Bharat Heavy Electricals Limited
Granted App No 1855/DEL/2004 Patent 233905 Mechanical Engineering

Patent information

IP India · live record
Application number
1855/DEL/2004
Filing date
27 September 2004
Status
Granted
Legal status
Ceased
Publication number
33/2006
Publication type
INA
Invention field
Mechanical Engineering
Patent number
233905
Grant date
20 April 2009
Next renewal due
27 September 2023Overdue

Abstract

Primarily a non mechanical type sealing system, the water cooled high temperature bulk solid removing system comprises two sub systems, namely a bed ash diverter and ash cooler which removes the bed ash from the gasifier and thereby maintains the bed height in an improved manner and obviates the disadvantages of the prior art.

Applicants

1
India
BHARAT HEAVY ELECTRICALS LIMITED BHEL HOUSE SIRI FORT, NEW DELHI-110049,

Inventors

6
India
KRISHANAN THIRUMALAI CHIEF/CCDPBHEL HOUSE SIRI FORT, NEW DELHI-110049,
India
GOVINDASAMY VISWANATHAN AGM/CCDPBHEL HOUSE SIRI FORT, NEW DELHI-110049,
India
RAJAMANNAR KANNAN SR.MANGER/CCDPBHEL HOUSE SIRI FORT, NEW DELHI-110049,
India
0KRISHANASWAMY ARIVANANDAN DY. MANAGER /CCDPBHEL HOUSE SIRI FORT, NEW DELHI-110049,
India
VENKATACHALAM PERIAKARUPPAN SR. PRODUCT ENGINEER/CCDPBHEL HOUSE SIRI FORT, NEW DELHI-110049,
India
BALASUBRAMANIAN PRASAD MAINTENANCE ENGINEERBHEL HOUSE SIRI FORT, NEW DELHI-110049,

Specification

Show full textCollapse

FIELD OF INVENTION: This invention relates to integrated gasification based power generation; especially pressurized fluidized bed gasification based systems used for any grade of coals. BACKGROUND OF INVENTION Combined Cycle is increasingly being used to generate electricity through integrated gasification. Such combined cycles are capable of using various grades of low calorific value and high ash content coals. In a refractory lined pressurized fluidized bed gasifier the air and steam mixture is introduced through a distributor located at bottom of the gasifier. Coal is continuously injected to the gasifier through ejector using compressed air. Coal gas also called "fuel gas" is produced due to the chemical reaction of coal with air and steam. The fly ash and unburnt carbon particles in fuel gas are separated by the serially arranged cyclones. The coal gas at the exit of the cyclone is cooled in a Heat Recovery Boiler (HRB). The gas is further cooled in the gas cooler while superheating the saturated steam of HRB. Part of the superheated steam is utilized for gasification process and the rest expands in the steam turbine to generate electricity. The gas is further processed in the gas cleaning system and admitted to the gas turbine combustion chamber to generate electricity.

During the gasification process, for a particular load, to maintain the bed height/inventory the bed ash is extracted from the bottom of the gasifier through water cooled high temperature bulk solid removing system. Maintaining the gasifier bed height is vital because it determines the fluidization velocity, better fluidization, better composition of fuel gas with adequate quantity and reduction in the over loading of equipment in the down stream of gas path with fly ash. In a pressurized fluidized bed gasifier the bed ash is removed by using rotary bucket type extractors through ash coolers. The ash coolers having number of smaller diameter tubes through which the required quantity of cold water is flowing and the ash is flowing between the tubes and gets cooled. Problems are encountered with bridging of ash above the buckets, and falling of larger size foreign materials like refractory pieces get locked in the bucket causing arresting rotation of bucket resulting to stop the extraction. OBJECTS OF THE INVENTION An object of this invention is to propose a water cooled high temperature bulk solid removing system, used to continuously or intermittently remove the bulk solids from the bed of a pressurized fluidized bed gasifier to a receiver vessel. Another object of this invention is to propose a water cooled high temperature bulk solid removing system, which maintains the bed height. Still another object of this invention is to propose a water cooled high temperature bulk solid removing system, which increases the life of down stream equipment in the fly ash path. Yet another object of this invention is to propose a water cooled high temperature bulk solid removing system, which no rotating parts. A further object of this invention is to propose a water cooled high temperature bulk solid removing system, which is simple to, operate. A still further object of this invention is to propose a water cooled high temperature bulk solid removing system, which is efficient. DESCRIPTION OF INVENTION: According to this invention there is provided a water cooled high temperature bulk solid removing system comprising a water cooled ash diverter; and a water cooled ash cooler in flow communication with said water cooled ash diverter; the said water cooled ash diverter comprises a distributor having a plurality of gas nozzles, and distributor held to a gas plenum, vertical limbs provided in said diverter so that the hot particulates rises and fluidizes in said limbs, an inclined pipe preferably disposed at an angle of 20 to 50° for receiving the particles to be delivered to said ash cooler, and a water jacket.

The inclined pipe is preferably disposed at an angle of 20 to 50°C. The vertical limbs comprises a first and second limb, and having a height so as to allow an overflow from said second limb. The water cooled ash cooler comprises a distributor held to a plenum, a plurality of nozzles mounted on said distributor, an inclined tube for allowing the cooled particles to flow into an ash receiver. The inclined pipe provided with the cooler is disposed at an angle of 10 to 40°. A cooling water pipe is provided for said air cooler. DESCRIPTION WITH REFERENCE TO DRAWINGS Further objects and advantages of this invention will be more apparent from the ensuing description when read in conjunction with the accompanying drawing and wherein: Fig. 1 shows the water cooled high temperature bulk solid removing system of the present invention. When controlled quantity of inert gas or clean coal gas at ambient temperature is admitted to the distributor 01 (refer Fig.l) welded with bubble cap nozzles 02 through the gas inlet pipe 03 and dual gas plenum 04 with slightly more than the system pressure, cause two different fluidization velocities in both the vertical, left and right limbs 05&06, the hot material in the ash diverter starts fluidizing and rising up in both the left and right vertical limbs. The incoming ash particles from gaisifier cause the particles in the right Iimb06, having a height of 0.6m to 1.2m to over flow into the ash cooler through the inclined pipe 07 having an angle 0 ranging from 20° to 50°. The ash diverter above the distributor is enclosed with cooling water jacket pipes 08,09&10. The height above the nozzles located in the middle of the distributor is ranging from 0.8d to 1.2d. This action continues until the fluidizing gas is admitted to the ash diverter. The high temperature bulk solid water cooled ash diverter with fluidizing condition acts as a seal, allowing the material to the water cooled ash cooler. Similarly adequate and controlled quantity of compressed air or clean gas is admitted to the ash cooler distributor 11 (see Fig 1) welded with bubble cap nozzles 12, through air or gas inlet pipe 13 and air/gas plenum 14, with slightly more than the ash diverter pressure. This makes the hot bulk solids in the ash cooler 16 to start fluidizing, cooling and rise up causing the cooled bulk solids to slide down into the ash receiver vessel through the inclined tube 15 having angle a ranging from 10° to 40°. The air and gas mixture is vented through vent pipe 17 and the ash cooler above the distributor is enclosed with cooling water jacket pipe 18. Cooling water inlet and outlet pipes, pressure, temperature measuring ports and ash drain pipes are also shown in the sketch. The invention has features in the fluidizing nozzle design, fluidizing medium and application in high pressure gasification system.

WE CLAIM; 1. A water cooled high temperature bulk solid removing system comprising a water cooled ash diverter; and a water cooled ash cooler in flow communication with said water cooled ash diverter; the said water cooled ash diverter comprises a distributor having a plurality of gas nozzles, and distributor held to a gas plenum, vertical limbs provided in said diverter so that the hot particulates rises and fluidizes in said limbs, an inclined pipe preferably disposed at an angle of 20 to 50° for receiving the particles to be delivered to said ash cooler, and a water jacket. 2. A water cooled high temperature bulk solid removing system as claimed in claim 1 wherein vertical limbs comprises a first and second limb, and having a height between 0.6m to 1.2m so as to allow an overflow from said second limb. 3. A water cooled high temperature bulk solid removing system as claimed in claim 1 wherein water cooled ash cooler comprises a distributor held to a plenum, a plurality of nozzles mounted on said distributor, an inclined tube for allowing the cooled particles to flow into an ash receiver. 4. A water cooled high temperature bulk solid removing system as claimed in claim 1 wherein inclined pipe provided with the cooler is disposed at an angle of 10 to 40°. 5. A water cooled high temperature bulk solid removing system substantially as herein described and illustrated herein.

Documents

Sign in to open
Application documents
1 1855-DEL-2004-PA-(10-10-2008).pdf 10 Oct 2008
2 1855-DEL-2004-GPA-(10-10-2008).pdf 10 Oct 2008
3 1855-DEL-2004-Form-2-(10-10-2008).pdf 10 Oct 2008
4 1855-DEL-2004-Description (Complete)-(10-10-2008).pdf 10 Oct 2008
5 1855-DEL-2004-Correspondence-Others-(10-10-2008).pdf 10 Oct 2008
6 1855-DEL-2004-Claims-(10-10-2008).pdf 10 Oct 2008
7 1855-DEL-2004-Abstract-(10-10-2008).pdf 10 Oct 2008
8 1855-del-2004-form-2.pdf 21 Aug 2011
9 1855-del-2004-form-18.pdf 21 Aug 2011
10 1855-del-2004-form-1.pdf 21 Aug 2011
11 1855-del-2004-drawings.pdf 21 Aug 2011
12 1855-del-2004-description (complete).pdf 21 Aug 2011
13 1855-del-2004-correspondence-po.pdf 21 Aug 2011
14 1855-del-2004-correspondence-others.pdf 21 Aug 2011
15 1855-del-2004-claims.pdf 21 Aug 2011
16 1855-del-2004-abstract.pdf 21 Aug 2011
17 1855-DEL-2004_EXAMREPORT.pdf 30 Jun 2016
18 Other Patent Document [22-03-2017(online)].pdf 22 Mar 2017
19 Form 27 [30-03-2017(online)].pdf 30 Mar 2017
20 1855-DEL-2004-RELEVANT DOCUMENTS [15-03-2018(online)].pdf 15 Mar 2018
21 1855-DEL-2004-RELEVANT DOCUMENTS [23-03-2019(online)].pdf 23 Mar 2019
22 1855-DEL-2004-RELEVANT DOCUMENTS [17-03-2020(online)].pdf 17 Mar 2020
23 1855-DEL-2004-RELEVANT DOCUMENTS [22-09-2021(online)].pdf 22 Sep 2021
24 1855-DEL-2004-RELEVANT DOCUMENTS [11-07-2022(online)].pdf 11 Jul 2022

ERegister / renewals

Ceased
3rd Renewed 04 Jun 2009 Period 27 Sep 2006 – 27 Sep 2007 · CBR 4417 · Certificate 4469 ₹2,000
4th Renewed 04 Jun 2009 Period 27 Sep 2007 – 27 Sep 2008 · CBR 4417 · Certificate 4469 ₹2,000
5th Renewed 04 Jun 2009 Period 27 Sep 2008 – 27 Sep 2009 · CBR 4417 · Certificate 4469 ₹2,000
6th Renewed 04 Jun 2009 Period 27 Sep 2009 – 27 Sep 2010 · CBR 4417 · Certificate 4469 ₹2,000
7th Renewed 17 Aug 2010 Period 27 Sep 2010 – 27 Sep 2011 · CBR 6988 · Certificate 7090 ₹6,000
8th Renewed 24 Aug 2011 Period 27 Sep 2011 – 27 Sep 2012 · CBR 7575 · Certificate 8065 ₹6,000
9th Renewed 03 Sep 2012 Period 27 Sep 2012 – 27 Sep 2013 · CBR 8111 · Certificate 8376 ₹6,000
10th Renewed 29 Aug 2013 Period 27 Sep 2013 – 27 Sep 2014 · CBR 8939 · Certificate 8273 ₹6,000
11th Renewed 12 Sep 2014 Period 27 Sep 2014 – 27 Sep 2015 · CBR 18705 · Certificate 18254 ₹26,400
12th Renewed 02 Sep 2015 Period 27 Sep 2015 – 27 Sep 2016 · CBR 18902 · Certificate 15628 ₹26,400
13th Renewed 01 Sep 2016 Period 27 Sep 2016 – 27 Sep 2017 · CBR 25322 · Certificate 17865 ₹24,000
14th Renewed 25 Aug 2017 Period 27 Sep 2017 – 27 Sep 2018 · CBR 26668 · Certificate 34392 ₹24,000
15th Renewed 29 Aug 2018 Period 27 Sep 2018 – 27 Sep 2019 · CBR 22711 · Certificate 36848 ₹24,000
16th Renewed 19 Aug 2019 Period 27 Sep 2019 – 27 Sep 2020 · CBR 26301 · Certificate 42051 ₹40,000
17th Renewed 08 Sep 2020 Period 27 Sep 2020 – 27 Sep 2021 · CBR 29641 · Certificate 53726 ₹40,000
18th Renewed 17 Sep 2021 Period 27 Sep 2021 – 27 Sep 2022 · CBR 32805 · Certificate 64169 ₹40,000