Hybrid Energy Storage Device For Quick Charging

Godi India Pvt. Ltd.
Granted App No 202241057523 Patent 559148 Electrical

Patent information

IP India · live record
Application number
202241057523
Filing date
07 October 2022
Status
Granted
Legal status
Under Extension Period
Publication number
52/2022
Publication type
INA
Invention field
Electrical
Patent number
559148
Grant date
30 January 2025
Next renewal due
07 October 2025Overdue

Abstract

The present invention discloses a hybrid energy storage device (100). The hybrid energy storage device (100) comprises a battery pack (102) connected in parallel with a supercapacitor pack (104). The battery pack (102) and the supercapacitor pack (104) are capable of being charged simultaneously by an external power source (106). The battery pack (102) is charged at a high current up to a constant charge phase to store charge upto a predefined level of State of Charge (SoC) of the battery pack (102). The supercapacitor pack (104) is charged to store charge upto a remaining level of SoC of the battery pack (102), enabling fast charging of the hybrid energy storage device (100). A charge controller (106) may regulate charging of the battery pack (102) and the supercapacitor pack (104).

Applicants

1
India
GODI INDIA PVT. LTD. 12(p), 13, 14(p), Road No:2, Hardware Park, Near International Airport, Hyderabad – 500005, India

Inventors

6
India
Majumder, Mandira12(p), 13, 14(p), Road No:2, Hardware Park, Near International Airport, Hyderabad – 500005, India
India
Thakur, Anukul12(p), 13, 14(p), Road No:2, Hardware Park, Near International Airport, Hyderabad – 500005, India
India
Venkateswarlu, Manohar Chinnareddy12(p), 13, 14(p), Road No:2, Hardware Park, Near International Airport, Hyderabad – 500005, India
India
Jana, Milan12(p), 13, 14(p), Road No:2, Hardware Park, Near International Airport, Hyderabad – 500005, India
India
Bellie, Hariprakash12(p), 13, 14(p), Road No:2, Hardware Park, Near International Airport, Hyderabad – 500005, India
India
Godi, Mahesh12(p), 13, 14(p), Road No:2, Hardware Park, Near International Airport, Hyderabad – 500005, India

Specification

Show full textCollapse

1. A hybrid energy storage device (100), comprising: a battery pack (102) connected in parallel with a supercapacitor pack (104), capable of being charged simultaneously by an external power source (106), wherein the battery pack (102) is charged at a high current up to a constant charge phase to store charge up to a predefined level of State of Charge (SoC) of the battery pack (102), and the supercapacitor pack (104) is charged to store charge up to a remaining level of SoC of the battery pack (102), enabling fast charging of the hybrid energy storage device (100). 2. The hybrid energy storage device (100) as claimed in claim 1, comprising a charge controller (108) is connected with the battery pack (102) and the supercapacitor pack (104) for regulating input current for charging the battery pack (102) till the predefined level of SoC and for charging the supercapacitor pack (104) till the remaining level of SoC. 3. The hybrid energy storage device (100) as claimed in claim 1, wherein the hybrid energy storage device (100) is utilized as a power source in a first electric aircraft. 4. The hybrid energy storage device (100) as claimed in claim 3, wherein the external power source (106) is a DC source disposed in a second electric aircraft for charging the hybrid energy storage device (100) of the first electric aircraft during a flight. 5. The hybrid energy storage device (100) as claimed in claim 4, wherein the external power source (106) includes one or more of a solid-state battery fabricated using sulfurbased electrodes and a pack of lithium ion capacitors. 6. The hybrid energy storage device (100) as claimed in claim 1, wherein the battery pack (102) includes one or more of a metal-sulfur battery, a metal-ion battery, and a metalair battery, and wherein the battery pack (102) utilises one of a solid, inorganic, and an organic electrolyte.7. The hybrid energy storage device (100) as claimed in claim 1, wherein the battery pack (102) and the supercapacitor pack (104) are connected in a semi-active topology. 8. The hybrid energy storage device (100) as claimed in claim 1, wherein the predefined level of SoC of the battery pack (102) range from 50%- 60% and the remaining level of SoC of the battery pack (102) range from 40%-50%

Documents

Sign in to open
Application documents
1 202241057523-FORM-8 [06-08-2024(online)].pdf 06 Aug 2024
1 202241057523-Response to office action [17-12-2024(online)]-1.pdf 17 Dec 2024
1 202241057523-STATEMENT OF UNDERTAKING (FORM 3) [07-10-2022(online)].pdf 07 Oct 2022
2 202241057523-AMMENDED DOCUMENTS [02-08-2024(online)].pdf 02 Aug 2024
2 202241057523-FORM FOR STARTUP [07-10-2022(online)].pdf 07 Oct 2022
2 202241057523-Response to office action [17-12-2024(online)].pdf 17 Dec 2024
3 202241057523-CORRECTED PAGES [02-08-2024(online)].pdf 02 Aug 2024
3 202241057523-FORM FOR SMALL ENTITY(FORM-28) [07-10-2022(online)].pdf 07 Oct 2022
3 202241057523-FORM-8 [06-08-2024(online)].pdf 06 Aug 2024
4 202241057523-FORM 13 [02-08-2024(online)].pdf 02 Aug 2024
4 202241057523-FORM 1 [07-10-2022(online)].pdf 07 Oct 2022
4 202241057523-AMMENDED DOCUMENTS [02-08-2024(online)].pdf 02 Aug 2024
5 202241057523-MARKED COPIES OF AMENDEMENTS [02-08-2024(online)].pdf 02 Aug 2024
5 202241057523-EVIDENCE FOR REGISTRATION UNDER SSI(FORM-28) [07-10-2022(online)].pdf 07 Oct 2022
5 202241057523-CORRECTED PAGES [02-08-2024(online)].pdf 02 Aug 2024
6 202241057523-MARKED COPY [02-08-2024(online)].pdf 02 Aug 2024
6 202241057523-FORM 13 [02-08-2024(online)].pdf 02 Aug 2024
6 202241057523-EVIDENCE FOR REGISTRATION UNDER SSI [07-10-2022(online)].pdf 07 Oct 2022
7 202241057523-Written submissions and relevant documents [02-08-2024(online)].pdf 02 Aug 2024
7 202241057523-MARKED COPIES OF AMENDEMENTS [02-08-2024(online)].pdf 02 Aug 2024
7 202241057523-DRAWINGS [07-10-2022(online)].pdf 07 Oct 2022
8 202241057523-Correspondence to notify the Controller [15-07-2024(online)].pdf 15 Jul 2024
8 202241057523-DECLARATION OF INVENTORSHIP (FORM 5) [07-10-2022(online)].pdf 07 Oct 2022
8 202241057523-MARKED COPY [02-08-2024(online)].pdf 02 Aug 2024
9 202241057523-COMPLETE SPECIFICATION [07-10-2022(online)].pdf 07 Oct 2022
9 202241057523-US(14)-HearingNotice-(HearingDate-19-07-2024).pdf 03 Jul 2024
9 202241057523-Written submissions and relevant documents [02-08-2024(online)].pdf 02 Aug 2024
10 202241057523-CLAIMS [27-03-2023(online)].pdf 27 Mar 2023
10 202241057523-Correspondence to notify the Controller [15-07-2024(online)].pdf 15 Jul 2024
10 202241057523-FORM-9 [10-10-2022(online)].pdf 10 Oct 2022
11 202241057523-CORRESPONDENCE [27-03-2023(online)].pdf 27 Mar 2023
11 202241057523-STARTUP [12-10-2022(online)].pdf 12 Oct 2022
11 202241057523-US(14)-HearingNotice-(HearingDate-19-07-2024).pdf 03 Jul 2024
12 202241057523-CLAIMS [27-03-2023(online)].pdf 27 Mar 2023
12 202241057523-DRAWING [27-03-2023(online)].pdf 27 Mar 2023
12 202241057523-FORM28 [12-10-2022(online)].pdf 12 Oct 2022
13 202241057523-FORM 18A [12-10-2022(online)].pdf 12 Oct 2022
13 202241057523-FER_SER_REPLY [27-03-2023(online)].pdf 27 Mar 2023
13 202241057523-CORRESPONDENCE [27-03-2023(online)].pdf 27 Mar 2023
14 202241057523-DRAWING [27-03-2023(online)].pdf 27 Mar 2023
14 202241057523-FER.pdf 23 Jan 2023
14 202241057523-Proof of Right [06-12-2022(online)].pdf 06 Dec 2022
15 202241057523-FER_SER_REPLY [27-03-2023(online)].pdf 27 Mar 2023
15 202241057523-FORM-26 [06-12-2022(online)].pdf 06 Dec 2022
16 202241057523-FER.pdf 23 Jan 2023
16 202241057523-Proof of Right [06-12-2022(online)].pdf 06 Dec 2022
17 202241057523-FER_SER_REPLY [27-03-2023(online)].pdf 27 Mar 2023
17 202241057523-FORM 18A [12-10-2022(online)].pdf 12 Oct 2022
17 202241057523-FORM-26 [06-12-2022(online)].pdf 06 Dec 2022
18 202241057523-Proof of Right [06-12-2022(online)].pdf 06 Dec 2022
18 202241057523-FORM28 [12-10-2022(online)].pdf 12 Oct 2022
18 202241057523-DRAWING [27-03-2023(online)].pdf 27 Mar 2023
19 202241057523-CORRESPONDENCE [27-03-2023(online)].pdf 27 Mar 2023
19 202241057523-FORM 18A [12-10-2022(online)].pdf 12 Oct 2022
19 202241057523-STARTUP [12-10-2022(online)].pdf 12 Oct 2022
20 202241057523-FORM28 [12-10-2022(online)].pdf 12 Oct 2022
20 202241057523-FORM-9 [10-10-2022(online)].pdf 10 Oct 2022
20 202241057523-CLAIMS [27-03-2023(online)].pdf 27 Mar 2023
21 202241057523-COMPLETE SPECIFICATION [07-10-2022(online)].pdf 07 Oct 2022
21 202241057523-STARTUP [12-10-2022(online)].pdf 12 Oct 2022
21 202241057523-US(14)-HearingNotice-(HearingDate-19-07-2024).pdf 03 Jul 2024
22 202241057523-Correspondence to notify the Controller [15-07-2024(online)].pdf 15 Jul 2024
22 202241057523-DECLARATION OF INVENTORSHIP (FORM 5) [07-10-2022(online)].pdf 07 Oct 2022
22 202241057523-FORM-9 [10-10-2022(online)].pdf 10 Oct 2022
23 202241057523-COMPLETE SPECIFICATION [07-10-2022(online)].pdf 07 Oct 2022
23 202241057523-DRAWINGS [07-10-2022(online)].pdf 07 Oct 2022
23 202241057523-Written submissions and relevant documents [02-08-2024(online)].pdf 02 Aug 2024
24 202241057523-MARKED COPY [02-08-2024(online)].pdf 02 Aug 2024
24 202241057523-EVIDENCE FOR REGISTRATION UNDER SSI [07-10-2022(online)].pdf 07 Oct 2022
24 202241057523-DECLARATION OF INVENTORSHIP (FORM 5) [07-10-2022(online)].pdf 07 Oct 2022
25 202241057523-DRAWINGS [07-10-2022(online)].pdf 07 Oct 2022
25 202241057523-EVIDENCE FOR REGISTRATION UNDER SSI(FORM-28) [07-10-2022(online)].pdf 07 Oct 2022
25 202241057523-MARKED COPIES OF AMENDEMENTS [02-08-2024(online)].pdf 02 Aug 2024
26 202241057523-EVIDENCE FOR REGISTRATION UNDER SSI [07-10-2022(online)].pdf 07 Oct 2022
26 202241057523-FORM 1 [07-10-2022(online)].pdf 07 Oct 2022
26 202241057523-FORM 13 [02-08-2024(online)].pdf 02 Aug 2024
27 202241057523-FORM FOR SMALL ENTITY(FORM-28) [07-10-2022(online)].pdf 07 Oct 2022
27 202241057523-EVIDENCE FOR REGISTRATION UNDER SSI(FORM-28) [07-10-2022(online)].pdf 07 Oct 2022
27 202241057523-CORRECTED PAGES [02-08-2024(online)].pdf 02 Aug 2024
28 202241057523-AMMENDED DOCUMENTS [02-08-2024(online)].pdf 02 Aug 2024
28 202241057523-FORM 1 [07-10-2022(online)].pdf 07 Oct 2022
28 202241057523-FORM FOR STARTUP [07-10-2022(online)].pdf 07 Oct 2022
29 202241057523-STATEMENT OF UNDERTAKING (FORM 3) [07-10-2022(online)].pdf 07 Oct 2022
29 202241057523-FORM FOR SMALL ENTITY(FORM-28) [07-10-2022(online)].pdf 07 Oct 2022
29 202241057523-FORM-8 [06-08-2024(online)].pdf 06 Aug 2024
30 202241057523-FORM FOR STARTUP [07-10-2022(online)].pdf 07 Oct 2022
30 202241057523-Response to office action [17-12-2024(online)].pdf 17 Dec 2024
31 202241057523-Response to office action [17-12-2024(online)]-1.pdf 17 Dec 2024
31 202241057523-STATEMENT OF UNDERTAKING (FORM 3) [07-10-2022(online)].pdf 07 Oct 2022
32 202241057523-PatentCertificate30-01-2025.pdf 30 Jan 2025
33 202241057523-IntimationOfGrant30-01-2025.pdf 30 Jan 2025
34 202241057523-POWER OF AUTHORITY [29-03-2025(online)].pdf 29 Mar 2025
35 202241057523-POWER OF AUTHORITY [29-03-2025(online)]-1.pdf 29 Mar 2025
36 202241057523-FORM-28 [29-03-2025(online)].pdf 29 Mar 2025
37 202241057523-FORM-28 [29-03-2025(online)]-1.pdf 29 Mar 2025
38 202241057523-FORM-16 [29-03-2025(online)].pdf 29 Mar 2025
39 202241057523-FORM-16 [29-03-2025(online)]-1.pdf 29 Mar 2025
40 202241057523-ASSIGNMENT WITH VERIFIED COPY [29-03-2025(online)].pdf 29 Mar 2025
41 202241057523-ASSIGNMENT WITH VERIFIED COPY [29-03-2025(online)]-1.pdf 29 Mar 2025
42 202241057523-FORM FOR STARTUP [30-03-2025(online)].pdf 30 Mar 2025
43 202241057523-FORM FOR STARTUP [30-03-2025(online)]-1.pdf 30 Mar 2025
44 202241057523-Response to office action [29-04-2025(online)].pdf 29 Apr 2025
Search strategy
1SSE_23-01-2023.pdf

ERegister / renewals

Under Extension Period
3rd Renewed 28 Apr 2025 Period 07 Oct 2024 – 07 Oct 2025 · CBR 25313 · Certificate 32625 ₹800