Sign In to Follow Application
View All Documents & Correspondence

Side Channel For A Two Wheeler Vehicle

Abstract: Described herein is amodular frame assembly [102] for a vehicle [100].The modular frame assembly [102] includes a frontal frame arrangement [116] with a headstock [122], a rear frame arrangement [118], and at least one side-channel [120a], [120b] extending between and removably attached to each of the headstock [122] and the rear frame arrangement [118]. The side-channels [120a], [120b] include an inner surface [142a], [142b] and an external surface [144a], [144b]. The inner surface [142a], [142b] of each side-channel [120a], [120b] is provided with battery mounts, to mount and support a battery unit [106]. The external surface [144a] of the first side-channel [120a] includes a stand mounting region [152] to mount and support a stand [104]. The external surface [144b] of the second side-channel [120b] includes a unit mounting region [154] to mount and support a power distribution unit[108]. Figure 4

Get Free WhatsApp Updates!
Notices, Deadlines & Correspondence

Patent Information

Application #
Filing Date
28 November 2017
Publication Number
27/2020
Publication Type
INA
Invention Field
MECHANICAL ENGINEERING
Status
Email
filing@prismipr.com
Parent Application
Patent Number
Legal Status
Grant Date
2024-03-19
Renewal Date

Applicants

ATHER ENERGY PVT. LTD.
3rd Floor, Tower D, IBC Knowledge Park, Bannerghatta Main Road, Bengaluru-560029, Karnataka, India

Inventors

1. MAHEK MODI
A1402, Florentine, Hiranandani Gardens, Powai, Mumbai, India – 400076
2. BIKASH JYOTI BISWAS
House NO. 23, Kasturba Nagar, South Sarania, Ulubari, Guwahati, Assam, India - 781007
3. ADARSH KUMAR
Village: Shaharbanna Dakshin,Khajaraitha, PO: Kalwara, Dist: Khagaria, Bihar, India – 851216
4. SHARATH S VASISHTA
805/L, 15th cross, 7th Block (West), Jayanagar, Bangalore 560070
5. MUKUNDA M NIJAGAL
1120/1, 2nd cross, Nagappa Block, Bangalore, India - 560021
6. SURAJ VALLAMKONDA
#31, 1st Floor, 10th Cross, 6th Main, RBI Layout, JP Nagar 7th Phase, Bangalore, India – 560078
7. MIRZA MAZHER ALI BAIG
Baig Manzil, Gonti Street, Door No:7-3-17/A, Srikakulam, Andhra Pradesh, India - 532001

Specification

DESC:As Attached in PDF ,CLAIMS:As Attached in PDF

Documents

Application Documents

# Name Date
1 201741042681-STATEMENT OF UNDERTAKING (FORM 3) [28-11-2017(online)].pdf 2017-11-28
2 201741042681-PROVISIONAL SPECIFICATION [28-11-2017(online)].pdf 2017-11-28
3 201741042681-FORM FOR STARTUP [28-11-2017(online)].pdf 2017-11-28
4 201741042681-FORM FOR SMALL ENTITY(FORM-28) [28-11-2017(online)].pdf 2017-11-28
5 201741042681-FORM 1 [28-11-2017(online)].pdf 2017-11-28
6 201741042681-EVIDENCE FOR REGISTRATION UNDER SSI(FORM-28) [28-11-2017(online)].pdf 2017-11-28
7 201741042681-EVIDENCE FOR REGISTRATION UNDER SSI [28-11-2017(online)].pdf 2017-11-28
8 201741042681-DRAWINGS [28-11-2017(online)].pdf 2017-11-28
9 201741042681-Proof of Right (MANDATORY) [17-01-2018(online)].pdf 2018-01-17
10 201741042681-FORM-26 [18-01-2018(online)].pdf 2018-01-18
11 Correspondence By Agent_Form 1_22-01-2018.pdf 2018-01-22
12 201741042681-ENDORSEMENT BY INVENTORS [27-11-2018(online)].pdf 2018-11-27
13 201741042681-DRAWING [27-11-2018(online)].pdf 2018-11-27
14 201741042681-CORRESPONDENCE-OTHERS [27-11-2018(online)].pdf 2018-11-27
15 201741042681-COMPLETE SPECIFICATION [27-11-2018(online)].pdf 2018-11-27
16 201741042681-FORM 18 [07-06-2019(online)].pdf 2019-06-07
17 201741042681-FORM-26 [30-06-2020(online)].pdf 2020-06-30
18 201741042681-FORM 13 [30-06-2020(online)].pdf 2020-06-30
19 201741042681-FER.pdf 2021-12-07
20 201741042681-OTHERS [09-02-2022(online)].pdf 2022-02-09
21 201741042681-FER_SER_REPLY [09-02-2022(online)].pdf 2022-02-09
22 201741042681-DRAWING [09-02-2022(online)].pdf 2022-02-09
23 201741042681-CLAIMS [09-02-2022(online)].pdf 2022-02-09
24 201741042681-POA [17-04-2023(online)].pdf 2023-04-17
25 201741042681-FORM 13 [17-04-2023(online)].pdf 2023-04-17
26 201741042681-AMENDED DOCUMENTS [17-04-2023(online)].pdf 2023-04-17
27 201741042681-US(14)-HearingNotice-(HearingDate-29-02-2024).pdf 2024-01-31
28 201741042681-Correspondence to notify the Controller [24-02-2024(online)].pdf 2024-02-24
29 201741042681-FORM-26 [27-02-2024(online)].pdf 2024-02-27
30 201741042681-Written submissions and relevant documents [15-03-2024(online)].pdf 2024-03-15
31 201741042681-PatentCertificate19-03-2024.pdf 2024-03-19
32 201741042681-IntimationOfGrant19-03-2024.pdf 2024-03-19
33 201741042681-PROOF OF ALTERATION [25-09-2024(online)].pdf 2024-09-25

Search Strategy

1 201741042681E_06-12-2021.pdf

ERegister / Renewals

3rd: 22 Mar 2024

From 28/11/2019 - To 28/11/2020

4th: 22 Mar 2024

From 28/11/2020 - To 28/11/2021

5th: 22 Mar 2024

From 28/11/2021 - To 28/11/2022

6th: 22 Mar 2024

From 28/11/2022 - To 28/11/2023

7th: 22 Mar 2024

From 28/11/2023 - To 28/11/2024

8th: 11 Nov 2024

From 28/11/2024 - To 28/11/2025

9th: 03 Nov 2025

From 28/11/2025 - To 28/11/2026