Marine Perimeter Security

Alphamers Limited
Granted App No 202041030123 Patent 571880 Electronics

Patent information

IP India · live record
Application number
202041030123
Filing date
15 July 2020
Status
Granted
Legal status
Inforce
Publication number
03/2022
Publication type
INA
Invention field
Electronics
Patent number
571880
Grant date
10 October 2025
Next renewal due
10 January 2026Overdue

Abstract

There is equivalent in water to stop boats like a fence on land. Hence boats are free to come to sensitive locations if there is enough water depths. However any sensitive waterfront facility would like to keep hostile boats away. Current security systems help to detect such boats by radar or sonars. There is hardly any option to physically prevent a boat from entering like a fence on land. The apparatus described here is a floating fence to stop a boat upto certain size and speed from crossing over, the perimeter or designated security line. Since many operational boats have to enter the facility waters, there is a floating gate to allow bona fide boats to enter the perimeter security line.

Applicants

1
India
ALPHAMERS LIMITED 4TH FLOOR, ABOVE EASYDAY, ADJ SAI BABA TEMPLE,#58, ANAND NAGAR MAIN ROAD, BENGALURU-560024.

Inventors

1
India
D CHANDRASEKHARA3 WESTERN MANOR 2ND CROSS, ATHMANANDA COLONY, BANGALORE, KARNATAKA, INDIA-560032.

Specification

Show full textCollapse

SUMMARY There are many types of fences on land to protect any area from intrusions and provide perimeter security. However, most facilities that have a water front do not have perimeter security arrangement on water side, thus remain vulnerable to intrusion and attacks from water side. This invention is a floating security barrier that serves to act as a floating security fence on water. This will stop any boat intruding into the perimeter up to a specified displacement and speed. DESCRIPTION Working a. The entire assembly serves to stop a boat crossing a perimeter security line like a floating fence. b. The floats (1) provide buoyancy to the entire systems. The floats are hollow metallic boxes which are fully sealed from all sides. c. The chain (7) provides tensile strength to the entire system. The chain (7) runs along the entire length of the assembly.

d. The chain (7) passes inside the pipe guide fitted under the float (1). This ensures the non buoyancy chain (7) -is supported at regular intervals by the buoyant floats (1). e. The float (1) is not allowed to move on the chain (7) by fitting chain lock pin (8) to the pipe guide (5) passing through the chain (7). This is to . ensure that floats (1) are not pushed to one side, which will cause more gaps between floats (1) and will cause the chain (7) to hang lower in these gaps, thereby allowing any boat to cross over it. f. Vertical pipes (6) are fitted under the floats to hold the ballast (4) at low level in the assembly. This low ballast (4) helps lower centre of gravity, and provide a righting moment in combination with the float (1) when the assembly is tilted to one side. g. Spikes (3) are fitted to the front of the assembly to damage any boat that tries to force its way through this barrier. These spikes are fitted to the doubler plate (2) which are in turn fitted to the upper side or front side of the float (1). This doubler plate (2) is to ensure distribution of load on float (1) when spike (3) is impacted by any boat. h. The spikes (3) are fitted at an angle or roughly 20 degree to 70.degree above the horizontal. This ensures that when any boat impacts, the spikes and the float are not pushed down, which will allow the boat to force its way across over it. i. When the boat impacts the spikes, it will push the spikes upwards, and the entire assembly will rotate when seen in end view. The ballast (4) with ballast lever (6) will be forced to rise up over an arc of a circle. This will cause a righting torque and a couple to be set up between the upward force through the floats (1) and the downward force through the ballast (4). This will make the assembly upright to its original position and resist the boat movement. j. All spikes is fitted at upward angle to horizontal and perpendicular to the float when seen in top view. Only one of these spikes (9) per float fitted at one end of float is positioned at an angle of 45 degrees with respect to other spikes (3). This spike (9) covers the gap between the floats, so any boat shall not attempt to crossover between the floats (1). Claim 1: We claim - Entire assembly arrangement that serves to form an effective barrier to boats. Claim 2: We claim - The passing of chain through the pipe guides for a simple and effective way of supporting the chain. Claim 3: We claim - Securing of floats to chain at particular position by locking pin to prevent sliding of floats on the chain. Claim 4: We claim - The positioning and angle of spike to damage a boat.

Documents

Sign in to open
Orders
Section 43Controller: Shubhanshu Gautam 10 Oct 2025
Section 43Controller: Shubhanshu Gautam 10 Oct 2025
Section 43Controller: Shubhanshu Gautam 10 Oct 2025
Application documents
1 202041030123-MSME Certificate_15-07-2020.pdf 15 Jul 2020
1 202041030123-Reply from Defence.pdf 17 Oct 2024
1 202041030123-US(14)-HearingNotice-(HearingDate-21-01-2025).pdf 18 Dec 2024
2 202041030123-Defence-30-08-2024.pdf 30 Aug 2024
2 202041030123-Form28_Small Entity_15-07-2020.pdf 15 Jul 2020
2 202041030123-Reply from Defence.pdf 17 Oct 2024
3 202041030123-ABSTRACT [17-02-2024(online)].pdf 17 Feb 2024
3 202041030123-Defence-30-08-2024.pdf 30 Aug 2024
3 202041030123-Form2 Title Page_Provisional_15-07-2020.pdf 15 Jul 2020
4 202041030123-Form1_As Filed_15-07-2020.pdf 15 Jul 2020
4 202041030123-AMMENDED DOCUMENTS [17-02-2024(online)].pdf 17 Feb 2024
4 202041030123-ABSTRACT [17-02-2024(online)].pdf 17 Feb 2024
5 202041030123-Drawings_As Filed_15-07-2020.pdf 15 Jul 2020
5 202041030123-CLAIMS [17-02-2024(online)].pdf 17 Feb 2024
5 202041030123-AMMENDED DOCUMENTS [17-02-2024(online)].pdf 17 Feb 2024
6 202041030123-Description Provisional_As Filed_15-07-2020.pdf 15 Jul 2020
6 202041030123-COMPLETE SPECIFICATION [17-02-2024(online)].pdf 17 Feb 2024
6 202041030123-CLAIMS [17-02-2024(online)].pdf 17 Feb 2024
7 202041030123-Correspondence_15-07-2020.pdf 15 Jul 2020
7 202041030123-CORRESPONDENCE [17-02-2024(online)].pdf 17 Feb 2024
7 202041030123-COMPLETE SPECIFICATION [17-02-2024(online)].pdf 17 Feb 2024
8 202041030123-Claims_As Filed_15-07-2020.pdf 15 Jul 2020
8 202041030123-CORRESPONDENCE [17-02-2024(online)].pdf 17 Feb 2024
8 202041030123-DRAWING [17-02-2024(online)].pdf 17 Feb 2024
9 202041030123-DRAWING [17-02-2024(online)].pdf 17 Feb 2024
9 202041030123-FER_SER_REPLY [17-02-2024(online)].pdf 17 Feb 2024
9 202041030123-Form5_Complete After Provisional_02-07-2021.pdf 02 Jul 2021
10 202041030123-FER_SER_REPLY [17-02-2024(online)].pdf 17 Feb 2024
10 202041030123-FORM 13 [17-02-2024(online)].pdf 17 Feb 2024
10 202041030123-Form28_Startup_02-07-2021.pdf 02 Jul 2021
11 202041030123-FORM 13 [17-02-2024(online)].pdf 17 Feb 2024
11 202041030123-FORM 3 [17-02-2024(online)].pdf 17 Feb 2024
11 202041030123-Form2 Title Page_Complete_02-07-2021.pdf 02 Jul 2021
12 202041030123-Drawing_Complete After Provisional_02-07-2021.pdf 02 Jul 2021
12 202041030123-FER.pdf 18 Aug 2023
12 202041030123-FORM 3 [17-02-2024(online)].pdf 17 Feb 2024
13 202041030123-FORM 13 [28-07-2023(online)].pdf 28 Jul 2023
13 202041030123-FER.pdf 18 Aug 2023
13 202041030123-Description Complete_Complete After Provisional_02-07-2021.pdf 02 Jul 2021
14 202041030123-Correspondence_Udyam Registration Certificate_02-07-2021.pdf 02 Jul 2021
14 202041030123-FORM 13 [28-07-2023(online)].pdf 28 Jul 2023
14 202041030123-FORM 18A [28-07-2023(online)].pdf 28 Jul 2023
15 202041030123-Correspondence_Complete After Provisional_02-07-2021.pdf 02 Jul 2021
15 202041030123-FORM 18A [28-07-2023(online)].pdf 28 Jul 2023
15 202041030123-FORM28 [28-07-2023(online)].pdf 28 Jul 2023
16 202041030123-Claims_Complete After Provisional_02-07-2021.pdf 02 Jul 2021
16 202041030123-FORM28 [28-07-2023(online)].pdf 28 Jul 2023
16 202041030123-MSME CERTIFICATE [28-07-2023(online)].pdf 28 Jul 2023
17 202041030123-Abstract_Complete After Provisional_02-07-2021.pdf 02 Jul 2021
17 202041030123-MSME CERTIFICATE [28-07-2023(online)].pdf 28 Jul 2023
17 202041030123-POA [28-07-2023(online)].pdf 28 Jul 2023
18 202041030123-Abstract_Complete After Provisional_02-07-2021.pdf 02 Jul 2021
18 202041030123-POA [28-07-2023(online)].pdf 28 Jul 2023
19 202041030123-Abstract_Complete After Provisional_02-07-2021.pdf 02 Jul 2021
19 202041030123-Claims_Complete After Provisional_02-07-2021.pdf 02 Jul 2021
19 202041030123-MSME CERTIFICATE [28-07-2023(online)].pdf 28 Jul 2023
20 202041030123-Claims_Complete After Provisional_02-07-2021.pdf 02 Jul 2021
20 202041030123-Correspondence_Complete After Provisional_02-07-2021.pdf 02 Jul 2021
20 202041030123-FORM28 [28-07-2023(online)].pdf 28 Jul 2023
21 202041030123-FORM 18A [28-07-2023(online)].pdf 28 Jul 2023
21 202041030123-Correspondence_Udyam Registration Certificate_02-07-2021.pdf 02 Jul 2021
21 202041030123-Correspondence_Complete After Provisional_02-07-2021.pdf 02 Jul 2021
22 202041030123-Correspondence_Udyam Registration Certificate_02-07-2021.pdf 02 Jul 2021
22 202041030123-Description Complete_Complete After Provisional_02-07-2021.pdf 02 Jul 2021
22 202041030123-FORM 13 [28-07-2023(online)].pdf 28 Jul 2023
23 202041030123-Description Complete_Complete After Provisional_02-07-2021.pdf 02 Jul 2021
23 202041030123-Drawing_Complete After Provisional_02-07-2021.pdf 02 Jul 2021
23 202041030123-FER.pdf 18 Aug 2023
24 202041030123-Form2 Title Page_Complete_02-07-2021.pdf 02 Jul 2021
24 202041030123-FORM 3 [17-02-2024(online)].pdf 17 Feb 2024
24 202041030123-Drawing_Complete After Provisional_02-07-2021.pdf 02 Jul 2021
25 202041030123-Form2 Title Page_Complete_02-07-2021.pdf 02 Jul 2021
25 202041030123-Form28_Startup_02-07-2021.pdf 02 Jul 2021
25 202041030123-FORM 13 [17-02-2024(online)].pdf 17 Feb 2024
26 202041030123-FER_SER_REPLY [17-02-2024(online)].pdf 17 Feb 2024
26 202041030123-Form28_Startup_02-07-2021.pdf 02 Jul 2021
26 202041030123-Form5_Complete After Provisional_02-07-2021.pdf 02 Jul 2021
27 202041030123-Claims_As Filed_15-07-2020.pdf 15 Jul 2020
27 202041030123-DRAWING [17-02-2024(online)].pdf 17 Feb 2024
27 202041030123-Form5_Complete After Provisional_02-07-2021.pdf 02 Jul 2021
28 202041030123-Correspondence_15-07-2020.pdf 15 Jul 2020
28 202041030123-CORRESPONDENCE [17-02-2024(online)].pdf 17 Feb 2024
28 202041030123-Claims_As Filed_15-07-2020.pdf 15 Jul 2020
29 202041030123-COMPLETE SPECIFICATION [17-02-2024(online)].pdf 17 Feb 2024
29 202041030123-Correspondence_15-07-2020.pdf 15 Jul 2020
29 202041030123-Description Provisional_As Filed_15-07-2020.pdf 15 Jul 2020
30 202041030123-CLAIMS [17-02-2024(online)].pdf 17 Feb 2024
30 202041030123-Description Provisional_As Filed_15-07-2020.pdf 15 Jul 2020
30 202041030123-Drawings_As Filed_15-07-2020.pdf 15 Jul 2020
31 202041030123-AMMENDED DOCUMENTS [17-02-2024(online)].pdf 17 Feb 2024
31 202041030123-Drawings_As Filed_15-07-2020.pdf 15 Jul 2020
31 202041030123-Form1_As Filed_15-07-2020.pdf 15 Jul 2020
32 202041030123-ABSTRACT [17-02-2024(online)].pdf 17 Feb 2024
32 202041030123-Form1_As Filed_15-07-2020.pdf 15 Jul 2020
32 202041030123-Form2 Title Page_Provisional_15-07-2020.pdf 15 Jul 2020
33 202041030123-Defence-30-08-2024.pdf 30 Aug 2024
33 202041030123-Form2 Title Page_Provisional_15-07-2020.pdf 15 Jul 2020
33 202041030123-Form28_Small Entity_15-07-2020.pdf 15 Jul 2020
34 202041030123-Form28_Small Entity_15-07-2020.pdf 15 Jul 2020
34 202041030123-MSME Certificate_15-07-2020.pdf 15 Jul 2020
34 202041030123-Reply from Defence.pdf 17 Oct 2024
35 202041030123-MSME Certificate_15-07-2020.pdf 15 Jul 2020
35 202041030123-US(14)-HearingNotice-(HearingDate-21-01-2025).pdf 18 Dec 2024
36 202041030123-US(14)-ExtendedHearingNotice-(HearingDate-28-01-2025)-1130.pdf 17 Jan 2025
37 202041030123-Correspondence to notify the Controller [26-01-2025(online)].pdf 26 Jan 2025
38 202041030123-Written submissions and relevant documents [11-02-2025(online)].pdf 11 Feb 2025
39 202041030123-Proof of Right [17-02-2025(online)].pdf 17 Feb 2025
40 202041030123-PETITION UNDER RULE 137 [17-02-2025(online)].pdf 17 Feb 2025
41 202041030123-PatentCertificate10-10-2025.pdf 10 Oct 2025
42 202041030123-IntimationOfGrant10-10-2025.pdf 10 Oct 2025
Search strategy
1Search_202041030123E_16-08-2023.pdf

ERegister / renewals

Inforce

No renewals recorded.