Abstract

In the present invention a connection control apparatus is provided for each customer the connection control apparatus being provided with a switch for connecting or disconnecting a customer to an electric power grid and the connection control apparatus disconnecting the electric power grid and the customer through use of the switch in accordance with an instruction from a power outage management apparatus or the like during a power outage of the electric power grid and connecting the electric power grid and the customer through use of the switch in accordance with an instruction from the power outage management apparatus or the like when power is restored from the electric power grid. A power supply control apparatus supplies power to electric devices from an energy providing device during a power outage of the electric power grid.

Applicants

1
Japan
NEC CORPORATION 7 1 Shiba 5 chome Minato ku Tokyo 1088001

Inventors

1
Japan
MOTOBAYASHI Toshihikoc/o NEC Corporation 7 1 Shiba 5 chome Minato ku Tokyo 1088001

Specification

Show full textCollapse

DESCRIPTION POWER CONNECTION CONTROL SYSTEM AND METHOD 5 TECHNICAL FIELD

OOOl

The present invention relates to a power connectio~cl ontrol system and a method including energy provision equipment that can supply electric power to loads. 10 BACKGROUND ART

[0002] In recent years, the global warnling problem has become noticeable; awareness about the environment on the part of nations, corporations and consumers has grown; and there has been an increasing trend to reduce the emission of global warming gas (COz) that accompanies the 15 consumption of energy. Therefore, renewable power sources, such as solar power generation (photovoltaic generation) and wind power generation (a wind farm), which do not generate global warming gas emissions, and which have limited adverse effects 011 the environment, and which generate power using natural energy, are attracting attention.

[0003] 2 0 The amount of power generation in a renewable power source varies depending on the weather. Therefore a renewable power source is ordinarily operated by being linked to an electric power (distribution) system so that the quality of power supplied to a consumer is maintained. In that case, surplus power generated by the renewable power source and not consumed by the consumer is provided to the electric power system (reverse power flow) 25 through a power line (transmission line). However, in a case where the consumer has such a contract with the electric power company that manages the electric power system such that there will not be any reverse power flow, the renewable power source is disconnected from the electric power system when surplus power is produced in the renewable power source. In some cases, a renewable power source is used with a storage battery to limit wasteful discarding of generated 30 surplus electric power and to stabilize the amount of electric power supplied to a consumer. A consumer is a unit such as a house, a corporation, a building or a factory connected to an electric power system, which may also be an individual, a juridical person, a group, or the like who has a power-demand-supply contract with an consumption-supply contract with an electric power company. "Consumer" referred to in the following denotes both a unit such as the abovementioned house, corporatio~ib, uilding or factory connected to an electric power system and an individual, a juridical person, a group, or the like who manages the house, corporation, building or factory, or denotes one from among the unit atid the person or group managing the unit.

[0004] 5 When supply of electric power from the electric power system to the consumer is stopped by an accident or tlie like (in a power outage), there is a need to stop the operation of tlie renewable power source operated by being linked to the electric power system or to disconnect the renewable power source from the electric power system in order to prevent the abovedescribed reverse power flow. This is because if a reverse power flow fiom the renewable 10 power source exists, voltage is generated in the power distribution line even during power outage to cause difficulty in ascertaining the cause of the occurrence of the power outage, and because the risk of an electric shock accident, a malfunction of electric facilities, or the like is increased due to access to the electric power system after recognition of the power outage.

OOOS

15 On the other hand, it is desirable for the consumer to be able to use, just during the power outage, electric power generated by the renewable power source held by the consumer or electric power accumulated in a storage battery. Therefore a power conditioner that enables the renewable power source to be connected to the electric power system ordinarily has a function to disconnect the renewable power source from the electric power system (e.g., a circuit breaker). 20 When the renewable power source is not connected to the electric power system, electric power can be supplied from an emergency receptacle provided on the power conditioner to a load by activating an autonomous operation function.

[0006] Patent Literatures 1 and 2, for example, describe configurations for supplying, during a 2 5 power outage, electric power generated by a generator for private power generation or a gas cogeneration system to loads (electrical appliances) provided on the consumer side, each of which includes no renewable power source used in generation facilities.

[0007] Patent Literature I describes receiving online an expected restoration time from an 30 electric power company in a power outage, and selecting loads (electrical appliances) to which electric power is to be supplied from a generator for private power generation according to whether the time taken to complete power restoration from the outage is short or long.

OOOS

Patent Literature 2 describes accepting, upon the occurrence of a power outage, a predicted outage ti~iiep eriod and predicted power demand fluctuation values with respect to loads, input by an operator, controlling the anlount of power generation in a gas cogeneration system and the amount of electricity accutnulated in a storage battery and the amount of discharge from the storage battery based on the predicted time and the predicted values, and 5 selecting loads to which electric power is to be supplied.

[0009] As described above, when supply of electric power from the electric power system to the consumer is stopped (in a power outage), there is a need to stop operation of the renewable power source that is operated by being linked to the electric power system or to disconnect the 10 renewable power source from the electric power system to prevent a reverse power flow.

OO lo

Therefore, the power conditioner is ordinarily provided with a circuit breaker or the like for disconnecting the renewable power source from the electric power system when a power outage is detected. When the renewable power source is not connected to the electric power 15 system, electric power can be supplied from the emergency receptacle to loads.

OOll

In ordinary cases, selection of the autonomous operation function is not automatically made when a power outage occurs, and there is a need for the consumer to activate the autonomous operation function. Also when the linking operation is performed by again linking 2 0 the renewable power source to the electric power system at the time of power restoration from the outage, there is also a need for the consumer to stop the autonomous operation function and to link the renewable power source to the electric power system. Thus, there is a problem that the operation to change the operating mode of the renewable power source is burdensome. 2 5 RELATED ART LlTERATURE PATENT LITERATURE

[0012] Patent Literature 1: Japanese Patent Laid-Open No. 2003-092844 Patent Literature 2: Japanese Patent Laid-Open No. 2008-01 1612 30 SUMMARY

[0013] An object of the present invention is to provide a power connection control system and method to facilitate switching of the autononlous operation function with the energy provision equipment that a consumer owns when a power outage occurs in the electric power system.

[0014] A power connection control system for achieving the above-described object according to an exemplary aspect of the present invention is a power connection control system provided with 5 energy provision equipment to be linked to an electric power system, the energy provision equipment that can supply electric power to electrical appliances that a consumer owns, the power connection control system including: a connection control apparatus that includes an opening/closing device capable of connecting or disconnecting the electric power system and the consumer, and that, when a power 10 outage occurs in the electric power system, disconnects the electric power system and the consumer from each other by the openinglclosing device at a command received from the outside; and a power supply control apparatus that, when the power outage occurs in the electric power system, supplies electric power from the energy provision equipment to the electrical appliances. 15 [0015] Alternatively, the power connection control system according to an exemplary aspect of the present invention is a power connection control system provided with energy provision equipment to be linked to an electric power system, the energy provision equipment that can supply electric power to electrical appliances that a consumer owns, the power connection 2 0 control system including: an outage management apparatus that, when a power outage occurs in the electric power system, transmits a parallel-off command to disconnect the electric power system and the consumer from each other and, at the time of power restoration from the power outage, transmits a linkage command for linking the electric power system and the consumer to each other; 2 5 a connection control apparatus that includes an openinglclosing device capable of connecting or disconnecting the electric power system and the consumer, and that, when the power outage occurs in the electric power system, disconnects the electric power system and the consumer from each other by the opening/closing device at the parallel-off command from the outage management apparatus; and 3 0 a power supply control apparatus that, when the power outage occurs in the electric power system, supplies electric power from the energy provision equipment to the electrical appliances.

[0016] On the other hand, a power connection control method according to an exempla~ya spect of the present invention is a power connection control method for disconnecting, from an electric power system, energy provision equipment that can supply electric power to electrical appliances that a consumer owns, the method including: providing an openinglclosing device that connects or disconnects the electric power system and the consumer; 5 a control apparatus disconnecting, when a power outage occurs in the electric power system, the electric power system and the consumer from each other by the openinglclosi~tg device at a command received from the outside; and a first computer supplying electric power from the energy provision equipment to the electrical appliances during the power outage in the electric power system. 10 BRIEF DESCRIPTION OF DRAWINGS [OO 171 [Figure 11 Figure 1 is a block diagram showing an example of a configuration of a power connection 15 control system according to the present invention. [Figure 21 Figure 2 is a block diagram showing an example of a configuration of a consumer shown in Figure 1. [Figure 31 20 Figure 3 is a block diagram showing an example of a configuration of a connectiou control apparatus shown in Figures 1 and 2. [Figure 41 Figure 4 is a block diagram showing an example of a configuration of a power supply control apparatus shown in Figures 1 and 2. 25 [Figure 51 Figure 5 is a block diagram showing an example of a configuration of an information processor for realizing the power supply control apparatus shown in Figures 1 and 2. [Figure 61 Figure 6 is a block diagram showing an example of a configuration of an outage 3 0 management apparatus shown in Figure 1. [Figure 71 Figure 7 is a flowchart showing an example of a sequence of process steps in the power supply control apparatus shown in Figures 1 and 2. EXEMPLARY EMBODIMENT

[0018] The present invention will be described with reference to the drawings.

[0019] 5 Figure 1 is a block diagram showing an example of a configuration of a power connection control system of the present invention. Figure 2 is a block diagram showing an example of a configuration of a consumer shown in Figure 1. Figure 2 is a diagram showing the configuration of consumer 2 by extracted from the power connection control system shown in Figure 1. 10 [0020] As shown in Figure 1, in the power connection control system of the present invention, consumer 2 provided with energy provision equipment that can supply electric power to loads (electrical appliances) is connected to outage management apparatus (second computer) 1 that manages an electric power system when a power outage occurs, and that is provided in an 15 electric power company. While Figure 1 shows an example in which one consumer 2 is connected to the electric power system and outage management apparatus 1, a plurality of consumers 2 are connected to the electric power system and outage management apparatus 1 in actuality.

[0021] 20 As shown in Figures 1 and 2, consumer 2 has connection control apparatus 21, power supply control apparatus (first computer) 22, energy provision equipment 23 and one or a plurality of electrical appliances (loads) 24. Energy provision equipment 23 and electrical appliances 24 are ordinarily connected to power wiring in the consumer 2 through a distribution panel not illustrated. The distribution panel includes a well-known earth leakage circuit breaker 2 5 and a molded-case circuit breaker and distributes electric power supplied from the electric power system or energy provision equipment 23 to electrical appliances 24 provided in the consumer's house or building. Consumer 2 may be capable of communicating various sorts of information to and from a seiver apparatus or the like managed, for example, by the electric power company though connection control apparatus 21, as shown in Figure 2. The apparatus connected to 30 connection control apparatus 21 is not limited to outage management apparatus 1 shown in Figure 1. While Figures 1 and 2 show a configuration example in which energy provision equipment 23 is provided outside consumer 2 (outside the house or building) and in which all electrical appliances 24 are provided in consumer 2 (in the house or building), energy provision equipment 23 may be provided in consumer 2 and some of electrical appliances 24 tnay be provided outside consumer 2.

[0022] Electrical appliances 24 are any of various appliances that consumer 2 owns consuming electric power, including home appliances such as an electric light, an air conditioner, a 5 television receiver, a refrigerator, a washing machine, a microwave oven, a rice cooker and a cleaner, office appliances such as a copying machine, a facsimile transmitter and a computer, and factory appliances such as machine tools and manufacturing machines.

[0023] On each of electrical appliances 24 in the present exemplary embodiment, power 10 detection means for measuring the power consumption of the appliance and information comnlunication means for transmitting measured values from the power detection means to power supply control apparatus 22, for example, are mounted. As power detection means, a well-known electronic-type electric-power sensor with a current transformer and a voltage transformer, for example, can be used. As information communication means, Zigbee 15 (trademark), WiFi (Wireless Fidelity), UWB (Ultra Wide Band), Bluetooth (trademark) or the like, for example, may be used in the case of using wireless communication, and Ethernet (trademark), PLC or the like may be used in the case of using wired communication. The power consumption of electrical appliances 24 may be measured, for example, with respect to each of receptacles or each molded-case circuit breaker instead of being measured with respect 2 0 to each electrical appliance 24. In such a case, power detection means and information communication means may be provided that correspond to each receptacle or molded-case circuit breaker instead of being mounted on each electrical appliance 24. In a case where some of electrical appliances 24 are each an appliance called a smart home appliance, the appliance called a smart home appliance is ordinarily provided with power detection means and 2 5 information communication means. In such a case, the power consumption of each smart home appliance may be transmitted from the smart home appliance at the request of power supply control apparatus 22 or periodically at predetermined intervals. For the power consumption of each electrical appliance 24, the rated power consumption of electrical appliance 24 may be used. The power detection means and the information communication means may be provided 30 according to need. It is not necessarily required that the power detection means and the information communication means be provided on all electrical appliances 24 that consumer 2 owns.

[0024] Energy provision equipment 23 is a renewable power source such as a well-known solar power generator or a wind power generator, a storage battery, or the like. Energy provision equipment 23 is not limited to a renewable power source or a storage battery. As energy provision equipment 23, a well-known distributed power source such as a fuel cell, a generator using fossil energy or a cogeneration system may be used. 5 [0025] Energy provision equipment 23 is connected to the above-mentioned distribution panel through a generally well-known power conditioner (not illustrated) to be linked to the power wiring in consumer 2. The power conditioner is a device that enables linkage of electric power generated in the renewable power source or the distributed power source to the electric power 10 system, and that controls the amount of power generation in the renewable power source or in the distributed power source as required; If energy provision equipment 23 is a storage battery, the power conditioner has a function to control charge and discharge of the storage battery. The power conditioner may only be connected to energy provision equipment 23 and may be provided in or outside of energy provision equipment 23. 15 [0026] Energy provision equipment 23 in the present exemplary embodiment includes power measuring means for measuring the amount of output of electric power and information communication means for transmitting the measured value from the power lneasuring means to power supply control apparatus 22 and for communicating various sorts of information 2 0 (including command signals or the like) to and from power supply control apparatus 22. The value of the amount of output of electric power from energy provision equipment 23 measured by the power measuring means is transmitted to power supply control apparatus 22. The infolmation communication means transmits the measured value from the power measuring means to power supply control apparatus 22 at a command from power supply control apparatus 2 5 22 or periodically at predetermined intervals. The power measuring means and the information communication means may be provided in energy provision equipment 23 or, for example, in the above-described power conditioner. As power measuring means, a well-known electronic-type electric-power sensor with a current transformer and a voltage transformer, for example, may be used. As information communication means, Zigbee (trademark), WiFi (Wireless Fidelity), 30 UWB (Ultra Wide Band), Bluetooth (trademark) or the like, for example, may be used in the case of using wireless communication, and Ethernet (trademark), PLC (Power Line Communication) or the like may be used in the case of using wired communication. While Figures 1 and 2 show the configuration example in which consumer 2 is provided with one unit of energy provision equipment 23, consumer 2 may be provided with a plurality of units of energy provision equipment 23. The power measuring means and the information communication means may be provided according to need. It is not ilecessarily required that the power measuring means and the infollnation communication means be provided on all units of energy provision equipnlent 23 of consumer 2. 5 [0027] As shown in Figure 3, connection co~ltroal pparatus 21 shown in Figures 1 and 2 includes opening/closing device 21 1 inserted between an incoming line from the electric power system and the above-described distribution panel, control device 212 that controls the operation of opening/closing device 21 1, and communication device 213 for communicating information to 10 and from outage management apparatus 1 and power supply control apparatus 22 through a communication line. A watt-hour meter (not illustrated) for measuring the amount of electric power supplied from the electric power system to consumer 2 is ordinarily provided at a connection ilode between the electric power system and consumer 2. As watt-hour meter, a well-known smart meter, for example, is used. In the case of using a smart meter as watt-Itour 15 meter, the watt-hour meter is connected tlvough a communication line to a well-known MDNS (Meter Data Management System) that manages electricity rates or the like with respect to each consumer, and the watt-hour meter notifies the MDMS of the amount of electric power measured periodically at predetermined intervals.

[0028] 20 Control device 212 in connection control apparatus 21 can be realized as a well-known LSI or the like including a drive circuit for controlling the operations of a memoly and opening/closing device 21 1, for example. As communication device 213, a device in accordance with a well-known communication protocol using the Internet or a privately used line may be used. 25 [0029] Connection control apparatus 21 shown in Figure 3 can be realized as a well-known transfer-trip-relay receiver, for example. In a case where the above-described watt-hour meter includes an opening/closing device and control means for controlling the opening/closing device, ftinctions of connection control apparatus 21 can be realized by means of the watt-hour meter. 30 [0030] While Figure 1 shows a configuration example in which connection control apparatus 21 is connected to outage management apparatus 1 through a privately used line, connection control apparatus 21 and outage management apparatus 1 may transmit and receive information by using well-known wireless communication means. If well-known PLC is used for communication between connection control apparatus 21 and outage management apparatus 1, there is no need for any comn~unicationl ine. [003 I] Control device 212 in connection control apparatus 21 sets openinglclosing device 21 1 to 5 "closed" (short) at a command from outage management apparatus 1 when power transmission is performed, and sets openinglclosing device 21 1 to "open" (disconnection) when a power outage occurs in the electric power system. When openinglclosing device 21 1 is "closed" (short), consumer 2 is connected to the electric power system. When opening/closing device 21 1 is "open" (disconnection), consumer 2 is disconnected from the electric power system. At the 10 time of restoration from a power outage, however, when control device 212 is notified of "outage restoration" from outage management apparatus 1, it transfers "outage restoration" to power supply control apparatus 22 while maintaining openinglclosing device 21 1 in the "open" state. Thereafter, when control device 212 receives from outage management apparatus 1 a "linkage command", which is a command to establish linkage to the electric power system, it changes the 15 openinglclosing device 21 1 to "closed".

[0032] If, at the time of restoration from a power outage, a number of units of energy provision equipment 23, such as renewable power sources, are simultaneously linked to the electric power system, the quality of distributed electric power is reduced due to reverse power flows from the 2 0 units of energy provision equipment 23 and there is a possibility of the system being, at worst, again driven into a power outage. In the arrangement in which, as described above, connection control apparatus 21 changes openinglclosing device 21 1 to "closed" at the stage at which a "linkage command" is notified from outage management apparatus 1 managed by an electric power company or the like, timings of linkages of the units of energy provision equipment 23 25 held by the consumers to the electric power system can be controlled by outage management apparatus 1. That is, if outage management apparatus 1 performs control so that the units of energy provision equipment 23 are not simultaneously linked to the electric power system, degradation of the quality of distributed electric power due to reverse power flows from the units of energy provision equipment 23 at the time of restoration from a power outage can be limited. 30 [0033] As shown in Figure 4, power supply control apparatus 22 includes processing section 221, storage section 222 and communication section 223.

[0034] Storage section 222 holds information on the amount of electric power that can be output from energy provision equipment 23, the power consumption of each electrical appliance 24 and "the degree of importance" set for each electrical appliance 24 as described below.

[0035] Communication section 223 enables communication of information to or from connection 5 control apparatus 21, energy provision equipment 23 and electrical appliances 24. Communication section 223 may use, for example, Zigbee (trademark), WiFi (Wireless Fidelity), UWB (Ultra Wide Band), Bluetooth (trademark) or the like in the case of performing wireless communication of infonnation, and may use Ethelnet (trademark), PLC or the like in the case of performing wired communication of information. 10 [0036] Processing section 221 manages supply of electric power from energy provision equipment 23 that consumer 2 owns to electrical appliances 24. For example, when consumer 2 is disconnected from the electric power system by connection control apparatus 21 at a command from outage management apparatus 1, processing section 221 makes energy provision equipment 15 23 enter an autonomous operation mode to supply electric power to electrical appliances 24. When "outage restoration" is notified from outage management apparatus 1 through connection control apparatus 21, processing section 221 stops the operation with energy provision equipment 23 in the autonomous operation mode and establishes linkage to the electric power system. 20 [0037] Processing section 221 also performs powering ordoff of each electrical appliance 24. Powering onloff of electrical appliances 24 may be controlled with respect to each electrical appliance 24 or may be controlled with respect to each receptacle, earth leakage circuit breaker or molded-case circuit breaker. For powering odoff of each electrical appliance 24, if 2 5 electrical appliance 24 has a function to permit control from the outside, such a function may be used. If electrical appliance 24 has no such function, it may be controlled by providing an opening/closing switch on the power supply line. It is not necessary that processing section 221 perfom powering ordoff of all electrical appliances 24 that consumer 2 owns. Some of electrical appliances 24 may be exempted from the objects to he controlled. 30 [0038] When a power outage occurs in the electric power system, processing section 221 obtains the value of the amount of electric power providable from energy provision equipment 23, such as a predicted amount of electric power that will be generated from a renewable power source or an amount of electricity stored in a storage battery, and also obtains the power consumption of electrical appliances 24. Then, based on tlie amount of electric power providable from energy provision equipment 23, the power consumption of electrical appliances 24 and on the degree of impoltance set for electrical appliances 24 in advance, processing section 221 starts supply of electric power from energy provision equipment 23 to electrical appliances 24 that has a higher 5 degree of importance within a range in which electric power can be provided from energy provision equipment 23.

[0039] When processing section 221 receives a "predicted outage time period" from outage management apparatus 1 through connection control apparatus 21, it maintains supply of electric 10 power to electrical appliances 24 that has a higher degree of importance and that is operable according to the predicted outage time period, and stops supply of electric power to the other electrical appliances 24. A predicted amount of power generation, for example, with respect to a solar power generation unit, may be computed by considering the relationship between atmospheric phenomena data on a regional basis and the expected amount of power generation, 15 provided from the manufacturer of the solar power generation unit, a loss due to installation conditions or the like, and other factors. If a public institution, a company or the like that provides a predicted amount of power generation exists, the predicted amount of power generation may be obtained from the institution, company or the like through a communication line in tlie Internet or tlie like. The arrangement may alternatively be such that a database is 20 prepared by obtaining and storing the value of the amount of power generation from the renewable power source periodically at predetermined intervals through power supply control apparatus 22, and a predicted amount of power generation is determined based on the database. In such a case, an amount of power generation in a past time period matching or close to the weather condition in the predicted outage time period may be set as a predicted amount of power 25 generation. An amount of electricity stored in a storage battery may be obtained from the power conditioner that controls charge and discharge of the storage battery. A predicted amount of power generation or an amount of stored electricity may be obtained when a predicted outage time period is received or may be periodically obtained and stored (updated) at intervals set in advance. 30 [0040] Further, when processing section 221 in power supply control apparatus 22 receives "outage restoration" from outage management apparatus 1 through connection control apparatus 21 and stops the autonomous operation with energy provision equipment 23, it notifies outage management apparatus 1 of "linkage ready" through connection control apparatus 21, and notifies outage management apparatus 1 of "linkage operation time" indicating the time period from reeeiviug the above-mentioned "linkage conln~and"to actually ellabling linkage of energy provision equipnlent 23 to the electric power system and "predicted amount of reverse power flow" indicating the amount of electric power of a reverse power flow to the electric power 5 system that is expected to be caused at the time of linkage. [004 11 The linkage operation time is a time period required for processing (including frequency adjustment and phase adjustment) from connecting energy provision equipment 23 to the electric power system to enabling the linked operation of energy provision equipment 23. The linkage 10 operation time may be set in advance, for example, according to the characteristics of energy provision equipment 23 and the power conditioner. As the predicted amount of reverse power flow, a surplus amount of electric power (predicted value) computed from the predicted amount of power generated from the renewable power source at the time of linkage and a predicted total power consumption of electrical appliances 24 at the time of linkage may be used. 15 [0042] In this ease, when outage management apparatus 1 receives the "linkage operation time" and "predicted amount of reverse power flow" through connection control apparatus 21, it schedules a time to establish linkage to the electric power system for each eonsumner based on the "linkage operation time" and "predicted amount of reverse power flow" and transmits "linkage 2 0 command" to connection control apparatus 21 of consumer 2 according to the scheduled time. At this time, outage management apparatus 1 may schedule the time in the linkage command to be transmitted to connection control apparatus 21 in each consurner 2 so that the adjustment load on the electric power system is minimized, for example, the amount of adjustment of power generation by an adjusting power source (a thermal power plant or the like) necessary for 25 stabilizing the distributed voltage and the distributed frequency is minimized.

[0043] Power suppiy control apparatus 22 shown in Figure 4 can be realized, for example, by means of an infolmation processor (computer) shown in Figure 5. Figure 5 is a block diagram showing an example of a configuration of an iuformation processor for realizing the power 3 0 supply control apparatus shown in Figures 1 and 2.

[0044] The information processor shown in Figure 5 includes processing device 100 that executes predetermined processing in accordance with a program, input device 200 for inputting commands, information and the like to processing device 100, and output device 300 for outputting the results of processing in processing device 100. [DO451 Input device 200 is, for example, a keyboard or a pointing device such as a mouse, a touch pad or a touch panel. 5 [0046] Output device 300 includes a display device such as a liquid crystal display and a printing device such as a printing machine. 100471 Processing device 100 includes CPU 110, main storage device 120 that temporarily holds 10 information necessary for processing in CPU 110, recording medium 130 on which a program for making CPU 110 execute the processing according to the present invention is recorded, data accumulation device 140 that stores information, for example, on the amount of electric power providable from energy provision equipment 23, the power consumptions of electrical appliances 24 and "the degrees of importance" of electrical appliances 24, memory control interface section 15 150 that controls data transfer with respect to main storage device 120, recording medium 130 and data accumulation device 140, VO interface section 160, which is a device for interfacing with input device 200 and output device 300, and communication control device 170 for communication of information to or from connection control apparatus 21 and electrical appliances 24 through the communication line. These components are connected through a bus 20 180.

[0048] Processing device 100 executes processing in accordance with the program recorded on recording medium 130 to realize a power connection control method described in the description of the present exemplary embodiment. Recording medium 130 may be a magnetic disk, a 25 semiconductor memory, an optical disk or any other recording medium. It is not necessary to provide data accumulation device 140 in processing device 100. Data accumulation device 140 may be an independent device. Functions of processing section 221 shown in Figure 4 are realized by means of processing device 100 shown in Figure 5; functions of storage section 222 shown in Figure 4 are realized by means of data accumulation device 140; and functions of 30 communication section 223 shown in Figure 4 are realized by means of communication control device 170.

[0049] As shown in Figure 6, outage management apparatus 1 includes processing section 11, storage section 12 and communication section 13.

OOSO

To outage management apparatus 1, a distribution automation system (not illustrated) that controls, for example, the operation of the electric power system is connected tluough a communication line. When a power outage in the electric power system occurs, "outage section 5 information" indicating a distribution section where the power outage is occul~inga nd "system consumer accommodation information" indicating consumers 2 accommodated in the electric power system are provided from the distribution automation system through comtnunication section 13. "Outage section inforu~ation"a nd "system consumer accom~nodationin formation" provided from the distribution automation system are stored in storage section 12. The 10 distribution automation system is described, for example, in "Internet electric power lecture for university students", 4. Power distribution techniques, Distribution automation system (Internet URL: http://www.tepco.co.jp/kouza~haiden/haiden-j.html).

OOSl

When a power outage occurs in the electric power system, processing section 11 in outage 15 management apparatus 1 obtains the cusrent "outage section infolmation" from the abovedescribed distribution automation system, extracts consumers 2 accommodated in the outage section based on "system consumer accommodation information" provided from the distribution automation system, and transmits "parallel-off command" to connection control apparatus 21 for extracted consumers 2 through communication section 13 to make connection control apparatus 20 21 perform disconnection (paralleling off) from the electric power system. At this time, processing section 1 1 transmits information on an expected outage time period (predicted outage time period) to power supply control apparatus 22 through connection control apparatus 21. As predicted outage time period at this stage, a value from past actual restoration time periods corresponding to details of accidents prepared as a database by the electric power company, for 25 example, may be used. Outage management apparatus 1 is arranged so that a predicted outage time period corresponding to the last restored state can be input to outage management apparatus 1 by the operator of outage management apparatus 1. When the predicted outage time period is updated by the operator, processing section 11 in outage management apparatus 1 transmits this predicted outage time period to connection control apparatuses 21 that consumer 2 owns in the 30 outage section.

[0052] When the electric power system is restored from the power outage that has occurred in the electric power system, processing section 11 in outage management apparatus 1 notifies connection control apparatuses 21 for consutllers 2, to which the above-mentioned "parallel-off comn~and"h as been transnlitted, of "outage restoration" indicating restoration from the outage, and thereafter transmits "linkage command" to establish linkage to the electric power system.

[0053] Outage management apparatus 1 can be realized, for example, by means of the 5 information processor (computer) shown in Figure 5, as in the case of power supply control apparatus 22. In a case where outage management apparatus 1 is realized by means of the infortnation processor, functions of processing section 11 shown in Figure 6 are realized by means of processing device 100 shown in Figure 5; functions of storage section 12 shown in Figure 6 are realized by means of data accumulation device 140; and functions of 10 comlnnnication section 13 shown in Figure 6 are realized by means of communication control device 170. For input of a predicted outage tinle period by the operator of outage management apparatus 1, input device 200 shown in Figure 5 may be used.

[0054] In this arrangement, information on the degrees of importance of electrical appliances 24 15 set by consumer 2 in advance is stored in power supply control apparatus 22. The degree of importance is set in a plurality of steps. The highest degree of importance may be set, for exanlple, for a security system, disaster prevention equipment such as emergency lights, firefighting facilities, or the like. Other degrees of importance may be attached to electrical appliances 24 in order of decreasing priority with which consumer 2 wants to operate in the 20 event of a power outage. Electrical appliances 24 to which the highest degree of importance is attached are assumed to include the above-described power supply control apparatus 22, connection control apparatus 21, and the power conditioner provided on energy provision equipment 23. It is not necessarily required that the degree of importance be attached to each electrical appliance 24. For example, the degree of importance may be set with respect to each 25 receptacle or with respect to each earth leakage circuit breaker or molded-case circuit breaker, or may be set with respect to each of predetermined areas including a plurality of loads (electrical appliances) or each of predetermined places. For example, in a case where consumer 2 is formed of comlnercial facilities or hotel facilities having a plurality of floors, a higher degree of importance may be set for lights in an emergency stair case, emergency lights on common 30 passageways on the floors, or the like.

[0055] Power supply control apparatus 22 is assumed to collect, by predetermined timing or periodically, the values of the power consumptions of electrical appliances 24 and the amount of electric power providable from energy provision equipment 23, and store the collected values in storage section 222.

[0056] Figure 7 is a flowchart showing an example of a sequence of process steps in the power supply control apparatus shown in Figures 1 and 2. 5 [0057] Figure 7 shows an example of setting degrees of importance in which three degrees of importance: the highest degree of importance [A], the next degree of impo~tance[ B] and the lowest degree of importance [C] are set for electrical appliances 24 in advance. The number of degrees of importance attached to electrical appliances 24 is not limited to three. Any number 10 of degrees of importance, not smaller than two, may be set. Processing in power supply control apparatus 22 described below is executed in processing section 221 shown in Figure 4.

[0058] As described above, when a power outage occurs in the electric power system, connection control apparatus 21 sets opening/closing device 21 1 to "open" at "parallel-off command" from 15 outage management apparatus 1, for example. Connection control apparatus 21 also notifies power supply control apparatus 22 of the parallel-off state from the electric power system and transfers a "predicted outage time period" received from outage management apparatus 1 to power supply control apparatus 22. When connection control apparatus 21 receives an updated "predicted outage time period" from outage management apparatus 1 during the power outage, it 20 transfers the "predicted outage time period" to power supply control apparatus 22.

[0059] On the other hand, when connection control apparatus 21 is notified of "outage restoration" from outage management apparatus 1 at the time of restoration from the power outage, it transfers "outage restoration" to power supply control apparatus 22 while maintaining 2 5 opening/closing device 21 1 in the "open" state. Thereafter, when "linkage command" is transmitted from outage management apparatus 1, connection control apparatus 21 sets opening/closing device 211 to "closed" and notifies power supply control apparatus 22 of linkage to the electric power systeni.

[0060] 30 As shown in Figure 7, power supply control apparatus 22 determines whether or not the parallel-off command has been notified from connection control apparatus 21 (step Sl), and repeats processing in step S1 if the parallel-off command has not been notified. When the parallel-off command is notified from the electric power system (e.g., outage management apparatus l), power supply control apparatus 22 changes energy provision equipment 23 into the autonomous operation mode (step S2).

[0061] When energy provision equipment 23 is in the autonomous operation mode, power supply control apparatus 22 first determines whether or not the outage restoration has been notified (step 5 S3). When the outage restoration is notified, the process proceeds to processing in step S 12.

[0062] If the outage restoration has not been notified, power supply control apparatus 22 determines whether or not a predicted outage time period or an updated predicted outage time period has been notified (step S4). If no predicted outage time period or updated predicted 10 outage time period has been notified, processing from step S3 is repeated.

[0063] If a predicted outage time period or an updated predicted outage time period has been notified, power supply control apparatus 22 obtains information on the amount of electric power providable from energy provision equipment 23 in the predicted outage time period, e.g., a 15 predicted amount of power generation from the renewable power source or an amount of electricity stored in the storage battery (step S5).

[0064] Next, power supply control apparatus 22 compares the amount of electric power providable from energy provision equipment 23 in the predicted outage time period and the total 2 0 amount of electric power to be consumed by the load or loads (electrical appliances 24) with the degree of importance [A] in the predicted outage time period to determine whether or not electrical appliances 24 with the degree of importance [A] can be operated within the predicted outage time period (step S6). If electrical appliances 24 with the degree of importance [A] can be operated, electric power is supplied to the same electrical appliances (step S7), and the 2 5 process proceeds to processing in step S8.

[0065] If electrical appliances 24 with the degree of importance [A] cannot be operated, power supply control apparatus 22 repeats processing from step S3 without executing supply of electric power from energy provision equipment 23 to electrical appliances 24 with the degree of 30 importance [A]. Even in the case where electrical appliances 24 with the degree of importance [A] cannot be operated through the predicted outage time period, they may be operated within a time period in which electric power can be supplied from energy provision equipment 23.

[0066] In step S8, power supply control apparatus 22 compares the amount of electric power providable from energy provision equipment 23 in the predicted outage time period and the total amount of electric power to be consuined by electrical appliances 24 with the degrees of impo~tance[A ] and [B] in the predicted outage time period to determine whether or not electrical appliances 24 with the degrees of importance [A] and [B] can be operated within the predicted 5 outage time period. If electrical appliances 24 with the degrees of importance [A] and [B] can be operated, electric power is supplied to the same electrical appliances (step S9), and the process proceeds to processing in step S10.

[0067] If electrical appliances 24 with the degrees of importance [A] and [B] cannot be operated, 10 power supply control apparatus 22 repeats processing fro111 step S3 without executing supply of electric power from energy provision equipment 23 to electrical appliances 24 with the degree of impoi-tance [B].

[0068] In step S10, power supply control apparatus 22 compares the amount of electric power 15 providable from energy provision equipment 23 in the predicted outage time period and the total amount of electric power to be consumed by electrical appliances 24 with the degrees of impoltance [A], [B], and [C] in the predicted outage time period to determine whether or not electrical appliances 24 with the degrees of importance [A], [B], and [C] can be operated within the predicted outage time period. If electrical appliances 24 with the degrees of importance [A], 20 [B], and [C] can be operated, electric power is snpplied to the same electrical appliances (step S1 I), and the process proceeds to processing in step S3.

[0069] If electrical appliances 24 with the degrees of importance [A], [B], and [C] cannot be operated, power supply control apparatus 22 repeats processing from step S3 without executing 25 supply of electric power from energy provision equipment 23 to electrical appliances 24 with the degree of impo~tance[C ].

[0070] When, in step S4, power supply control apparatus 22 receives an updated predicted outage time period from connection control apparatus 21, repeats processing in the above- 30 described steps S5 to S11 to execute supply of electric power to electrical appliances 24 having higher degrees of importance operable within the predicted outage time period on the basis of the amount of electric power providable from energy provision equipment 23 at the current point in time.

[0071] When, in step S3, "outage restoration" is notified from outage management apparatus 1 through connection control apparatus 21, power supply control apparatus 22 stops energy provision equipment 23 in the a~ttonomouso peration mode, notifies outage management apparatus 1 of "linkage ready" through connection control apparatus 21, and notifies outage 5 management apparatus 1 of "linkage operation time" indicating the time period from receiving the above-mentioned "linkage command" to actually enabling linkage of energy provisio~l equipment 23 to the electric power system and "predicted amount of reverse power flow" indicating the amount of electric power of a reverse power flow to the electric power system that is expected to be caused at the time of linkage (step S12). 10 [0072] Thereafter, when "linkage command" is notified from outage management apparatus 1, power supply control apparatus 22 enters a linked operation mode (step S 13) and thereafter repeats processing from step S 1.

[0073] 15 In the present exemplary embodiment, when a power outage occurs in the electric power system, connection control apparatus 21 sets opening/closing device 21 1 to "open" at the parallel-off command from outage management apparatus 1 to disconnect energy provision equipment 23 from the electric power system. At the time of restoration from the power outage, connection control apparatus 21 sets openinglclosing device 21 1 to "closed" at the linkage 2 0 command from outage management apparatus 1 to link energy provision equipment 23 to the electric power system, thus enabling automatic switching between the autonomous operation and the linked operation of energy provision equipment 23. Thus, the autonomous operation of energy provision equipment 23 in a power outage is enabled while the need for a burdensome switching operation at the time of occurrence of the power outage and at the time of restoration 2 5 from the power outage is eliminated.

[0074] Power supply control apparatus 22 starts tlie autonomous operation of energy provision equipment 23 after disconnection from the electric power system made by connection control apparatus 21 in a power outage in the electric power system. When the electric power system is 30 restored from the power outage, power supply control apparatus 22 links energy provision equipment 23 to the electric power system after establishing connection with the electric power system, so that no adverse influence on the electric power system is caused.

[0075] Thus, adverse influence on the electric power system can be reduced while switching of the autonomous operation function with energy provision equipment 23 performed by consulner 2 at the time of occurrence of a power outage and at the time of restoration fiom the power outage is facilitated.

[0076] 5 Further, outage management apparatus 1 can schedule, at the time of restoration from the power outage, a time for a linkage command to be transmitted to connection control apparatus 21 for each consunler 2 based on a linkage operation time and a predicted amount of reverse power flow transmitted from power supply control apparatus 22 so that the load on the electric power system is minimized, for example, the amount of adjustment of power generation by an adjusting 10 power source (a thermal power plant or the like) necessary for stabilizing the distributed voltage and the distributed frequency is minimized, thus enabling linkage of energy provision equipment 23 for each consumer 2 while reducing the adjustment load on the electric power system. 100771 The present invention has been described by referring to the exemplary embodiment 15 thereof. However, the present invention is not limited to the above-described exemplary embodiment. Various changes and modifications understandable by those skilled in the a ~ctan be made in the configuration and details of the present invention within the scope of the present invention.

[0078] 20 This application is based upon and claims the benefit of priority from the prior Japanese Patent Application No. 201 1-209371, field on September 26,201 1; the entire contents of which are incorporated therein by reference.

CLAIMS 1. A power connection control system provided with energy provision equipment to be linked to an electric power system, the energy provision equipment that can supply electric 5 power to electrical appliances that a consumer owns, the power connection control system comprising: a connection control apparatus that includes an openinglclosing device capable of connecting or disconnecting the electric power system and the consumer, and that, when a power outage occurs in the electric power system, disconnects the electric power system and the 10 consumer from each other by the openinglclosing device at a com~nandre ceived from the outside; and a power supply control apparatus that, when the power outage occurs in the electric power system, supplies electric power from the energy provision equipment to the electrical appliances. 15 2. The power connection control system according to claim 1, wherein when the power outage occurs in the electric power system, said power supply control apparatus obtains an amount of electric power providable from the energy provision equipment and power consumption of the electrical appliances, and supplies electric power from the energy provision equipment to part of the electrical appliances having a higher degree of importance within a 20 range in which electric power can be provided from the energy provision equipment, based on the amount of electric power providable from the energy provision equipment and the power consumption of the electrical appliances obtained and degree of importance set for the electrical appliances in advance. 2 5 3. The power connection control system according to claim 1 or 2, wherein, at the time of restoration from the power outage in the electric power system, said connection control apparatus connects the electric power system and the consumer to each other by the opening/closing device at a command received from the outside. 30 4. The power connection control system according to claim 3, further comprising an outage management apparatus that, when the power outage occurs in the electric power system, transmits to said connection control apparatus a parallel-off command for disconnecting the electric power system and the consumer fionl each other, and transmits a predicted outage time period, which is a predicted value of an outage time period, and that, at the time of restoration fro111 the power outage, transmits to said connection control apparatus a linkage command for linking the electric power system and the consumer to each other, wherein said connection control apparatus disconnects the electric power system and the consumer from each other by the openingiclosing device at the parallel-off command, and 5 connects the electric power system and the consumer to each other by the opening/closing device at the linkage command, and wherein upon receiving the predicted outage time period through said connection control apparatus, said power supply control apparatus determines to which of the electrical appliances the electric power is to be supplied based on the amount of electric power providable from the 10 energy provision equipment in the predicted outage time period, the power consumption of the electrical appliances in the predicted outage time period and the degree of impol-tance of the electrical appliances. 5. The power connection control system according to claim 4, wherein, when the predicted 15 outage time period is updated by an operator, said outage management apparatus transmits the updated predicted outage time period to said connection control apparatus. 6. The power connection control system according to claim 4 or 5, wherein, at the time of restoration from the power outage, when outage restoration is notified from said outage 2 0 management apparatus, said connection control apparatus notifies said power supply control apparatus of the outage restoration while maintaining the opening/closing device in the open state and, when the linkage command is transmitted from said outage management apparatus, closes the openingiclosing device to connect the electric power system and the consumer to each other, 2 5 wherein, when the outage restoration is notified from said connection control apparatus, said power supply control apparatus notifies said outage management apparatus of a linkage operation time representing the time period from receiving the linkage command to actually enabling linkage of the energy provision equipment to the electric power system and a predicted amount of reverse power flow representing the amount of electric power of a reverse power flow 30 to the electric power system expected to be caused at the time of linkage, and wherein said outage management apparatus schedules a time to transmit the linkage command for each consumer based on the linkage operation time and the predicted amount of reverse power flow so that the adjustment load on the electric power system is minimized, and transmits the linkage command to said connection control apparatus according to the scheduled time. 7. A power connection control method for disconnecting, from an electric power system, energy provision equipment that can supply electric power to electrical appliances that a 5 consumer owns, the method comprising: providing an openinglclosing device that connects or disconnects the electric power system and the consumer; a control apparatus disconnecting, when a power outage occurs in the electric power system, the electric power system and the consumer from each other by the opening/closing 10 device at a command received from the outside; and a first computer supplying electric power from the energy provision equipment to the electrical appliances during the power outage in the electric power system. 8. The power connection control niethod according to claim 7, wherein when the power 15 outage occurs in the electric power system, the first computer obtains an amount of electric power providable from the energy provision equipment and power consumption of the electrical appliances, and supplies electric power from the energy provision equipment to part of the electrical appliances with a higher degree of importance within a range in which electric power can be provided from the energy provision equipment, based on the amount of electric power 20 providable from the energy provision equipment and the power consumption of the electrical appliances obtained and degree of importance set for the electrical appliances in advance. 9. The power connection control method according to claim 7 or 8, wherein, at the time of restoration from tlie power outage in the electric power system, the first computer connects the 25 electric power system and the consumer to each other by the opening/closing device at a command received from the outside. 10. The power connection control method according to claim 9, wherein when the power outage occurs in the electric power system, a second computer transmits to a connection control 30 apparatus a parallel-off command for disconnecting the electric power system and the consumer from each other, and transmits a predicted outage time period, which is a predicted value of an outage time period, and, at the time of restoration from the power outage, transmits to the control apparatus a linkage command for linking the electric power system and the consumer to each other, wherein the control apparatus disconnects the electric power system and the consumer from each other by the opening/closing device at the parallel-off command, and connects the electric power system and the consumer to each other by the openinglclosing device at the linkage command, and 5 wherein upon receiving the predicted outage time period through the control apparatus, the first computer determines to which of the electrical appliances the electric power is to be supplied based on the amount of electric power providable from the energy provision equipment in the predicted outage time period, the power consumption of the electrical appliances in the predicted outage time period and the degree of importance of the electrical appliances. 10 11. The power connection control method according to claim 10, wherein, when the predicted outage time period is updated by an operator, the second computer transmits the updated predicted outage time period to the control apparatus. 15 12. The power connection control method according to claim 10 or 11, wherein, at the time of restoration from the power outage, when outage restoration is notified from the second computer, the control apparatus notifies the first computer of the outage restoration while maintaining the opening/closing device in the open state and, when the linkage command is transmitted from the second computer, closes the opening/closing device to connect the electric power system and the 2 0 consumer to each other, wherein, when the outage restoration is notified from the control apparatus, the first computer notifies the second computer of a linkage operation time representing the time period from receiving the linkage command to actually enabling linkage of the energy provision equipment to the electric power system and a predicted amount of reverse power flow 25 representing the amount of electric power of a reverse power flow to the electric power system expected to be caused at the time of linkage, and wherein the second computer schedules a time to transmit the linkage command for each consumer based on the linkage operation time and the predicted amount of reverse power flow so that the adjustment load on the electric power system is minimized, and transmits the linkage 30 command to the control apparatus according to the sclieduled time. 13. A power connection control system provided with energy provision equipment to be linked to an electric power system, the energy provision equipment that can supply electric power to electrical appliances that a consumer owns, the power connection control system comprising: an outage management apparatus that, when a power outage occurs in the electric power system, transmits a parallel-off command to disconnect the electric power system and the consumer from each other and, at the time of restoration from the power outage, transmits a 5 linkage command for linking the electric power system and the consumer to each other; a connection control apparatus that includes an opening/closing device capable of connecting or disconnecting the electric power system and the consumer, and that, when the power outage occurs in the electric power system, disconnects the electric power system and the consumer from each other by the opening/closing device upon receiving the parallel-off 10 command from the outage management apparatus; and a power supply control apparatus that, when the power outage occurs in the electric power system, supplies electric power from the energy provision equipment to the electrical appliances. 14. A power supply control apparatus that supplies electric power from energy provision 15 equipment that can supply electric power to electrical appliances that a consumer owns, the apparatus comprising: a processing section that when a power outage occurs in an electric power system, obtains an amount of electric power providable from the energy provision equipment and power consumption of the electrical appliances, and supplies electric power from the energy provision 20 equipment to part of the electrical appliances with a higher degree of importance within a range in which electric power can be provided from the energy provision equipment, based on the amount of electric power providable fiom the energy provision equipment and the power consumption of the electrical appliances obtained and degree of importance set for the electrical appliances in advance; 25 a storage section that holds the amount of electric power providable from the energy provision equipment, the power consumptions of the electrical appliances and the degrees of importance set for the electrical appliances in advance; and a conlmunication section that communicates information to or from the energy provision equipment and the electrical appliances. 30 15. The power supply control apparatus according to claim 14, wherein upon receiving a predicted outage time period from the outside in a power outage in the electric power system, said processing section determines to which of the electrical appliances the electric power is to be supplied based on the amount of electric power providable from the energy provision equipment in the predicted outage time period, the power consumption of the electrical appliances in the predicted outage time period and the degree of importance of the electrical appliances. 5 16. A connection control apparatus comprising: an opening/closing device that connects or disconnects an electric power system and a consumer; a control device that, when a power outage occurs in the electric power system, disconnects the electric power systenl and the consumer from each other by the openinglclosing 10 device upon receiving a parallel-off command supplied from the outside as a command for disconnecting a consumer accommodated in a power distribution section in which the power outage is occurring; and a communication device that receives the parallel-off command and a linkage command through a predetermined communication line and outputs the commands to said control device. 15 17. The connection control apparatus according to claim 16, wherein, at the time of restoration from the power outage, said control device connects the electric power system and the consumer to each other by the opening/closing device at the linkage command supplied from the outside as a command for linking the consunler to the electric power system. 20 18. An outage management apparatus comprising: a storage section that, when a power outage occurs in an electric power system, holds outage section information provided from the outside and indicating a distribution section where the power outage is occurring, and system consumer accommodation information as information 25 indicating consumers accommodated in the electric power system; a processing section that extracts some of the consumers accommodated in the outage section where the power outage is occurring based on the outage section information and the systenl consumer accommodation information, transmits to the extracted consumer a parallel-off command for disconnecting the consumer in the outage section from the electric power system 30 and a predicted outage time period input by an operator as a predicted value of an outage time period, and transmits to the consumer in the outage section a linkage command for linking the consumer to the electric power system at the time of restoration from the power outage; and a communication section that, under the control of said processing section, receives the outage section information and the system consumer accomnlodation information through a predetemiined cotilniunication line, and transmits the parallel-off colnniand and the linkage command to the consumer accommodated in the distribution section \vliere the power outage is occur-ring. 5 19. The outage management apparaks according to claim 18, wherein when said processing section receives, from the consumer, with respect to a notice of restoration from the power outage, a linkage operation time representing the time period from receiving the linkage command to actually enabling linkage of energy provision equipment that can supply electric power to electrical appliances to the electric power system and a predicted amount of reverse 10 power flow representing the amount of electric power of a reverse power flow to the electric power system expected to be caused at the time of linkage of the energy provision equipment to the electric power system, said processing section schedules a time to transmit the linkage command for each consumer based on the linkage operation time and the predicted amount of reverse power flow so that the adjustmelit load on the electric power system is minimized, and 15 transmits the linkage colntnand to the consumer according to the scheduled time. Dated this 22"' Day of April, 2014