Abstract
The invention relates to a method of forming an optimized tube nest layout for compact single pass condenser to achieve uniform steam flow distribution and equalized pressure drop across different tube bundles from all directions around the tube nest; the steam condensor condenser comprising a steam inlet (9) through which steam is received; a gas extraction pipe (11); a condensate outlet (8) through which condensate condensed on the cooling tubes is discharged, and a vessel (10), the method comprising the steps of ;constructing the tube nest with at least four six types of tube bundles (12,12a,12b, 13, 13a, 7) with a plurality of cooling tubes forming a first type of tube bundles (12,12a,12b,13, 13a)to act as condensing zone and a second type of tube bundle (7) acting as an air cooling zone; and arranging two tube nests as mirror image to each other in a double section condenser, characterized in that the steam received from a steam inlet (9) is allowed to pass into the first type of tube bundles through a central lane (5), and a plurality of formed steam lanes (3,3a,3b) having two side gaps (14), a top gap (15), and a bottom gap (16), and in that the air cooling zone (7) comprising at least of 5-10% total number of said plurality of cooling tubes surrounded by at least two baffle plates (6,6a) to prevent direct entry of the steam into the air cooling zone (7). {FIGURE 1}
Applicants
1
India
BHARAT HEAVY ELECTRICALS LIMITED
with one of its Regional offices at REGION CAL OPERATIONS DIVISION (ROD)
Plot No.9/1, DJ Block 3rd Floor
Karunamoyee, Salt Lake City, Kolkata-700091
having its Registered Office at BHEL HOUSE
SIRI FORT, New Delhi – 110049, INDIA
Inventors
3
India
MACHETTI DAKSHINA MURTYC/o. BHARAT HEAVY ELECTRICALS LIMITED
R&D, VIKAS NAGAR, HYDERABAD-500093 INDIA
India
AMBATI SANDEEPC/o. BHARAT HEAVY ELECTRICALS LIMITED
R&D, VIKAS NAGAR, HYDERABAD-500093 INDIA
India
KONALA LAKSHMA REDDYPlot No.18, Bhavana Colony, Phase III,
Bowenpally, Hyderabad-500011
Specification
Show full textCollapse
CLIAMS:PLEASE FIND THE ATTACHMENT ,TagSPECI:PLEASE FIND THE ATTACHMENT
Orders
Section
Application documents
1
GPA.pdf
16 Dec 2014
2
FOA.pdf
16 Dec 2014
3
F3.pdf
16 Dec 2014
4
F2.pdf
16 Dec 2014
5
DRWNGS.pdf
16 Dec 2014
6
1273-KOL-2014-FORM-18.pdf
27 Mar 2015
7
1273-KOL-2014-FER.pdf
15 Nov 2018
8
1273-KOL-2014-OTHERS [14-05-2019(online)].pdf
14 May 2019
9
1273-KOL-2014-FER_SER_REPLY [14-05-2019(online)].pdf
14 May 2019
10
1273-KOL-2014-DRAWING [14-05-2019(online)].pdf
14 May 2019
11
1273-KOL-2014-COMPLETE SPECIFICATION [14-05-2019(online)].pdf
14 May 2019
12
1273-KOL-2014-US(14)-HearingNotice-(HearingDate-12-09-2022).pdf
10 Aug 2022
13
1273-KOL-2014-FORM-26 [10-09-2022(online)].pdf
10 Sep 2022
14
1273-KOL-2014-Correspondence to notify the Controller [10-09-2022(online)].pdf
10 Sep 2022
15
1273-KOL-2014-Written submissions and relevant documents [27-09-2022(online)].pdf
27 Sep 2022
16
1273-KOL-2014-RELEVANT DOCUMENTS [27-09-2022(online)].pdf
27 Sep 2022
17
1273-KOL-2014-FORM 13 [27-09-2022(online)].pdf
27 Sep 2022
18
1273-KOL-2014-PatentCertificate07-02-2023.pdf
07 Feb 2023
19
1273-KOL-2014-IntimationOfGrant07-02-2023.pdf
07 Feb 2023
Search strategy
1Search_Strategy_1273_KOL_2014_13-06-2018.pdf
ERegister / renewals
Ceased
3rd
Renewed 05 May 2023
Period 08 Dec 2016 – 08 Dec 2017 · CBR 6772 · Certificate 15313
₹4,000
4th
Renewed 05 May 2023
Period 08 Dec 2017 – 08 Dec 2018 · CBR 6772 · Certificate 15314
₹4,000
5th
Renewed 05 May 2023
Period 08 Dec 2018 – 08 Dec 2019 · CBR 6772 · Certificate 15315
₹4,000
6th
Renewed 05 May 2023
Period 08 Dec 2019 – 08 Dec 2020 · CBR 6772 · Certificate 15316
₹4,000
7th
Renewed 05 May 2023
Period 08 Dec 2020 – 08 Dec 2021 · CBR 6772 · Certificate 15317
₹12,000
8th
Renewed 05 May 2023
Period 08 Dec 2021 – 08 Dec 2022 · CBR 6772 · Certificate 15318
₹12,000
9th
Renewed 05 May 2023
Period 08 Dec 2022 – 08 Dec 2023 · CBR 6772 · Certificate 15319
₹12,000
10th
Renewed 05 May 2023
Period 08 Dec 2023 – 08 Dec 2024 · CBR 6772 · Certificate 15320
₹12,000