Abstract: The present invention provides a method for constructing an access floor by using unmanned robot, the method comprising: a first step (S100) of constructing an installation frame (10) and a peripheral slab (60) formed on the periphery of the installation frame: a second step (S200) of positioning the unmanned robot on the peripheral slab (60); and a third step (S300) of coupling a floor (30) to the installation frame (10) by the unmanned robot while moving along the peripheral slab (60). According to the present invention, an automated robot can install a mat and floor in place of a worker performing dangerous floor installation work, so as to prevent the occurrence of workplace safety accidents. Furthermore, through the installation of a mat and floor by the robot, floor installation location selection and leveling work can be quickly performed, so as to reduce the construction costs and shorten the construction period.
| # | Name | Date |
|---|---|---|
| 1 | 202347001365.pdf | 2023-01-06 |
| 2 | 202347001365-TRANSLATIOIN OF PRIOIRTY DOCUMENTS ETC. [06-01-2023(online)].pdf | 2023-01-06 |
| 3 | 202347001365-STATEMENT OF UNDERTAKING (FORM 3) [06-01-2023(online)].pdf | 2023-01-06 |
| 4 | 202347001365-REQUEST FOR EXAMINATION (FORM-18) [06-01-2023(online)].pdf | 2023-01-06 |
| 5 | 202347001365-PRIORITY DOCUMENTS [06-01-2023(online)].pdf | 2023-01-06 |
| 6 | 202347001365-FORM 18 [06-01-2023(online)].pdf | 2023-01-06 |
| 7 | 202347001365-FORM 1 [06-01-2023(online)].pdf | 2023-01-06 |
| 8 | 202347001365-DRAWINGS [06-01-2023(online)].pdf | 2023-01-06 |
| 9 | 202347001365-DECLARATION OF INVENTORSHIP (FORM 5) [06-01-2023(online)].pdf | 2023-01-06 |
| 10 | 202347001365-COMPLETE SPECIFICATION [06-01-2023(online)].pdf | 2023-01-06 |
| 11 | 202347001365-FER.pdf | 2023-02-01 |
| 12 | 202347001365-Proof of Right [07-02-2023(online)].pdf | 2023-02-07 |
| 13 | 202347001365-FORM-26 [07-02-2023(online)].pdf | 2023-02-07 |
| 14 | 202347001365-PETITION UNDER RULE 137 [19-07-2023(online)].pdf | 2023-07-19 |
| 15 | 202347001365-OTHERS [19-07-2023(online)].pdf | 2023-07-19 |
| 16 | 202347001365-Information under section 8(2) [19-07-2023(online)].pdf | 2023-07-19 |
| 17 | 202347001365-FORM 3 [19-07-2023(online)].pdf | 2023-07-19 |
| 18 | 202347001365-FER_SER_REPLY [19-07-2023(online)].pdf | 2023-07-19 |
| 19 | 202347001365-ENDORSEMENT BY INVENTORS [19-07-2023(online)].pdf | 2023-07-19 |
| 20 | 202347001365-DRAWING [19-07-2023(online)].pdf | 2023-07-19 |
| 21 | 202347001365-CORRESPONDENCE [19-07-2023(online)].pdf | 2023-07-19 |
| 22 | 202347001365-COMPLETE SPECIFICATION [19-07-2023(online)].pdf | 2023-07-19 |
| 23 | 202347001365-CLAIMS [19-07-2023(online)].pdf | 2023-07-19 |
| 24 | 202347001365-PatentCertificate12-03-2024.pdf | 2024-03-12 |
| 25 | 202347001365-IntimationOfGrant12-03-2024.pdf | 2024-03-12 |
| 1 | floorconstructionmethodE_01-02-2023.pdf |