A Floating Drain Filter

Alphamers Limited
Granted App No 202041030122 Patent 535053 Civil

Patent information

IP India · live record
Application number
202041030122
Filing date
15 July 2020
Status
Granted
Legal status
Inforce
Publication number
03/2022
Publication type
INA
Invention field
Civil
Patent number
535053
Grant date
25 April 2024
Next renewal due
15 July 2027

Abstract

ABSTRACTS OF THE INVENTION The floating trash in drains often clog the drain and cause flooding besides the foul smell. In storm water drains of widths upto 6 meters, this apparatus stops all surface trash and allows water to flow past. Since the device is floating, it automatically floats and stops surface trash only. The water flows underneath the barrier. This is a stiff barrier, not flexible and the sides graze against the sidewalls of the storm water drain. Hence it is equipped with a curved pipe ends for smooth sliding against the sidewalls without snagging.

Applicants

1
India
ALPHAMERS LIMITED 4TH FLOOR, ABOVE EASYDAY, ADJ SAI BABA TEMPLE,#58, ANAND NAGAR MAIN ROAD, BENGALURU-560024.

Inventors

1
India
D CHANDRASEKHARA3 WESTERN MANOR 2ND CROSS, ATHMANANDA COLONY, BANGALORE, KARNATAKA, INDIA-560032.

Specification

Show full textCollapse

DESCRIPTION Working of the Medium size Drain Filter a. This is a floating filter assembly to separate trash and plastics floating on water surface in streams and drains. This assembly is secured on both sides to the side walls or to the bank by chains. b. As the floats are laid out c. The assembly consists of floats (1) connected to main frame (2) and these floats provide buoyancy and ensures the entire assembly and its weight is supported on water surface. d. The floats are connected to the main frame with strengthening members (3) to provide strength to the connection between the floats and the main frame. e. There are two floats (1) on the back (downstream) side of the mesh (5) and one float (7) in front of the mesh (5). These floats together provide the full buoyancy to the assembly. The float on the upstream side (7) ensures the assembly does not tilt or fall to the forward side. These floats ensure the buoyancy is well spread out and the centre of gravity of the assembly and the downward force through this centre of gravity falls between these floats. f. There is a mesh (5) with mesh opening of pre specified size which stops trash on the upstream side which is larger than this mesh opening. This mesh extends for the full width of the assembly. This mesh is made of steel or aluminium to give it strength against impact by trash. g. As the assembly is held by chain in its place the flowing waters bring the surface trash to the upstream side of this mesh (5). The trash and plastics larger than the mesh opening size is trapped in front of the mesh while the water is free to flow through the mesh and under the mesh. h. This also ensures the upstream side is never flooded since water is free to flow below the floating MDF assembly. i. This mesh (5) is held in place by strength members (6). These strength members are curved at the bottom (8) and this gives a curved shape to the mesh at the bottom. j. This curved shape (8) is given so that trash which is trapped does not slip below the mesh and go past the assemble. k. On ends of the main frame, there are curved rubbing members (4). These curved rubbing members ensure that the system slides up and down freely within the drain walls and the point of contact with the side walls is not a sharp point that may snag on the wall. 1. The assembly is held by chain connected to main frame at the eye (9) and the other end of the chain is connected to the walls. m. When there is no water in the canal or drain, the entire assembly is sitting on the canal bed. When water level rises in the canal, the entire assembly starts lifting and floats on water surface. n. Thus the system ensures it is floating stably and trash is trapped on the font side of the assembly. o. Lifting eyes are added to facilitate the installation of MDF (10).

Claim 1: We claim - the particular arrangement of the floats on the frame, that ensures a stable floating platform, in running waters when trash is collected on upstream side. Claim 2: We claim - The flower shaped semi circular pipes on extremities of width which . act as rubbing bands on side walls. Claim 3: We claim - The curved shape at bottom of the mesh strengthening members that stop trash from escaping under the mesh.

Documents

Sign in to open
Application documents
1 202041030122-MSME Certificate_15-07-2020.pdf 15 Jul 2020
2 202041030122-Form28_Small Entity_15-07-2020.pdf 15 Jul 2020
3 202041030122-Form2 Title Page_Provisional_15-07-2020.pdf 15 Jul 2020
4 202041030122-Form1_As Filed_15-07-2020.pdf 15 Jul 2020
5 202041030122-Drawings_As Filed_15-07-2020.pdf 15 Jul 2020
6 202041030122-Description Provisional_As Filed_15-07-2020.pdf 15 Jul 2020
7 202041030122-Correspondence_15-07-2020.pdf 15 Jul 2020
8 202041030122-Claims_As Filed_15-07-2020.pdf 15 Jul 2020
9 202041030122-Form5_Complete After Provisional_02-07-2021.pdf 02 Jul 2021
10 202041030122-Form28_Startup_02-07-2021.pdf 02 Jul 2021
11 202041030122-Form2 Title Page_Complete_02-07-2021.pdf 02 Jul 2021
12 202041030122-Drawing_Complete After Provisional_02-07-2021.pdf 02 Jul 2021
13 202041030122-Description Complete_Complete After Provisional_02-07-2021.pdf 02 Jul 2021
14 202041030122-Correspondence_Udyam Registration Certificate_02-07-2021.pdf 02 Jul 2021
15 202041030122-Correspondence_Complete After Provisional_02-07-2021.pdf 02 Jul 2021
16 202041030122-Claims_Complete After Provisional_02-07-2021.pdf 02 Jul 2021
17 202041030122-Abstract_Complete After Provisional_02-07-2021.pdf 02 Jul 2021
18 202041030122-Form 18_Examination Request_17-06-2022.pdf 17 Jun 2022
19 202041030122-Correspondence_Form18_17-06-2022.pdf 17 Jun 2022
20 202041030122-FER.pdf 27 Jul 2022
21 202041030122-FORM 3 [27-01-2023(online)].pdf 27 Jan 2023
22 202041030122-FORM 13 [27-01-2023(online)].pdf 27 Jan 2023
23 202041030122-FER_SER_REPLY [27-01-2023(online)].pdf 27 Jan 2023
24 202041030122-DRAWING [27-01-2023(online)].pdf 27 Jan 2023
25 202041030122-CORRESPONDENCE [27-01-2023(online)].pdf 27 Jan 2023
26 202041030122-COMPLETE SPECIFICATION [27-01-2023(online)].pdf 27 Jan 2023
27 202041030122-CLAIMS [27-01-2023(online)].pdf 27 Jan 2023
28 202041030122-ABSTRACT [27-01-2023(online)].pdf 27 Jan 2023
29 202041030122-US(14)-HearingNotice-(HearingDate-04-04-2024).pdf 14 Mar 2024
30 202041030122-Correspondence to notify the Controller [03-04-2024(online)].pdf 03 Apr 2024
31 202041030122-Written submissions and relevant documents [19-04-2024(online)].pdf 19 Apr 2024
32 202041030122-PatentCertificate25-04-2024.pdf 25 Apr 2024
33 202041030122-IntimationOfGrant25-04-2024.pdf 25 Apr 2024
34 202041030122-FORM FOR SMALL ENTITY [30-08-2024(online)].pdf 30 Aug 2024
35 202041030122-EVIDENCE FOR REGISTRATION UNDER SSI [30-08-2024(online)].pdf 30 Aug 2024
Search strategy
1202111015064E_22-07-2022.pdf

ERegister / renewals

Inforce
3rd Renewed 20 Jul 2024 Period 15 Jul 2022 – 15 Jul 2023 · CBR 46744 · Certificate 130565 ₹800
4th Renewed 20 Jul 2024 Period 15 Jul 2023 – 15 Jul 2024 · CBR 46744 · Certificate 130566 ₹800
5th Renewed 20 Jul 2024 Period 15 Jul 2024 – 15 Jul 2025 · CBR 46744 · Certificate 130567 ₹800
6th Renewed 20 Jul 2024 Period 15 Jul 2025 – 15 Jul 2026 · CBR 46744 · Certificate 130568 ₹800
7th Renewed 20 Jul 2024 Period 15 Jul 2026 – 15 Jul 2027 · CBR 46744 · Certificate 130569 ₹2,400