as claimed in claim 4, wherein the external
power source (106) includes one or more of a solid-state battery fabricated using sulfurbased electrodes and a pack of lithium ion capacitors.
6. The hybrid energy storage device (100) as claimed in claim 1, wherein the battery pack
(102) includes one or more of a metal-sulfur battery, a metal-ion battery, and a metalair battery, and wherein the battery pack (102) utilises one of a solid, inorganic, and an
organic electrolyte.7. The hybrid energy storage device (100) as claimed in claim 1, wherein the battery pack
(102) and the supercapacitor pack (104) are connected in a semi-active topology.
8. The hybrid energy storage device (100) as claimed in claim 1, wherein the predefined
level of SoC of the battery pack (102) range from 50%- 60% and the remaining level
of SoC of the battery pack (102) range from 40%-50%

Documents

Application Documents

# Name Date
1 202241057523-FORM-8 [06-08-2024(online)].pdf 2024-08-06
1 202241057523-IntimationOfGrant30-01-2025.pdf 2025-01-30
1 202241057523-Response to office action [17-12-2024(online)]-1.pdf 2024-12-17
1 202241057523-Response to office action [29-04-2025(online)].pdf 2025-04-29
1 202241057523-STATEMENT OF UNDERTAKING (FORM 3) [07-10-2022(online)].pdf 2022-10-07
2 202241057523-AMMENDED DOCUMENTS [02-08-2024(online)].pdf 2024-08-02
2 202241057523-FORM FOR STARTUP [07-10-2022(online)].pdf 2022-10-07
2 202241057523-FORM FOR STARTUP [30-03-2025(online)]-1.pdf 2025-03-30
2 202241057523-PatentCertificate30-01-2025.pdf 2025-01-30
2 202241057523-Response to office action [17-12-2024(online)].pdf 2024-12-17
3 202241057523-CORRECTED PAGES [02-08-2024(online)].pdf 2024-08-02
3 202241057523-FORM FOR SMALL ENTITY(FORM-28) [07-10-2022(online)].pdf 2022-10-07
3 202241057523-FORM FOR STARTUP [30-03-2025(online)].pdf 2025-03-30
3 202241057523-FORM-8 [06-08-2024(online)].pdf 2024-08-06
3 202241057523-Response to office action [17-12-2024(online)]-1.pdf 2024-12-17
4 202241057523-AMMENDED DOCUMENTS [02-08-2024(online)].pdf 2024-08-02
4 202241057523-ASSIGNMENT WITH VERIFIED COPY [29-03-2025(online)]-1.pdf 2025-03-29
4 202241057523-FORM 1 [07-10-2022(online)].pdf 2022-10-07
4 202241057523-FORM 13 [02-08-2024(online)].pdf 2024-08-02
4 202241057523-Response to office action [17-12-2024(online)].pdf 2024-12-17
5 202241057523-MARKED COPIES OF AMENDEMENTS [02-08-2024(online)].pdf 2024-08-02
5 202241057523-FORM-8 [06-08-2024(online)].pdf 2024-08-06
5 202241057523-EVIDENCE FOR REGISTRATION UNDER SSI(FORM-28) [07-10-2022(online)].pdf 2022-10-07
5 202241057523-CORRECTED PAGES [02-08-2024(online)].pdf 2024-08-02
5 202241057523-ASSIGNMENT WITH VERIFIED COPY [29-03-2025(online)].pdf 2025-03-29
6 202241057523-MARKED COPY [02-08-2024(online)].pdf 2024-08-02
6 202241057523-FORM-16 [29-03-2025(online)]-1.pdf 2025-03-29
6 202241057523-FORM 13 [02-08-2024(online)].pdf 2024-08-02
6 202241057523-EVIDENCE FOR REGISTRATION UNDER SSI [07-10-2022(online)].pdf 2022-10-07
6 202241057523-AMMENDED DOCUMENTS [02-08-2024(online)].pdf 2024-08-02
7 202241057523-CORRECTED PAGES [02-08-2024(online)].pdf 2024-08-02
7 202241057523-DRAWINGS [07-10-2022(online)].pdf 2022-10-07
7 202241057523-FORM-16 [29-03-2025(online)].pdf 2025-03-29
7 202241057523-MARKED COPIES OF AMENDEMENTS [02-08-2024(online)].pdf 2024-08-02
7 202241057523-Written submissions and relevant documents [02-08-2024(online)].pdf 2024-08-02
8 202241057523-Correspondence to notify the Controller [15-07-2024(online)].pdf 2024-07-15
8 202241057523-DECLARATION OF INVENTORSHIP (FORM 5) [07-10-2022(online)].pdf 2022-10-07
8 202241057523-FORM 13 [02-08-2024(online)].pdf 2024-08-02
8 202241057523-FORM-28 [29-03-2025(online)]-1.pdf 2025-03-29
8 202241057523-MARKED COPY [02-08-2024(online)].pdf 2024-08-02
9 202241057523-COMPLETE SPECIFICATION [07-10-2022(online)].pdf 2022-10-07
9 202241057523-FORM-28 [29-03-2025(online)].pdf 2025-03-29
9 202241057523-MARKED COPIES OF AMENDEMENTS [02-08-2024(online)].pdf 2024-08-02
9 202241057523-US(14)-HearingNotice-(HearingDate-19-07-2024).pdf 2024-07-03
9 202241057523-Written submissions and relevant documents [02-08-2024(online)].pdf 2024-08-02
10 202241057523-CLAIMS [27-03-2023(online)].pdf 2023-03-27
10 202241057523-Correspondence to notify the Controller [15-07-2024(online)].pdf 2024-07-15
10 202241057523-FORM-9 [10-10-2022(online)].pdf 2022-10-10
10 202241057523-MARKED COPY [02-08-2024(online)].pdf 2024-08-02
10 202241057523-POWER OF AUTHORITY [29-03-2025(online)]-1.pdf 2025-03-29
11 202241057523-Written submissions and relevant documents [02-08-2024(online)].pdf 2024-08-02
11 202241057523-US(14)-HearingNotice-(HearingDate-19-07-2024).pdf 2024-07-03
11 202241057523-STARTUP [12-10-2022(online)].pdf 2022-10-12
11 202241057523-POWER OF AUTHORITY [29-03-2025(online)].pdf 2025-03-29
11 202241057523-CORRESPONDENCE [27-03-2023(online)].pdf 2023-03-27
12 202241057523-CLAIMS [27-03-2023(online)].pdf 2023-03-27
12 202241057523-Correspondence to notify the Controller [15-07-2024(online)].pdf 2024-07-15
12 202241057523-DRAWING [27-03-2023(online)].pdf 2023-03-27
12 202241057523-FORM28 [12-10-2022(online)].pdf 2022-10-12
12 202241057523-IntimationOfGrant30-01-2025.pdf 2025-01-30
13 202241057523-US(14)-HearingNotice-(HearingDate-19-07-2024).pdf 2024-07-03
13 202241057523-PatentCertificate30-01-2025.pdf 2025-01-30
13 202241057523-FORM 18A [12-10-2022(online)].pdf 2022-10-12
13 202241057523-FER_SER_REPLY [27-03-2023(online)].pdf 2023-03-27
13 202241057523-CORRESPONDENCE [27-03-2023(online)].pdf 2023-03-27
14 202241057523-CLAIMS [27-03-2023(online)].pdf 2023-03-27
14 202241057523-DRAWING [27-03-2023(online)].pdf 2023-03-27
14 202241057523-FER.pdf 2023-01-23
14 202241057523-Proof of Right [06-12-2022(online)].pdf 2022-12-06
14 202241057523-Response to office action [17-12-2024(online)]-1.pdf 2024-12-17
15 202241057523-CORRESPONDENCE [27-03-2023(online)].pdf 2023-03-27
15 202241057523-FER_SER_REPLY [27-03-2023(online)].pdf 2023-03-27
15 202241057523-FORM-26 [06-12-2022(online)].pdf 2022-12-06
15 202241057523-Response to office action [17-12-2024(online)].pdf 2024-12-17
16 202241057523-DRAWING [27-03-2023(online)].pdf 2023-03-27
16 202241057523-FER.pdf 2023-01-23
16 202241057523-FORM-8 [06-08-2024(online)].pdf 2024-08-06
16 202241057523-Proof of Right [06-12-2022(online)].pdf 2022-12-06
17 202241057523-FER_SER_REPLY [27-03-2023(online)].pdf 2023-03-27
17 202241057523-AMMENDED DOCUMENTS [02-08-2024(online)].pdf 2024-08-02
17 202241057523-FORM 18A [12-10-2022(online)].pdf 2022-10-12
17 202241057523-FORM-26 [06-12-2022(online)].pdf 2022-12-06
18 202241057523-CORRECTED PAGES [02-08-2024(online)].pdf 2024-08-02
18 202241057523-DRAWING [27-03-2023(online)].pdf 2023-03-27
18 202241057523-FER.pdf 2023-01-23
18 202241057523-Proof of Right [06-12-2022(online)].pdf 2022-12-06
18 202241057523-FORM28 [12-10-2022(online)].pdf 2022-10-12
19 202241057523-STARTUP [12-10-2022(online)].pdf 2022-10-12
19 202241057523-FORM-26 [06-12-2022(online)].pdf 2022-12-06
19 202241057523-FORM 18A [12-10-2022(online)].pdf 2022-10-12
19 202241057523-FORM 13 [02-08-2024(online)].pdf 2024-08-02
19 202241057523-CORRESPONDENCE [27-03-2023(online)].pdf 2023-03-27
20 202241057523-CLAIMS [27-03-2023(online)].pdf 2023-03-27
20 202241057523-FORM-9 [10-10-2022(online)].pdf 2022-10-10
20 202241057523-FORM28 [12-10-2022(online)].pdf 2022-10-12
20 202241057523-MARKED COPIES OF AMENDEMENTS [02-08-2024(online)].pdf 2024-08-02
20 202241057523-Proof of Right [06-12-2022(online)].pdf 2022-12-06
21 202241057523-US(14)-HearingNotice-(HearingDate-19-07-2024).pdf 2024-07-03
21 202241057523-STARTUP [12-10-2022(online)].pdf 2022-10-12
21 202241057523-MARKED COPY [02-08-2024(online)].pdf 2024-08-02
21 202241057523-FORM 18A [12-10-2022(online)].pdf 2022-10-12
21 202241057523-COMPLETE SPECIFICATION [07-10-2022(online)].pdf 2022-10-07
22 202241057523-Correspondence to notify the Controller [15-07-2024(online)].pdf 2024-07-15
22 202241057523-DECLARATION OF INVENTORSHIP (FORM 5) [07-10-2022(online)].pdf 2022-10-07
22 202241057523-FORM-9 [10-10-2022(online)].pdf 2022-10-10
22 202241057523-FORM28 [12-10-2022(online)].pdf 2022-10-12
22 202241057523-Written submissions and relevant documents [02-08-2024(online)].pdf 2024-08-02
23 202241057523-COMPLETE SPECIFICATION [07-10-2022(online)].pdf 2022-10-07
23 202241057523-Correspondence to notify the Controller [15-07-2024(online)].pdf 2024-07-15
23 202241057523-DRAWINGS [07-10-2022(online)].pdf 2022-10-07
23 202241057523-Written submissions and relevant documents [02-08-2024(online)].pdf 2024-08-02
23 202241057523-STARTUP [12-10-2022(online)].pdf 2022-10-12
24 202241057523-EVIDENCE FOR REGISTRATION UNDER SSI [07-10-2022(online)].pdf 2022-10-07
24 202241057523-FORM-9 [10-10-2022(online)].pdf 2022-10-10
24 202241057523-MARKED COPY [02-08-2024(online)].pdf 2024-08-02
24 202241057523-US(14)-HearingNotice-(HearingDate-19-07-2024).pdf 2024-07-03
24 202241057523-DECLARATION OF INVENTORSHIP (FORM 5) [07-10-2022(online)].pdf 2022-10-07
25 202241057523-MARKED COPIES OF AMENDEMENTS [02-08-2024(online)].pdf 2024-08-02
25 202241057523-EVIDENCE FOR REGISTRATION UNDER SSI(FORM-28) [07-10-2022(online)].pdf 2022-10-07
25 202241057523-DRAWINGS [07-10-2022(online)].pdf 2022-10-07
25 202241057523-COMPLETE SPECIFICATION [07-10-2022(online)].pdf 2022-10-07
25 202241057523-CLAIMS [27-03-2023(online)].pdf 2023-03-27
26 202241057523-CORRESPONDENCE [27-03-2023(online)].pdf 2023-03-27
26 202241057523-DECLARATION OF INVENTORSHIP (FORM 5) [07-10-2022(online)].pdf 2022-10-07
26 202241057523-EVIDENCE FOR REGISTRATION UNDER SSI [07-10-2022(online)].pdf 2022-10-07
26 202241057523-FORM 1 [07-10-2022(online)].pdf 2022-10-07
26 202241057523-FORM 13 [02-08-2024(online)].pdf 2024-08-02
27 202241057523-FORM FOR SMALL ENTITY(FORM-28) [07-10-2022(online)].pdf 2022-10-07
27 202241057523-EVIDENCE FOR REGISTRATION UNDER SSI(FORM-28) [07-10-2022(online)].pdf 2022-10-07
27 202241057523-DRAWINGS [07-10-2022(online)].pdf 2022-10-07
27 202241057523-DRAWING [27-03-2023(online)].pdf 2023-03-27
27 202241057523-CORRECTED PAGES [02-08-2024(online)].pdf 2024-08-02
28 202241057523-AMMENDED DOCUMENTS [02-08-2024(online)].pdf 2024-08-02
28 202241057523-EVIDENCE FOR REGISTRATION UNDER SSI [07-10-2022(online)].pdf 2022-10-07
28 202241057523-FER_SER_REPLY [27-03-2023(online)].pdf 2023-03-27
28 202241057523-FORM 1 [07-10-2022(online)].pdf 2022-10-07
28 202241057523-FORM FOR STARTUP [07-10-2022(online)].pdf 2022-10-07
29 202241057523-EVIDENCE FOR REGISTRATION UNDER SSI(FORM-28) [07-10-2022(online)].pdf 2022-10-07
29 202241057523-FER.pdf 2023-01-23
29 202241057523-STATEMENT OF UNDERTAKING (FORM 3) [07-10-2022(online)].pdf 2022-10-07
29 202241057523-FORM-8 [06-08-2024(online)].pdf 2024-08-06
29 202241057523-FORM FOR SMALL ENTITY(FORM-28) [07-10-2022(online)].pdf 2022-10-07
30 202241057523-FORM 1 [07-10-2022(online)].pdf 2022-10-07
30 202241057523-FORM FOR STARTUP [07-10-2022(online)].pdf 2022-10-07
30 202241057523-FORM-26 [06-12-2022(online)].pdf 2022-12-06
30 202241057523-Response to office action [17-12-2024(online)].pdf 2024-12-17
31 202241057523-FORM FOR SMALL ENTITY(FORM-28) [07-10-2022(online)].pdf 2022-10-07
31 202241057523-Proof of Right [06-12-2022(online)].pdf 2022-12-06
31 202241057523-Response to office action [17-12-2024(online)]-1.pdf 2024-12-17
31 202241057523-STATEMENT OF UNDERTAKING (FORM 3) [07-10-2022(online)].pdf 2022-10-07
32 202241057523-PatentCertificate30-01-2025.pdf 2025-01-30
32 202241057523-FORM FOR STARTUP [07-10-2022(online)].pdf 2022-10-07
32 202241057523-FORM 18A [12-10-2022(online)].pdf 2022-10-12
33 202241057523-FORM28 [12-10-2022(online)].pdf 2022-10-12
33 202241057523-IntimationOfGrant30-01-2025.pdf 2025-01-30
33 202241057523-STATEMENT OF UNDERTAKING (FORM 3) [07-10-2022(online)].pdf 2022-10-07
34 202241057523-POWER OF AUTHORITY [29-03-2025(online)].pdf 2025-03-29
34 202241057523-STARTUP [12-10-2022(online)].pdf 2022-10-12
35 202241057523-FORM-9 [10-10-2022(online)].pdf 2022-10-10
35 202241057523-POWER OF AUTHORITY [29-03-2025(online)]-1.pdf 2025-03-29
36 202241057523-COMPLETE SPECIFICATION [07-10-2022(online)].pdf 2022-10-07
36 202241057523-FORM-28 [29-03-2025(online)].pdf 2025-03-29
37 202241057523-DECLARATION OF INVENTORSHIP (FORM 5) [07-10-2022(online)].pdf 2022-10-07
37 202241057523-FORM-28 [29-03-2025(online)]-1.pdf 2025-03-29
38 202241057523-DRAWINGS [07-10-2022(online)].pdf 2022-10-07
38 202241057523-FORM-16 [29-03-2025(online)].pdf 2025-03-29
39 202241057523-FORM-16 [29-03-2025(online)]-1.pdf 2025-03-29
39 202241057523-EVIDENCE FOR REGISTRATION UNDER SSI [07-10-2022(online)].pdf 2022-10-07
40 202241057523-EVIDENCE FOR REGISTRATION UNDER SSI(FORM-28) [07-10-2022(online)].pdf 2022-10-07
40 202241057523-ASSIGNMENT WITH VERIFIED COPY [29-03-2025(online)].pdf 2025-03-29
41 202241057523-FORM 1 [07-10-2022(online)].pdf 2022-10-07
41 202241057523-ASSIGNMENT WITH VERIFIED COPY [29-03-2025(online)]-1.pdf 2025-03-29
42 202241057523-FORM FOR STARTUP [30-03-2025(online)].pdf 2025-03-30
42 202241057523-FORM FOR SMALL ENTITY(FORM-28) [07-10-2022(online)].pdf 2022-10-07
43 202241057523-FORM FOR STARTUP [30-03-2025(online)]-1.pdf 2025-03-30
43 202241057523-FORM FOR STARTUP [07-10-2022(online)].pdf 2022-10-07
44 202241057523-STATEMENT OF UNDERTAKING (FORM 3) [07-10-2022(online)].pdf 2022-10-07
44 202241057523-Response to office action [29-04-2025(online)].pdf 2025-04-29

Search Strategy

1 SSE_23-01-2023.pdf

ERegister / Renewals

3rd: 28 Apr 2025

From 07/10/2024 - To 07/10/2025