Sign In to Follow Application
View All Documents & Correspondence

Marine Perimeter Security

Abstract: There is equivalent in water to stop boats like a fence on land. Hence boats are free to come to sensitive locations if there is enough water depths. However any sensitive waterfront facility would like to keep hostile boats away. Current security systems help to detect such boats by radar or sonars. There is hardly any option to physically prevent a boat from entering like a fence on land. The apparatus described here is a floating fence to stop a boat upto certain size and speed from crossing over, the perimeter or designated security line. Since many operational boats have to enter the facility waters, there is a floating gate to allow bona fide boats to enter the perimeter security line.

Get Free WhatsApp Updates!
Notices, Deadlines & Correspondence

Patent Information

Application #
Filing Date
15 July 2020
Publication Number
03/2022
Publication Type
INA
Invention Field
ELECTRONICS
Status
Email
Parent Application
Patent Number
Legal Status
Grant Date
2025-10-10
Renewal Date

Applicants

ALPHAMERS LIMITED
4TH FLOOR, ABOVE EASYDAY, ADJ SAI BABA TEMPLE,#58, ANAND NAGAR MAIN ROAD, BENGALURU-560024.

Inventors

1. D CHANDRASEKHAR
A3 WESTERN MANOR 2ND CROSS, ATHMANANDA COLONY, BANGALORE, KARNATAKA, INDIA-560032.

Specification

SUMMARY
There are many types of fences on land to protect any area from intrusions and
provide perimeter security. However, most facilities that have a water front do
not have perimeter security arrangement on water side, thus remain vulnerable
to intrusion and attacks from water side.
This invention is a floating security barrier that serves to act as a floating
security fence on water.
This will stop any boat intruding into the perimeter up to a specified
displacement and speed.
DESCRIPTION
Working
a. The entire assembly serves to stop a boat crossing a perimeter security line like a floating fence.
b. The floats (1) provide buoyancy to the entire systems. The floats are hollow metallic boxes which are fully sealed from all sides.
c. The chain (7) provides tensile strength to the entire system. The chain (7) runs along the entire length of the assembly.

d. The chain (7) passes inside the pipe guide fitted under the float (1). This ensures the non buoyancy chain (7) -is supported at regular intervals by the buoyant floats (1).
e. The float (1) is not allowed to move on the chain (7) by fitting chain lock pin (8) to the pipe guide (5) passing through the chain (7). This is to . ensure that floats (1) are not pushed to one side, which will cause more gaps between floats (1) and will cause the chain (7) to hang lower in these gaps, thereby allowing any boat to cross over it.
f. Vertical pipes (6) are fitted under the floats to hold the ballast (4) at low level in the assembly. This low ballast (4) helps lower centre of gravity, and provide a righting moment in combination with the float (1) when the assembly is tilted to one side.
g. Spikes (3) are fitted to the front of the assembly to damage any boat that tries to force its way through this barrier. These spikes are fitted to the doubler plate (2) which are in turn fitted to the upper side or front side of the float (1). This doubler plate (2) is to ensure distribution of load on float (1) when spike (3) is impacted by any boat.
h. The spikes (3) are fitted at an angle or roughly 20 degree to 70.degree above the horizontal. This ensures that when any boat impacts, the spikes and the float are not pushed down, which will allow the boat to force its way across over it.
i. When the boat impacts the spikes, it will push the spikes upwards, and the entire assembly will rotate when seen in end view. The ballast (4) with ballast lever (6) will be forced to rise up over an arc of a circle. This will cause a righting torque and a couple to be set up between the upward force through the floats (1) and the downward force through the ballast (4). This will make the assembly upright to its original position and resist the boat movement.
j. All spikes is fitted at upward angle to horizontal and perpendicular to the float when seen in top view. Only one of these spikes (9) per float fitted at one end of float is positioned at an angle of 45 degrees with respect to other spikes (3). This spike (9) covers the gap between the floats, so any boat shall not attempt to crossover between the floats (1).
Claim 1:
We claim - Entire assembly arrangement that serves to form an effective barrier
to boats.
Claim 2:
We claim - The passing of chain through the pipe guides for a simple and effective way of supporting the chain.
Claim 3:
We claim - Securing of floats to chain at particular position by locking pin to prevent sliding of floats on the chain.
Claim 4:
We claim - The positioning and angle of spike to damage a boat.

Documents

Orders

Section Controller Decision Date
43 Shubhanshu Gautam 2025-10-10
43 Shubhanshu Gautam 2025-10-10
43 Shubhanshu Gautam 2025-10-10

Application Documents

# Name Date
1 202041030123-MSME Certificate_15-07-2020.pdf 2020-07-15
1 202041030123-PETITION UNDER RULE 137 [17-02-2025(online)].pdf 2025-02-17
1 202041030123-Reply from Defence.pdf 2024-10-17
1 202041030123-US(14)-HearingNotice-(HearingDate-21-01-2025).pdf 2024-12-18
2 202041030123-Defence-30-08-2024.pdf 2024-08-30
2 202041030123-Form28_Small Entity_15-07-2020.pdf 2020-07-15
2 202041030123-Proof of Right [17-02-2025(online)].pdf 2025-02-17
2 202041030123-Reply from Defence.pdf 2024-10-17
3 202041030123-ABSTRACT [17-02-2024(online)].pdf 2024-02-17
3 202041030123-Defence-30-08-2024.pdf 2024-08-30
3 202041030123-Form2 Title Page_Provisional_15-07-2020.pdf 2020-07-15
3 202041030123-Written submissions and relevant documents [11-02-2025(online)].pdf 2025-02-11
4 202041030123-ABSTRACT [17-02-2024(online)].pdf 2024-02-17
4 202041030123-AMMENDED DOCUMENTS [17-02-2024(online)].pdf 2024-02-17
4 202041030123-Correspondence to notify the Controller [26-01-2025(online)].pdf 2025-01-26
4 202041030123-Form1_As Filed_15-07-2020.pdf 2020-07-15
5 202041030123-US(14)-ExtendedHearingNotice-(HearingDate-28-01-2025)-1130.pdf 2025-01-17
5 202041030123-Drawings_As Filed_15-07-2020.pdf 2020-07-15
5 202041030123-CLAIMS [17-02-2024(online)].pdf 2024-02-17
5 202041030123-AMMENDED DOCUMENTS [17-02-2024(online)].pdf 2024-02-17
6 202041030123-US(14)-HearingNotice-(HearingDate-21-01-2025).pdf 2024-12-18
6 202041030123-Description Provisional_As Filed_15-07-2020.pdf 2020-07-15
6 202041030123-COMPLETE SPECIFICATION [17-02-2024(online)].pdf 2024-02-17
6 202041030123-CLAIMS [17-02-2024(online)].pdf 2024-02-17
7 202041030123-COMPLETE SPECIFICATION [17-02-2024(online)].pdf 2024-02-17
7 202041030123-CORRESPONDENCE [17-02-2024(online)].pdf 2024-02-17
7 202041030123-Correspondence_15-07-2020.pdf 2020-07-15
7 202041030123-Reply from Defence.pdf 2024-10-17
8 202041030123-Claims_As Filed_15-07-2020.pdf 2020-07-15
8 202041030123-CORRESPONDENCE [17-02-2024(online)].pdf 2024-02-17
8 202041030123-Defence-30-08-2024.pdf 2024-08-30
8 202041030123-DRAWING [17-02-2024(online)].pdf 2024-02-17
9 202041030123-ABSTRACT [17-02-2024(online)].pdf 2024-02-17
9 202041030123-DRAWING [17-02-2024(online)].pdf 2024-02-17
9 202041030123-FER_SER_REPLY [17-02-2024(online)].pdf 2024-02-17
9 202041030123-Form5_Complete After Provisional_02-07-2021.pdf 2021-07-02
10 202041030123-AMMENDED DOCUMENTS [17-02-2024(online)].pdf 2024-02-17
10 202041030123-FER_SER_REPLY [17-02-2024(online)].pdf 2024-02-17
10 202041030123-FORM 13 [17-02-2024(online)].pdf 2024-02-17
10 202041030123-Form28_Startup_02-07-2021.pdf 2021-07-02
11 202041030123-CLAIMS [17-02-2024(online)].pdf 2024-02-17
11 202041030123-FORM 13 [17-02-2024(online)].pdf 2024-02-17
11 202041030123-FORM 3 [17-02-2024(online)].pdf 2024-02-17
11 202041030123-Form2 Title Page_Complete_02-07-2021.pdf 2021-07-02
12 202041030123-COMPLETE SPECIFICATION [17-02-2024(online)].pdf 2024-02-17
12 202041030123-Drawing_Complete After Provisional_02-07-2021.pdf 2021-07-02
12 202041030123-FER.pdf 2023-08-18
12 202041030123-FORM 3 [17-02-2024(online)].pdf 2024-02-17
13 202041030123-FORM 13 [28-07-2023(online)].pdf 2023-07-28
13 202041030123-FER.pdf 2023-08-18
13 202041030123-Description Complete_Complete After Provisional_02-07-2021.pdf 2021-07-02
13 202041030123-CORRESPONDENCE [17-02-2024(online)].pdf 2024-02-17
14 202041030123-Correspondence_Udyam Registration Certificate_02-07-2021.pdf 2021-07-02
14 202041030123-DRAWING [17-02-2024(online)].pdf 2024-02-17
14 202041030123-FORM 13 [28-07-2023(online)].pdf 2023-07-28
14 202041030123-FORM 18A [28-07-2023(online)].pdf 2023-07-28
15 202041030123-Correspondence_Complete After Provisional_02-07-2021.pdf 2021-07-02
15 202041030123-FER_SER_REPLY [17-02-2024(online)].pdf 2024-02-17
15 202041030123-FORM 18A [28-07-2023(online)].pdf 2023-07-28
15 202041030123-FORM28 [28-07-2023(online)].pdf 2023-07-28
16 202041030123-Claims_Complete After Provisional_02-07-2021.pdf 2021-07-02
16 202041030123-FORM 13 [17-02-2024(online)].pdf 2024-02-17
16 202041030123-FORM28 [28-07-2023(online)].pdf 2023-07-28
16 202041030123-MSME CERTIFICATE [28-07-2023(online)].pdf 2023-07-28
17 202041030123-Abstract_Complete After Provisional_02-07-2021.pdf 2021-07-02
17 202041030123-FORM 3 [17-02-2024(online)].pdf 2024-02-17
17 202041030123-MSME CERTIFICATE [28-07-2023(online)].pdf 2023-07-28
17 202041030123-POA [28-07-2023(online)].pdf 2023-07-28
18 202041030123-Abstract_Complete After Provisional_02-07-2021.pdf 2021-07-02
18 202041030123-FER.pdf 2023-08-18
18 202041030123-POA [28-07-2023(online)].pdf 2023-07-28
19 202041030123-Abstract_Complete After Provisional_02-07-2021.pdf 2021-07-02
19 202041030123-Claims_Complete After Provisional_02-07-2021.pdf 2021-07-02
19 202041030123-FORM 13 [28-07-2023(online)].pdf 2023-07-28
19 202041030123-MSME CERTIFICATE [28-07-2023(online)].pdf 2023-07-28
20 202041030123-Claims_Complete After Provisional_02-07-2021.pdf 2021-07-02
20 202041030123-Correspondence_Complete After Provisional_02-07-2021.pdf 2021-07-02
20 202041030123-FORM 18A [28-07-2023(online)].pdf 2023-07-28
20 202041030123-FORM28 [28-07-2023(online)].pdf 2023-07-28
21 202041030123-FORM28 [28-07-2023(online)].pdf 2023-07-28
21 202041030123-FORM 18A [28-07-2023(online)].pdf 2023-07-28
21 202041030123-Correspondence_Udyam Registration Certificate_02-07-2021.pdf 2021-07-02
21 202041030123-Correspondence_Complete After Provisional_02-07-2021.pdf 2021-07-02
22 202041030123-Correspondence_Udyam Registration Certificate_02-07-2021.pdf 2021-07-02
22 202041030123-Description Complete_Complete After Provisional_02-07-2021.pdf 2021-07-02
22 202041030123-FORM 13 [28-07-2023(online)].pdf 2023-07-28
22 202041030123-MSME CERTIFICATE [28-07-2023(online)].pdf 2023-07-28
23 202041030123-Description Complete_Complete After Provisional_02-07-2021.pdf 2021-07-02
23 202041030123-Drawing_Complete After Provisional_02-07-2021.pdf 2021-07-02
23 202041030123-FER.pdf 2023-08-18
23 202041030123-POA [28-07-2023(online)].pdf 2023-07-28
24 202041030123-Form2 Title Page_Complete_02-07-2021.pdf 2021-07-02
24 202041030123-FORM 3 [17-02-2024(online)].pdf 2024-02-17
24 202041030123-Drawing_Complete After Provisional_02-07-2021.pdf 2021-07-02
24 202041030123-Abstract_Complete After Provisional_02-07-2021.pdf 2021-07-02
25 202041030123-FORM 13 [17-02-2024(online)].pdf 2024-02-17
25 202041030123-Form2 Title Page_Complete_02-07-2021.pdf 2021-07-02
25 202041030123-Form28_Startup_02-07-2021.pdf 2021-07-02
25 202041030123-Claims_Complete After Provisional_02-07-2021.pdf 2021-07-02
26 202041030123-Correspondence_Complete After Provisional_02-07-2021.pdf 2021-07-02
26 202041030123-FER_SER_REPLY [17-02-2024(online)].pdf 2024-02-17
26 202041030123-Form28_Startup_02-07-2021.pdf 2021-07-02
26 202041030123-Form5_Complete After Provisional_02-07-2021.pdf 2021-07-02
27 202041030123-Claims_As Filed_15-07-2020.pdf 2020-07-15
27 202041030123-Correspondence_Udyam Registration Certificate_02-07-2021.pdf 2021-07-02
27 202041030123-DRAWING [17-02-2024(online)].pdf 2024-02-17
27 202041030123-Form5_Complete After Provisional_02-07-2021.pdf 2021-07-02
28 202041030123-Description Complete_Complete After Provisional_02-07-2021.pdf 2021-07-02
28 202041030123-Correspondence_15-07-2020.pdf 2020-07-15
28 202041030123-CORRESPONDENCE [17-02-2024(online)].pdf 2024-02-17
28 202041030123-Claims_As Filed_15-07-2020.pdf 2020-07-15
29 202041030123-COMPLETE SPECIFICATION [17-02-2024(online)].pdf 2024-02-17
29 202041030123-Correspondence_15-07-2020.pdf 2020-07-15
29 202041030123-Description Provisional_As Filed_15-07-2020.pdf 2020-07-15
29 202041030123-Drawing_Complete After Provisional_02-07-2021.pdf 2021-07-02
30 202041030123-CLAIMS [17-02-2024(online)].pdf 2024-02-17
30 202041030123-Description Provisional_As Filed_15-07-2020.pdf 2020-07-15
30 202041030123-Drawings_As Filed_15-07-2020.pdf 2020-07-15
30 202041030123-Form2 Title Page_Complete_02-07-2021.pdf 2021-07-02
31 202041030123-AMMENDED DOCUMENTS [17-02-2024(online)].pdf 2024-02-17
31 202041030123-Drawings_As Filed_15-07-2020.pdf 2020-07-15
31 202041030123-Form1_As Filed_15-07-2020.pdf 2020-07-15
31 202041030123-Form28_Startup_02-07-2021.pdf 2021-07-02
32 202041030123-ABSTRACT [17-02-2024(online)].pdf 2024-02-17
32 202041030123-Form1_As Filed_15-07-2020.pdf 2020-07-15
32 202041030123-Form2 Title Page_Provisional_15-07-2020.pdf 2020-07-15
32 202041030123-Form5_Complete After Provisional_02-07-2021.pdf 2021-07-02
33 202041030123-Claims_As Filed_15-07-2020.pdf 2020-07-15
33 202041030123-Defence-30-08-2024.pdf 2024-08-30
33 202041030123-Form2 Title Page_Provisional_15-07-2020.pdf 2020-07-15
33 202041030123-Form28_Small Entity_15-07-2020.pdf 2020-07-15
34 202041030123-Correspondence_15-07-2020.pdf 2020-07-15
34 202041030123-Form28_Small Entity_15-07-2020.pdf 2020-07-15
34 202041030123-MSME Certificate_15-07-2020.pdf 2020-07-15
34 202041030123-Reply from Defence.pdf 2024-10-17
35 202041030123-Description Provisional_As Filed_15-07-2020.pdf 2020-07-15
35 202041030123-MSME Certificate_15-07-2020.pdf 2020-07-15
35 202041030123-US(14)-HearingNotice-(HearingDate-21-01-2025).pdf 2024-12-18
36 202041030123-Drawings_As Filed_15-07-2020.pdf 2020-07-15
36 202041030123-US(14)-ExtendedHearingNotice-(HearingDate-28-01-2025)-1130.pdf 2025-01-17
37 202041030123-Correspondence to notify the Controller [26-01-2025(online)].pdf 2025-01-26
37 202041030123-Form1_As Filed_15-07-2020.pdf 2020-07-15
38 202041030123-Form2 Title Page_Provisional_15-07-2020.pdf 2020-07-15
38 202041030123-Written submissions and relevant documents [11-02-2025(online)].pdf 2025-02-11
39 202041030123-Proof of Right [17-02-2025(online)].pdf 2025-02-17
39 202041030123-Form28_Small Entity_15-07-2020.pdf 2020-07-15
40 202041030123-PETITION UNDER RULE 137 [17-02-2025(online)].pdf 2025-02-17
40 202041030123-MSME Certificate_15-07-2020.pdf 2020-07-15
41 202041030123-PatentCertificate10-10-2025.pdf 2025-10-10
42 202041030123-IntimationOfGrant10-10-2025.pdf 2025-10-10

Search Strategy

1 Search_202041030123E_16-08-2023.pdf

ERegister / Renewals